{"date_building_work_completed_under_previous_permission":null,"decision_process":"Delegated","site_number":null,"url_planning_app":"https://property.lbhf.gov.uk/NECSWS/ES/Presentation/Planning/OnlinePlanning/OnlinePlanningOverview?applicationNumber=P/2026/02457/FUL","polygon":{"geometries":[{"coordinates":[[[525222,177643.65],[525215.8,177654.25],[525214.6,177656.35],[525210.4,177654.15],[525214,177648.1],[525218,177641.3],[525218.8,177639.95],[525219,177640.05],[525222.83,177642.24],[525222,177643.65]]],"type":"Polygon"}],"type":"GeometryCollection"},"description":"The proposed works include replacement of all front elevation windows from Single glazed Timber Sash windows to Double Glazed Timber Sash windows. Replacement of all rear elevation windows from Single glazed Timber Sash and casement windows to Double Glazed uPVC Sash and casement windows. \nReplacement of all external doors, rear doors in Double Glazed uPVC and front doors in Double Glazed timber. Renew Gutters, downpipes and fascias front and rear.","epc_number":null,"ward":"Lillie","last_updated":"2026-10-12T13:30:17.312Z","street_name":null,"decision_conditions":null,"actual_completion_date":null,"bo_system":"Northgate M3","borough":"Hammersmith & Fulham","parking_details":null,"last_synced":"2026-10-21T16:11:49.088Z","lapsed_date":null,"actual_commencement_date":null,"cil_liability":false,"centroid_easting":525205,"wgs84_polygon":{"type":"Polygon","coordinates":[[[-0.197993,51.483892],[-0.198079,51.483989],[-0.198095,51.484008],[-0.198157,51.483989],[-0.198107,51.483934],[-0.198052,51.483872],[-0.198041,51.48386],[-0.198038,51.48386],[-0.197982,51.483879],[-0.197993,51.483892]]]},"decision_date":null,"lpa_name":"Hammersmith & Fulham","status":"Application Received","appeal_decision":null,"appeal_status":null,"secondary_street_name":null,"application_type_full":"Full planning permission","lpa_app_no":"P/2026/02457/FUL","centroid_northing":177638,"date_building_work_started_under_previous_permission":null,"last_updated_by":"Planning Portal ingest","application_details":{"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"1","intended_commencement_date":"11/2026","intended_completion_date":"12/2026"}],"total_gia_gained":0,"site_area":0.0155,"total_gia_existing":43,"total_gia_lost":0,"existing_proposed_floorspace_details":[{"gia_existing":43,"use_class":"C3","gia_gained":0,"gia_lost":0}],"projected_cost_of_works":"Up to £2m","occupation_status":"Occupied","scheme_phasing":true,"rain_water_harvesting":false,"grey_water_reuse":false,"green_suds":false,"surface_water_discharge_percentage_reduction":100,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":0,"total_gia_existing":43,"total_gia_lost":0},"garden_land_lost":false,"internal_resi_water_usage":0,"infrastructure_details":{"total_annual_pm_emissions":0,"no_resi_units_to_have_full_fibre":0,"green_roof_area":0,"urban_greening_factor_score":0,"no_new_water_connections_required":0,"no_homes_passive_cooling":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"waste_provision":true,"percentage_demolition_construction_material_recycling":100,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"ghg_reduction_over_building_regulations":false},"ownership_status":"Private"},"locality":"London","centroid":{"lat":51.483845,"lon":-0.19824},"subdivision_of_building":null,"appeal_decision_date":null,"development_type":"Minor dwellings","reference_no_of_permission_being_relied_on":null,"application_type":"All Other","valid_date":"24/09/2026","pp_id":"15239189","decision_target_date":"19/11/2026","site_name":"128-132 Halford Road","decision":null,"appeal_start_date":null,"postcode":"SW6 1JX","last_date_consultation_comments":"28/10/2026","id":"Hammersmith_&_Fulham-P_2026_02457_FUL","decision_agency":"Borough","uprn":null,"title_number":null}