{"actual_commencement_date":null,"date_building_work_completed_under_previous_permission":null,"lpa_name":"Harrow","subdivision_of_building":null,"appeal_decision":null,"lapsed_date":"21/04/2026","appeal_decision_date":null,"last_updated_by":"Portal","reference_no_of_permission_being_relied_on":null,"epc_number":"2530-3006-2305-5809-7204","last_updated":"2026-04-28T06:20:52.647Z","url_planning_app":"https://planningsearch.harrow.gov.uk//planning/index.html?fa=getApplication&id=232532","street_name":"1-8 CASTLE MEWS","parking_details":{"net_cycle":10,"no_existing_cycle":0,"no_proposed_cycle":10},"ward":"Marlborough","bo_system":"Portal","site_name":"1 To 8 Castle Mews","site_number":"1","application_details":{"total_gia_existing":204,"ownership_status":"Private","phasing_details":[{"phase_detail":"ROOF EXTENSION","intended_completion_date":"09/2025","intended_commencement_date":"04/2025"}],"garden_land_lost":false,"total_gia_gained":495,"existing_proposed_floorspace_details":[{"gia_existing":204,"use_class":"C3","gia_gained":495,"gia_lost":0}],"green_suds":false,"scheme_phasing":true,"infrastructure_details":{"no_homes_passive_cooling":0,"no_homes_to_have_electrical_heating":8,"total_annual_pm_emissions":0,"no_new_water_connections_required":0,"waste_provision":true,"no_new_gas_connections_required":0,"no_non_resi_units_to_have_full_fibre":0,"no_resi_units_to_have_full_fibre":0,"percentage_demolition_construction_material_recycling":50,"green_roof_area":141,"urban_greening_factor_score":5,"mobile_network_operators_consultation":false,"ghg_reduction_over_building_regulations":false,"fire_suppression_system_proposed":false,"total_annual_nox_emissions":0},"rain_water_harvesting":false,"projected_cost_of_works":"Up to £2m","building_details":[{"no_storeys":2,"max_height":6.1,"building_ref":"1-8"}],"internal_resi_water_usage":110,"affordable_housing_fast_track":false,"total_gia_lost":0,"surface_water_discharge_percentage_reduction":50,"site_area":0.06,"grey_water_reuse":false,"non_residential_details":{"total_gia_existing":204,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_lost":0,"total_gia_gained":495,"total_non_resi_gross_internal_floor_area_to_be_gained":0}},"uprn":"10095545332","locality":null,"date_building_work_started_under_previous_permission":null,"postcode":"HA1 1HP","valid_date":"24/02/2026","cil_liability":null,"actual_completion_date":null,"centroid":{"lat":49.766807,"lon":-7.55716},"centroid_easting":null,"application_type_full":"Full planning permission","pp_id":"14709001","lpa_app_no":"PL/0435/26","polygon":{"geometries":[{"coordinates":[[[515577.422687081,189072.942029565],[515569.585647506,189072.529742239],[515568.593238401,189085.239081233],[515584.389577111,189090.972338737],[515593.075957028,189043.863446484],[515581.876339422,189041.972773195],[515580.947848792,189046.740724084],[515577.422687081,189072.942029565]]],"type":"Polygon"}],"crs":{"properties":{"name":"EPSG:27700"},"type":"name"},"type":"geometrycollection"},"id":"Harrow-PL_0435_26","appeal_status":null,"appeal_start_date":null,"description":"Two storey rear extension to units 6-8; First floor roof extension to units 1-8; External Alterations (subdivision of land for rear gardens for Units 6-8) (part retrospective)","development_type":"Minor dwellings","decision_conditions":["&lt;p&gt;The application fails to provide any information to demonstrate how the proposed development would achieve the statutory minimum 10% Biodiversity Net Gain (BNG), as required by the Environment Act 2021. In the absence of this information and that no legal agreement to secure off-site BNG measures would be in place, the Local Planning Authority cannot be satisfied that the development would not result in a net loss of biodiversity or that it would deliver the required net gain. The proposal is therefore contrary to Policies G6 of the London Plan (2021) and GI3 of the Harrow Local Plan (2021-2041).&lt;/p&gt;","&lt;p&gt;&lt;span style=&quot;color: rgb(37, 43, 54); font-family: Montserrat, sans-serif; font-size: 15px;&quot;&gt;The proposal, b&lt;/span&gt;y reason of the increase in height, bulk and massing, encroaching toward the garden area along the site boundary adjacent with Nos. 1A and 1B Blawith Road,&amp;nbsp; would result in an adverse overbearing impact and an increased sense of enclosure for the rear garden at Nos. 1A and 1B Blawith Road contrary to policies D3.D(7) of the London Plan and GR1C of the Harrow Local Plan (2021-2041).&lt;/p&gt;"],"last_synced":"2026-04-29T02:03:07.981Z","secondary_street_name":null,"title_number":null,"last_date_consultation_comments":"19/03/2026","decision_process":"Delegated","centroid_northing":null,"borough":"Harrow","decision":"Refused","application_type":"All Other","wgs84_polygon":{"coordinates":[[[-0.333077,51.588665],[-0.33319,51.588663],[-0.3332,51.588778],[-0.33297,51.588826],[-0.33286,51.588401],[-0.333023,51.588386],[-0.333034,51.588429],[-0.333077,51.588665]]],"type":"Polygon"},"decision_agency":"Borough","decision_target_date":"21/04/2026","status":"Refused","decision_date":"21/04/2026"}