{"actual_commencement_date":null,"date_building_work_completed_under_previous_permission":null,"lpa_name":"Harrow","subdivision_of_building":null,"appeal_decision":null,"lapsed_date":"07/04/2026","appeal_decision_date":null,"last_updated_by":"Portal","reference_no_of_permission_being_relied_on":null,"epc_number":null,"last_updated":"2026-04-22T11:34:52.413Z","url_planning_app":"https://planningsearch.harrow.gov.uk//planning/index.html?fa=getApplication&id=232445","street_name":"HIGH VIEW","parking_details":null,"ward":"Pinner South","bo_system":"Portal","site_name":null,"site_number":"11","application_details":{},"uprn":"100021302296","locality":null,"date_building_work_started_under_previous_permission":null,"postcode":"HA5 3NZ","valid_date":"10/02/2026","cil_liability":true,"actual_completion_date":null,"centroid":{"lat":49.766807,"lon":-7.55716},"centroid_easting":null,"application_type_full":"Removal/Variation of a condition","pp_id":"14628280","lpa_app_no":"PL/0369/26","polygon":{"geometries":[{"coordinates":[[[511620.398079553,189598.461729337],[511607.845503625,189594.214461473],[511624.595165933,189535.487302546],[511640.149729644,189541.669429621],[511620.398079553,189598.461729337]]],"type":"Polygon"}],"crs":{"properties":{"name":"EPSG:27700"},"type":"name"},"type":"geometrycollection"},"id":"Harrow-PL_0369_26","appeal_status":null,"appeal_start_date":null,"description":"Variation of condition 2 (approved plans) attached to planning permission PL/0027/24 dated 16/10/2024 to allow overall reduction of gross internal floor area; balcony to rear elevation; external alterations","development_type":"Minor dwellings","decision_conditions":["No demolition or site works in connection with the development hereby permitted shall commence before:-\r\n(a) the frontage.\r\n(b) the boundary.\r\nof the site is enclosed by a close boarded fence to a minimum height of 2 metres.  Such fencing shall remain until works and clearance have been completed, and the development is ready for occupation.","The development hereby permitted shall be begun before three years from the date of planning permission&nbsp;<span style=\"line-height: 115%;\"><span style=\"line-height: 115%;\">PL/0027/24 dated 16/10/2024.</span>&nbsp;</span>","The development hereby permitted shall not commence until there has been submitted to, and approved by, the local planning authority, a scheme of hard and soft landscape works which shall include a survey of all existing trees and hedgerows on the land, indicating those to be retained and those to be lost.  Details of those to be retained, together with measures for their protection in the course of the development, shall also be submitted and approved, and carried out in accordance with such approval, prior to any demolition or any other site works, and retained until the development is completed.  Soft landscape works shall include: planting plans, and schedule of plants, noting species, plant sizes and proposed numbers/densities.","All planting, seeding or turfing comprised in the approved details of landscaping shall be carried out in the first planting and seeding seasons following the occupation of the building(s), or the completion of the development, whichever is the sooner.  Any existing or new trees or shrubs which, within a period of 5 years from the completion of the development, die, are removed, or become seriously damaged or diseased, shall be replaced in the next planting season, with others of a similar size and species, unless the local authority agrees any variation in writing.","The development hereby permitted shall not commence until samples of the materials to be used in the construction of the external surfaces noted below have been submitted to, and approved in writing by, the local planning authority:\r\n(a) the extension/building(s)\r\n(b) the ground surfacing\r\n(c) the boundary treatment\r\nThe development shall be completed in accordance with the approved details and shall thereafter be retained.","The development hereby permitted shall be carried out in accordance with the following approved plans and documents:&nbsp;<span style=\"line-height: 115%;\">2107\r\nEX00A; 2107 EX01A; 2107 EX02A; 2107 EX03B; 594-PL 102E; 594-PL 200G; 594-PL 201B;\r\n594-PL 300E; 594-PL 301D; &nbsp;594-PL 400D; Design\r\nAnd Access Statement; Fire Statement; Cover Statement – Application for\r\nvariation of Condition No.2.