{"date_building_work_completed_under_previous_permission":null,"decision_process":"Delegated","site_number":"4","url_planning_app":"https://property.lbhf.gov.uk/NECSWS/ES/Presentation/Planning/OnlinePlanning/OnlinePlanningOverview?applicationNumber=P/2026/02558/NMAT","polygon":{"geometries":[{"coordinates":[[[525868.9186395749,177012.11759477312],[525910.1666677587,177054.87543074077],[525917.4667068846,177048.20065977034],[525913.7169772529,177043.9508234052],[525943.2946554039,177015.81686288735],[525927.4650787428,177004.2525022148],[525915.7849546785,177011.28845787278],[525907.3168664121,177002.22628260741],[525913.1169999209,176996.7261327907],[525898.5668039465,176981.77529104095],[525868.9186395749,177012.11759477312]]],"type":"Polygon"}],"type":"geometrycollection"},"description":"Non-material amendment to planning permission ref: 2020/01499/FUL granted 28th January 2021 for the 'Demolition of existing buildings and redevelopment including the erection of a part one, part 3 storey building and a 6 storey building plus basement to provide 31 flats (Use Class C3) and commercial floorspace (Use Class B1a and D2) with associated parking, landscaping and amenity space'. Amendments to conditions 19, 22, 23, 24 and 37 to require details to be submitted and or implemented prior to the occupation or use of relevant part of the development'.","epc_number":null,"ward":"Parsons Green And Sandford","last_updated":"2026-11-02T15:50:00.336Z","street_name":"Sotheron Place","decision_conditions":["Condition : 1 - Condition 19 \r\nPrior to above grade works of the development, details shall be submitted to and approved in writing by the Council, of an enhanced sound insulation value DnT,w and L'nT,w of at least 5dB above the Building Regulations value, for the floor/ceiling/wall structures separating different types of rooms/uses in adjoining dwellings. Approved details shall be implemented prior to occupation of the relevant part of the development and thereafter be permanently retained.\r\n\r\nTo ensure that the amenity of occupiers of the development site is not adversely affected by noise, in accordance with Policies CC11 and CC13 of the Hammersmith and Fulham Local Plan 2018.\r\n","Condition : 2 - Condition 22 \r\nPrior to occupation of the relevant commercial unit, details of anti-vibration measures shall be submitted to and approved in writing by the Council. The measures shall ensure that machinery, plant/equipment, extract/ventilation system and ducting are mounted with proprietary anti-vibration isolators and fan motors are vibration isolated from the casing and adequately silenced. Approved details shall be implemented prior to occupation of the relevant commercial unit and thereafter be permanently retained.\r\n\r\nTo ensure that the amenity of occupiers of the development site/ surrounding premises is not adversely affected by vibration, in accordance with Policies CC11 and CC13 of the Hammersmith and Fulham Local Plan 2018.\r\n","Condition : 3 - Condition 23 \r\nPrior to occupation of the first residential unit, an Ultra Low Emission Strategy for the operational phase shall be submitted to and approved in writing by the Council. The Ultra Low Emission Strategy must detail the remedial action and mitigation measures that will be implemented to protect receptors (e.g. abatement technology for energy plant, design solutions). This Strategy must make a commitment to implement the mitigation measures (including zero emissions heating and energy plant) that are required to reduce the exposure of future residents to poor air quality and to help mitigate the development's air pollution impacts, in particular the emissions of NOx and particulates from on-site and off-site transport via a Ultra Low Emission Vehicle Plan (ULEVP) e.g. use of on-road Ultra Low Emission Vehicles in accordance with the emissions hierarchy \r\n\r\n(1) Electric Vehicle (Zero emission), \r\n(2) Hybrid (non-plug in) Electric Vehicle (HEV), \r\n(3) Plug-in Hybrid Electric Vehicle (PHEV), \r\n(4) Alternative Fuel e.g. CNG, LPG,\r\n(5) Petrol \r\n(6) Diesel (Euro 6-HGV) and energy generation sources. \r\n\r\nThe strategy must re-assess air quality neutral and or air quality positive in accordance with the Mayor of London guidance. Approved details shall be fully implemented prior to occupation of the first residential unit and thereafter permanently retained and maintained in accordance with the approved details.