{"date_building_work_completed_under_previous_permission":null,"decision_process":"Delegated","site_number":"260","url_planning_app":"https://property.lbhf.gov.uk/NECSWS/ES/Presentation/Planning/OnlinePlanning/OnlinePlanningOverview?applicationNumber=P/2026/02544/NMAT","polygon":{"geometries":[{"coordinates":[[[524933.6165514187,177664.1269050396],[524940.2166725285,177651.52638506546],[524965.6166101017,177665.17638539147],[524959.266796794,177677.42696052697],[524933.6165514187,177664.1269050396]]],"type":"Polygon"}],"type":"geometrycollection"},"description":"Non-material amendment to planning permission ref: 2022/03651/FUL granted 11th June 2025 for the 'Demolition of existing buildings at 260-262 North End Road; erection of a replacement part one, part three, part four storey, part five storey building comprising of one retail unit (Class E(a)), 394sqm office floorspace (Class E(g)) and 9 self-contained residential units (Class C3)' to allow amendments to the approved drawings to include: alterations to the main residential stair core to accommodate an \r\nevacuation lift, reconfiguration of access to the flats to enable the installation of a single smoke ventilated corridor at each floor level, increasing the size of the plantroom, re-configuration of the ground floor, re-configuration of Flat 5, increasing the size of the studio flats and external walls have been set out to brick dimensions.","epc_number":null,"ward":"Lillie","last_updated":"2026-11-12T13:50:01.159Z","street_name":"North End Road","decision_conditions":["Condition : 1 - Condition 2 Approved Drawings \r\n\r\nThe development shall be carried out and completed in accordance with the following\r\napproved drawings:\r\n5580-BAL-ZZ-00-DR-A-07-0101 Rev P3 ground floor (replacing 01_110); \r\n5580-BAL-ZZ-01-DR-A-07-0102_P3 1st floor (replacing 01_111);\r\n5580-BAL-ZZ-02-DR-A-07-0103_P3 2nd floor (replacing 01_112); \r\n5580-BAL-ZZ-03-DR-A-07-0104_P3 3rd floor (replacing 01_113); \r\n5580-BAL-ZZ-04-DR-A-07-0105_P3 4th floor (replacing 01_114); \r\n5580-BAL-ZZ-R-DR-A-07-0106_P3 roof plan (replacing 01_115); \r\n5580-BAL-ZZ-ZZ-DR-A-07-0011 Rev P1 east elevation (replacing 02_110); \r\n5580-BAL-ZZ-ZZ-DR-A-07-0012  Rev P1 south elevation (replacing 02_111), \r\n5580-BAL-ZZ-ZZ-DR-A-07-0013 Rev P1 west elevation (replacing 02_112); \r\n5580-BAL-ZZ-ZZ-DR-A-07-0014 Rev P1 north elevation (replacing 02_113); \r\n5580-BAL-ZZ-ZZ-DR-A-07-0015 Rev P1 Section A-A (replacing 03_110);\r\n03_111 Section B-B;\r\n5580-BAL-ZZ-ZZ-DR-A-07-0016 Rev P1 Section CC (replacing 03 112;\r\n20_110 east fa�ade detail; and\r\n20_111 south fa�ade detail\r\n\r\nReason: In order to ensure full compliance with the planning application hereby approved and to prevent harm arising through deviations from the approved plans, in accordance with Policies DCI and DC4 of the Local Plan (2018).\r\n","Condition : 2 - Condition 33 Cycle parking \r\nThe development hereby approved shall be carried out and completed in accordance with the details of the proposed storage of 31 cycles (14 long-stay in connection with the commercial unit, and 17 long-stay in connection with the residential units) as follows:\r\n\r\nDwg 5580-BAL-ZZ-00-DR-A-07-0101 Rev P3 ground floor \r\n\r\nThere development shall not be occupied until the cycle storage provision has been made in accordance with the agreed details, and it shall be permanently retained and maintained for the life Of the development.\r\n\r\nTo ensure satisfactory provision for the cycles and thereby promote sustainable and active modes of transport, in accordance with Policy T3 of the Local Plan (2018).","Condition : 3 - Condition 39 Fire Statement \r\n \r\nThe development shall be carried out and completed in full accordance with the details contained within the approved Fire Statement (Prepared by LPEC Fire dated 30th September 2026, Rev P02). No part of the development shall be used or occupied until all mitigation, measures and means within the approved document have been implemented in full and shall thereafter be retained for the lifetime of the building hereby approved.\r\n \r\nReason: To ensure that the development incorporates the necessary fire safety measures in accordance with the Policy D12 of the London Plan (2021)."],"actual_completion_date":null,"bo_system":"Northgate M3","borough":"Hammersmith & Fulham","parking_details":null,"last_synced":"2026-11-13T02:15:52.460Z","lapsed_date":"11/11/2029","actual_commencement_date":null,"cil_liability":false,"centroid_easting":524951.0,"wgs84_polygon":{"type":"Polygon","coordinates":[[[-0.202137,51.48414],[-0.202046,51.484025],[-0.201676,51.484142],[-0.201763,51.484254],[-0.202137,51.48414]]]},"decision_date":"12/11/2026","lpa_name":"Hammersmith & Fulham","status":"Application Received","appeal_decision":null,"appeal_status":null,"secondary_street_name":null,"application_type_full":"Non-Material Amendment","lpa_app_no":"P/2026/02544/NMAT","centroid_northing":177666.0,"date_building_work_started_under_previous_permission":null,"last_updated_by":"Northgate M3","application_details":{},"locality":"London","centroid":{"lat":51.484153,"lon":-0.201886},"subdivision_of_building":null,"appeal_decision_date":null,"development_type":"County Matters","reference_no_of_permission_being_relied_on":null,"application_type":"All Other","valid_date":"05/10/2026","pp_id":"15268725","decision_target_date":"02/11/2026","site_name":".","decision":"Approved","appeal_start_date":null,"postcode":"SW6 1NJ","last_date_consultation_comments":"05/10/2026","id":"Hammersmith_&_Fulham-P_2026_02544_NMAT","decision_agency":"Borough","uprn":"34050957","title_number":null}