</span>","&lt;p class=&quot;MsoNormal&quot;&gt;No development shall take place, including any works of\r\ndemolition, until a Construction Method Statement has been submitted to, and\r\napproved in writing by, the local planning authority. The Method Statement\r\nshall provide for:&lt;o:p&gt;&lt;/o:p&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot;&gt;(a) detailed timeline for the phases and implementation of\r\nthe development;&lt;o:p&gt;&lt;/o:p&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot;&gt;(b) demolition method statement;&lt;o:p&gt;&lt;/o:p&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot;&gt;(c) the parking of vehicles of site operatives and visitors;&lt;o:p&gt;&lt;/o:p&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot;&gt;(d) loading and unloading of plant and materials;&lt;o:p&gt;&lt;/o:p&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot;&gt;(e) storage of plant and materials used in constructing the\r\ndevelopment;&lt;o:p&gt;&lt;/o:p&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot;&gt;(f) measures to control the emission of dust and dirt during\r\nconstruction; and&lt;o:p&gt;&lt;/o:p&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot;&gt;(g) scheme for recycling/disposing of waste resulting from\r\ndemolition and construction works.&lt;o:p&gt;&lt;/o:p&gt;&lt;/p&gt;&lt;p&gt;\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot;&gt;The development shall be carried out in accordance with the\r\napproved Method Statement &amp;amp; Logistics Plan, or any amendment or variation\r\nto it as may be agreed in writing by the local planning authority throughout\r\nthe construction period. This is a PRE-COMMENCEMENT Condition.&lt;o:p&gt;&lt;/o:p&gt;&lt;/p&gt;","&lt;p class=&quot;MsoNormal&quot;&gt;Prior to commencement of ground development (with the except\r\nof demolition or site survey work), full details of the means of foul surface\r\nwater disposal shall be submitted to and approved by the Local Planning\r\nAuthority. Connection to the Public Sewer should be the first considered method\r\nof sewage disposal, however if the intention is not to connect to mains\r\ndrainage the submitted details must demonstrate why this is not practicable and\r\nprovide full details of the size, location and maintenance regimes of any\r\ntreatment system.&amp;nbsp;&lt;o:p&gt;&lt;/o:p&gt;&lt;/p&gt;","&lt;p class=&quot;MsoNormal&quot;&gt;The construction of the dwellinghouse hereby granted, shall\r\nnot commence until works for the disposal of surface water, and surface water\r\nattenuation/storage have been submitted to, and approved in writing by, the\r\nlocal planning authority. The development shall be carried out in accordance\r\nwith these approved details and shall thereafter be retained.&lt;o:p&gt;&lt;/o:p&gt;&lt;/p&gt;","Before the hard surfacing hereby permitted is brought into use the surfacing shall EITHER be constructed from porous materials, for example, gravel, permeable block paving or porous asphalt, OR provision shall be made to direct run-off water from the hard surfacing to a permeable or porous area or surface within the curtilage of the site.\r\nPlease note: guidance on permeable paving has now been published by the Environment Agency on http://www.communities.gov.uk/publications/planningandbuilding/pavingfrontgardens.","Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015  (or any order revoking or re-enacting that order with or without modification), no development which would otherwise fall within Classes A, B and D in Part 1 of Schedule 2 to that Order shall be carried out without the prior written permission of the local planning authority.