{"polygon":{"geometries":[{"coordinates":[[[525207.9678390737,176325.7267649484],[525209.4178624533,176321.10137178155],[525232.1180205137,176329.0768592754],[525230.2679635256,176333.7769723315],[525207.9678390737,176325.7267649484]]],"type":"Polygon"}],"type":"geometrycollection"},"site_number":"20","appeal_decision_date":null,"ward":"Parsons Green And Sandford","appeal_decision":null,"appeal_start_date":null,"epc_number":null,"borough":"Hammersmith & Fulham","title_number":["unregistered"],"valid_date":"19/08/2026","status":"Approved","decision_process":"Delegated","secondary_street_name":null,"date_building_work_completed_under_previous_permission":null,"reference_no_of_permission_being_relied_on":null,"last_updated":"2026-10-19T15:40:00.417Z","decision_target_date":"19/10/2026","street_name":"Coniger Road","postcode":"SW6 3TA","site_name":null,"lpa_app_no":"P/2026/01692/HH","development_type":"Other house holder developments","locality":"London","application_type_full":"Householder planning permission","wgs84_polygon":{"coordinates":[[[-0.198662,51.472051],[-0.198643,51.472009],[-0.198313,51.472076],[-0.198338,51.472118],[-0.198662,51.472051]]],"type":"Polygon"},"bo_system":"Northgate M3","url_planning_app":"https://property.lbhf.gov.uk/NECSWS/ES/Presentation/Planning/OnlinePlanning/OnlinePlanningOverview?applicationNumber=P/2026/01692/HH","actual_completion_date":null,"application_type":"Householder","decision":"Approved","decision_date":"19/10/2026","date_building_work_started_under_previous_permission":null,"appeal_status":null,"centroid_easting":525217.0,"lpa_name":"Hammersmith & Fulham","decision_agency":"Borough","last_updated_by":"Northgate M3","last_synced":"2026-10-21T16:11:34.071Z","lapsed_date":"18/10/2029","description":"Erection of a rear extension at second floor level over part of the existing back addition; installation of 1no air conditioning unit and acoustic enclosure and 7no solar panels above the main flat roof at roof level; installation of 1no solar panel above the roof of second floor rear back addition and 2no solar panels above the roof of first floor rear back addition; replacement of the existing windows with new double glazed timber framed windows; Erection a Brise-Soleil shelter ground floor level on the rear elevation.","last_date_consultation_comments":"23/09/2026","application_details":{"no_additional_bedrooms":0,"total_gia_gained":6.5,"no_additional_bathrooms":0,"intended_commencement_date":"09/2026","intended_completion_date":"11/2026"},"pp_id":"14969038","actual_commencement_date":null,"uprn":"34067617","centroid_northing":176326.0,"subdivision_of_building":null,"centroid":{"lat":51.472051,"lon":-0.198532},"parking_details":null,"id":"Hammersmith_&_Fulham-P_2026_01692_HH","cil_liability":false,"decision_conditions":["Condition : 1 - The development hereby permitted shall not commence later than the expiration of 3 years beginning with the date of this planning permission.\r\n\r\nCondition required to be imposed by section 91(1)(a) of the Town and Country Planning Act 1990 (as amended by section 51 of the Planning and Compulsory Purchase Act 2004).\r\n","Condition : 2 - The development hereby permitted shall be carried out in complete accordance with the following approved drawings, other than where those details are altered pursuant to the conditions of this planning permission:\r\n\r\n- 88 02 04;\r\n- 88 02 02 (received 24/08/26);\r\n\r\nTo ensure full compliance with the planning application hereby approved and to prevent harm arising through deviations from the approved plans.\r\n","Condition : 3 - The development hereby approved shall be carried out and completed in accordance with the materials (including colour and finish) specified on the drawings hereby approved. The development shall be permanently retained in accordance with the approved details. Any works of making good to existing elevations shall be carried out in materials to match the elevation to which the works relate. \r\n\r\nTo ensure a satisfactory external appearance, in accordance with Policies DC1, DC4 and DC8 of the Local Plan (2018).\r\n","Condition : 4 - Prior to the occupation of the development hereby permitted, the window at second floor level in the south elevation [88 02 02] shall be fitted with obscure glass to a minimum level of obscurity equivalent to Pilkington Texture Glass Level 3, and shall be non-opening and fixed shut up to a height of 1.7m above the finished floor level. The window shall thereafter be permanently retained as approved. \r\n\r\nTo protect the amenities of adjoining occupiers in terms of privacy and overlooking in accordance with Policy HO11 of the Local Plan (2018).\r\n","Condition : 5 - The roof of the extension and the remainder of the roof of the existing back addition shall not be converted into or used as a terrace or other open amenity space. No alterations shall be carried out; nor planters or other chattels placed on the remainder of the roof of the back addition or the extension hereby approved. No railings or other means of enclosure shall be erected around the roof and no alterations shall be carried out to the property, including the extension hereby approved, to form an access onto the roof.\r\n\r\nSuch a use would be detrimental to the amenities of neighbouring properties by reason of overlooking and loss of privacy and potential noise and disturbance, contrary to Policies CC11 and HO11 of the Local Plan (2018).\r\n","Condition : 6 - No water tanks, water tank enclosures or other structures (excluding solar panels and air source heat pumps) shall be erected upon the roof of the extension  hereby permitted.  \r\n\r\nIt is considered that such structures would seriously detract from the appearance of the building, contrary to Policies DC4 and DC8 of the Local Plan (2018).\r\n","Condition : 7 - The external sound level emitted from air conditioning unit and acoustic enclosure at the development hereby approved shall be lower than the lowest existing background sound level by at least 10 dBA in order to prevent any adverse impact. The assessment shall be made in accordance with BS8233:2014 guidelines at the nearest and/or most affected noise sensitive premises, with all air conditioning units operating together at maximum capacity.\r\n\r\n To ensure that the amenity of occupiers of the development site/ surrounding premises is not adversely affected by noise from mechanical plant, in accordance with Policies CC11 and CC13 of the Local Plan 2018.\r\n","Condition : 8 - Prior to use, the air conditioning unit at the development shall be mounted\r\nwith proprietary anti-vibration isolators and fan motors shall be vibration isolated from\r\nthe casing and adequately silenced and maintained as such.\r\n\r\nTo ensure that the amenity of occupiers of the development site/ surrounding\r\npremises is not adversely affected by vibration, in accordance with Policies CC11 and\r\nCC13 of the Local Plan 2018.\r\n"]}