{"decision_target_date":"18/05/2026","last_updated_by":"Planning Portal ingest","appeal_decision_date":null,"appeal_status":null,"development_type":"Minor dwellings","postcode":"HA7 2PX","title_number":null,"application_details":{},"decision_date":"18/05/2026","url_planning_app":"https://planningsearch.harrow.gov.uk//planning/index.html?fa=getApplication&id=232810","borough":"Harrow","locality":"Stanmore","date_building_work_started_under_previous_permission":null,"bo_system":"Portal","parking_details":null,"site_name":"BREDON","epc_number":null,"pp_id":"14802918","subdivision_of_building":null,"status":"Approved","description":"Variation of Condition 2 (Approved Plans) of planning permission PL/0615/25 dated 24.07.2025 to allow minor material amendments comprising two side access doors, amendments to the front bay window base detail, and a domestic storage room on the east flank to accommodate ancillary services equipment.","decision_conditions":["&lt;p&gt;The side doors elevations of the development hereby approved shall be of purpose made obscure glass and shall thereafter be retained in that form.&lt;/p&gt;","&lt;p&gt;The development hereby permitted shall be constructed to the specifications of: &quot;Part M, M4 (2), Category 2: Accessible and Adaptable Dwellings&quot; of the Building Regulations 2013 and thereafter retained in that form.&lt;/p&gt;","&lt;p&gt;The windows on the side elevations of the development hereby approved shall: (a) be of purpose made obscure glass, (b) be permanently fixed closed below a height of 1.7m above finished floor level, and shall thereafter be retained in that form.&lt;/p&gt;","&lt;p&gt;This permission shall have the effect of varying condition numbered 2 on approved application reference PL/0615/25 dated 24/07/2025. The development hereby permitted shall be carried out in accordance with the following approved plans and documents: BS5837 Arboricultural Method Statement (AC.20523.573), BS5837 Arboricultural Report and Arboricultural Impact Assessment (AC.2024.573), Biodiversity Exemption statement (24035 FP1 05.01), Design &amp;amp; Access Statement (24035 FP1 01.00), Flood Risk Assessment (3153/RE/02-23-01 REVISION D), Fire Strategy Statement (24035 FP1 05.01), PLANNING STATEMENT, Preliminary Ecological Appraisal and Preliminary Roost Assessment Issue 2.1 dated 07/10/2024, RP.260306.0 - 2 OAK TREE CLOSE STANMORE - PLANT NOISE ASSESSMENT.DOCX, Surface water Drainage and SuDS Strategy Report (EX23/067/03 Rev.B), TREE CONSTRAINTS PLAN TREE PROTECTION PLAN (TPP-01 Rev A), 24035 FP1 01.01, 24035 FP1 01.02, 24035 FP1 01.03 REV G, 24035 FP1 01.04 REV H.&lt;/p&gt;","&lt;p&gt;The development hereby approved shall be carried out in accordance with the Construction Logistics Plan (Construction logistics Plan For Brendon, 2 Oak Tree Close, Stanmore, HA7 2PX 4035 COD 01.01 - C3_CMS 2OTC.docx and Project Programme) as approved under PL/2104/25 dated 21/11/2025 or any amendment or variation to it as may be agreed in writing by the Local Planning Authority.&lt;/p&gt;","&lt;p&gt;The development hereby approved shall be carried out shall be operated in accordance with the approved details in perpetuity with the Fire Strategy Statement (24035 COD 05.01) and the Fire Plan Strategy (24035 FP1 05.02) as approved under PL/2104/25 dated 21/11/2025.&amp;nbsp;&lt;/p&gt;","&lt;p&gt;The development hereby approved shall be carried out in accordance with the details of external materials (Material Schedule 23035 COD 01. 03; and Proposed Elevations and Section 24035 FP1 01.04 Rev E) as approved under PL/2104/25 dated 21/11/2025 and shall thereafter be retained.&lt;/p&gt;","&lt;p&gt;The development hereby approved shall be carried out in accordance with details of the levels of the building(s), road(s) and footpath(s) in relation to the adjoining land and highway(s) (Drawing No. 24035.COD 01.02 Rev A) as approved under PL/2104/25 dated 21/11/2025 or any amendment or variation to it as may be agreed in writing by the Local Planning Authority.&lt;/p&gt;","&lt;p&gt;The development hereby approved shall be carried out in accordance with the details of surface water disposal, attenuation, storage works and the disposal of sewage (Surface Water Drainage and SuDS Strategy Report (EX23/067/03 Rev.B) as approved under PL/2104/25 dated 21/11/2025 and shall thereafter be retained.&lt;/p&gt;","&lt;p&gt;Within 90 days of the grant of this planning permission, full details of biodiversity enhancements for the site have been submitted to, and agreed in writing by, the local planning authority. The enhancements shall include:&lt;/p&gt;&lt;p&gt;&lt;br&gt;&lt;/p&gt;&lt;p&gt;(a) the type and location of bat and bird boxes to be built into the structure&lt;/p&gt;&lt;p&gt;(b) full details of measures to be taken to provide shelter and foraging for invertebrate species at ground level, and in the external building walls.