&amp;nbsp;","&lt;p class=&quot;MsoNormal&quot;&gt;Prior to the commencement of the development hereby\r\napproved, a Fire Safety Statement shall be submitted to and approved in writing\r\nby the Local Planning Authority, this statement shall include details of how\r\nthe development will function in terms of the following: &lt;o:p&gt;&lt;/o:p&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot;&gt;1) identify suitably positioned unobstructed outside space:\r\na) for fire appliances to be positioned on b) appropriate for use as an\r\nevacuation assembly point&lt;o:p&gt;&lt;/o:p&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot;&gt;2) is designed to incorporate appropriate features which\r\nreduce the risk to life and the risk of serious injury in the event of a fire;\r\nincluding appropriate fire alarm systems and passive and active fire safety\r\nmeasures &lt;o:p&gt;&lt;/o:p&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot;&gt;3) is constructed in an appropriate way to minimise the risk\r\nof fire spread&lt;o:p&gt;&lt;/o:p&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot;&gt;4) provide suitable and convenient means of escape, and\r\nassociated evacuation strategy for all building users&lt;o:p&gt;&lt;/o:p&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot;&gt;5) develop a robust management strategy for evacuation which\r\nis to be periodically updated and published (details of how often this\r\nmanagement strategy is to be reviewed and published to be included), and which\r\nall building users can have confidence in &lt;o:p&gt;&lt;/o:p&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot;&gt;6) provide suitable access and equipment for firefighting\r\nwhich is appropriate for the size and use of the development.&lt;o:p&gt;&lt;/o:p&gt;&lt;/p&gt;&lt;p&gt;\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot;&gt;The development shall be operated in accordance with the\r\napproved details in perpetuity.&lt;o:p&gt;&lt;/o:p&gt;&lt;/p&gt;","&lt;p&gt;No development shall take place, including any works of demolition, until a Construction Environmental&lt;/p&gt;&lt;p&gt;Management Plan (CEMP) has been submitted to, and approved in writing by, the local planning authority.&lt;/p&gt;&lt;p&gt;The CEMP shall provide for:&lt;/p&gt;&lt;p&gt;(a) a preliminary ecological appraisal and preliminary roost assessment;&lt;/p&gt;&lt;p&gt;(b) a method statement detailing how any protected species will be protected during demolition and&lt;/p&gt;&lt;p&gt;construction;&lt;/p&gt;&lt;p&gt;(c) details of construction lighting;&lt;/p&gt;&lt;p&gt;(d) any permanent fixtures to be included as part of the final development to preserve or mitigate the&lt;/p&gt;&lt;p&gt;disruption of protected species habitats or passageways.&lt;/p&gt;&lt;p&gt;Should the preliminary ecological appraisal and preliminary roost assessment confirm the presence of bat&lt;/p&gt;&lt;p&gt;roosts a Protected Species Survey shall be submitted to and approved in writing by the local planning&lt;/p&gt;&lt;p&gt;authority. Otherwise, the works shall be carried out in accordance with the approved CEMP, or any&lt;/p&gt;&lt;p&gt;amendment or variation to it as may be agreed in writing by the local planning authority throughout the&lt;/p&gt;&lt;p&gt;construction period.&lt;/p&gt;&lt;p&gt;This is a PRE-COMMENCEMENT Condition.&lt;/p&gt;&lt;p&gt;&lt;br&gt;&lt;/p&gt;","The window(s) in the flank elevation(s) of the proposed development shall:\r\n(a) be of purpose-made obscure glass,\r\n(b) be permanently fixed closed below a height of 1.7m above finished floor level,\r\nand shall thereafter be retained in that form.","Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (or any order revoking and re-enacting that order with or without modification), no window(s)/door(s), other than those shown on the approved plans shall be installed in the flank elevation(s) of the development hereby permitted without the prior permission in writing of the local planning authority."],"last_synced":"2026-04-23T02:42:50.079Z","secondary_street_name":null,"title_number":null,"last_date_consultation_comments":"10/03/2026","decision_process":"Delegated","centroid_northing":null,"borough":"Harrow","decision":"Approved","application_type":"All Other","wgs84_polygon":{"coordinates":[[[-0.390003,51.594185],[-0.390186,51.59415],[-0.389963,51.593619],[-0.389736,51.593671],[-0.390003,51.594185]]],"type":"Polygon"},"decision_agency":"Borough","decision_target_date":"07/04/2026","status":"Approved","decision_date":"07/04/2026"}