\r\n\r\nTo comply with the requirements of the NPPF, Policy SI1 of the London Plan and Policy CC10 of the Local Plan 2018.  \r\n","Condition : 4 - Condition 24 \r\nPrior to occupation of the requisite part of the building containing B1, C3 and D2 use, a ventilation strategy report shall be submitted to and approved in writing by the Council demonstrating that the use avoids areas of exceedance above the annual mean objective APEC-B (38ug/m-3) criteria for NO2 and WHO air quality guideline values for Particulates (PM2.5, PM10) and  and include the following information: \r\n\r\na. Details of the air intake locations at roof level on the rear elevations \r\nb. Design details and locations of openable windows of all habitable rooms (Bedrooms and Living Rooms) for C3 use \r\nc. One month after installation, details of the independently tested mechanical ventilation system with NOx, PM2.5, PM10 filtration for B1 and C3 use. \r\n\r\nThe NO2 filtration system shall have a minimum efficiency of 90% in the removal of Nitrogen Oxides/Dioxides, PM2.5 and PM10 in accordance with BS EN ISO 10121-1:2014 and BS EN ISO 16890:2016. The whole system shall be designed to prevent summer overheating and minimise energy usage. Chimney/boiler flues and ventilation extracts shall be positioned a suitable distance away from ventilation intakes, openable windows, balconies, terraces, and receptors. The maintenance and cleaning of the systems shall be undertaken regularly in accordance with manufacturer specifications and shall be the responsibility of the primary owner of the property. Approved details shall be fully implemented prior to the occupation/use of the relevant part of the development and thereafter permanently retained and maintained.\r\n\r\nTo comply with the requirements of the NPPF, Policy SI1 of the London Plan and Policy CC10 of the Local Plan 2018.  \r\n","Condition : 5 - Condition 37 \r\nThe development hereby permitted shall not be occupied before implementation of the sustainable design and construction measures detailed in the submitted Sustainability Statement and BREEAM Assessment. Prior to occupation of the commercial units a post construction BREEAM assessment shall be submitted to and approved in writing by the Council which confirms that the \"Very Good\" Rating has been achieved. Prior to the first occupation of the residential units, a supporting statement shall be submitted to and approved in writing by the Council to confirm that the residential sustainability measures have been implemented. All details thereafter shall be implemented prior to occupation/use of the relevant residential or commercial element of the development, and thereafter be permanently retained.\r\n\r\nTo ensure a satisfactory external appearance and the integration of energy generation from renewable sources, consistent with the Mayor's sustainable design objectives in accordance with Policies SI 2, SI 4, SI 5 and D4 of The London Plan 2021 and Policies DC1 and CC2 of the Hammersmith and Fulham Local Plan 2018.\r\n"],"actual_completion_date":null,"bo_system":"Northgate M3","borough":"Hammersmith & Fulham","parking_details":null,"last_synced":"2026-11-03T02:48:42.071Z","lapsed_date":"02/11/2029","actual_commencement_date":null,"cil_liability":false,"centroid_easting":525891.0,"wgs84_polygon":{"type":"Polygon","coordinates":[[[-0.188906,51.478073],[-0.188298,51.478448],[-0.188195,51.478387],[-0.18825,51.478349],[-0.187835,51.47809],[-0.188067,51.477989],[-0.188232,51.478055],[-0.188357,51.477976],[-0.188276,51.477925],[-0.188491,51.477794],[-0.188906,51.478073]]]},"decision_date":"02/11/2026","lpa_name":"Hammersmith & Fulham","status":"Approved","appeal_decision":null,"appeal_status":null,"secondary_street_name":null,"application_type_full":"Non-Material Amendment","lpa_app_no":"P/2026/02558/NMAT","centroid_northing":177000.0,"date_building_work_started_under_previous_permission":null,"last_updated_by":"Northgate M3","application_details":{},"locality":"London","centroid":{"lat":51.477959,"lon":-0.188593},"subdivision_of_building":null,"appeal_decision_date":null,"development_type":"County Matters","reference_no_of_permission_being_relied_on":null,"application_type":"All Other","valid_date":"07/10/2026","pp_id":"15266388","decision_target_date":"04/11/2026","site_name":null,"decision":"Approved","appeal_start_date":null,"postcode":"SW6 2EJ","last_date_consultation_comments":"07/10/2026","id":"Hammersmith_&_Fulham-P_2026_02558_NMAT","decision_agency":"Borough","uprn":"34151484","title_number":null}