&lt;/p&gt;&lt;p&gt;&lt;br&gt;&lt;/p&gt;&lt;p&gt;The development shall be completed in accordance with the detailed as so agreed and thereafter retained.&lt;/p&gt;","&lt;p&gt;The development hereby permitted shall not be occupied until there has been submitted to, and approved by, the local planning authority, a scheme of hard and soft landscape works which shall include a survey of all existing trees and hedgerows on the land, indicating those to be retained and those to be lost. Details of those to be retained, together with measures for their protection in the course of the development, shall carried out in prior to any demolition or any other site works, and retained until the development is completed. Soft landscape works shall include: planting plans, and schedule of plants, noting species, plant sizes and proposed numbers/densities.&lt;/p&gt;","&lt;p&gt;The development hereby approved shall be carried out in accordance with the details of bicycle storage (Drawing No. 24035 COD 01.02 Rev A) as approved under PL/2104/25 dated 21/11/2025 and shall thereafter be retained.&lt;/p&gt;","&lt;p&gt;The development hereby approved shall be carried out in accordance with the details of bin storage and disposal of refuse/waste (Drawing No. 24035 COD 01.02 Rev A) as approved under PL/2104/25 dated 21/11/2025 and shall thereafter be retained. The refuse bins shall be stored at all times, other than on collection days, in the designated refuse storage area, as shown on the approved details.&lt;/p&gt;","&lt;p&gt;Evidence of certification of Secure by Design Accreditation for the development shall be submitted to the Local Planning Authority in writing for approval before any part of the development is occupied or used. The development shall only be completed and operated in accordance with any approval.&lt;/p&gt;","All planting, seeding or turfing comprised in the approved details of landscaping shall be carried out in the first planting and seeding seasons following the occupation of the building(s), or the completion of the development, whichever is the sooner.  Any existing or new trees or shrubs which, within a period of 5 years from the completion of the development, die, are removed, or become seriously damaged or diseased, shall be replaced in the next planting season, with others of a similar size and species, unless the local authority agrees any variation in writing.","&lt;p&gt;The erection of fencing for the protection of any retained tree shall be undertaken in accordance with the approved plans and particulars before any equipment, machinery or materials are brought on to the site for the purposes of the development, and shall be maintained until all equipment, machinery and surplus materials have been removed from the site. Nothing shall be stored or placed in any area fenced in accordance with this condition, and the ground levels within those areas shall not be altered, nor shall any excavation be made, without the written consent of the local planning authority.&lt;/p&gt;","&lt;p&gt;None of the existing trees on the site shall be lopped, topped, felled or uprooted without the prior written permission of the local planning authority. Any topping or lopping which is approved shall be carried out in accordance with British Standard 3998 (Tree Work).&lt;/p&gt;","&lt;p&gt;Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (or any order revoking and re-enacting that order with or without modification), no development which would otherwise fall within Classes A, B, D, E and F in Part 1 of Schedule 2 to that Order shall be carried out without the prior written permission of the local planning authority.&amp;nbsp;&lt;/p&gt;","&lt;p&gt;Notwithstanding the approved plans and prior to the first occupation of the development hereby approved, full details of the railings for the proposed steps at the side elevations shall be submitted to and approved in writing by the Local Planning Authority. The development shall be completed in accordance with the approved details and shall thereafter be retained.&lt;/p&gt;"],"site_number":"2","last_updated":"2026-07-15T01:13:34.890Z","last_date_consultation_comments":"17/04/2026","valid_date":"23/03/2026","actual_commencement_date":null,"centroid_northing":null,"appeal_decision":null,"decision_agency":"Borough","lpa_app_no":"PL/0792/26","date_building_work_completed_under_previous_permission":null,"decision":"Approved","id":"Harrow-PL_0792_26","polygon":{"type":"geometrycollection","geometries":[{"coordinates":[[[517038.85904773,191148.771376751],[517030.515719781,191196.212713618],[517015.303103331,191195.119912148],[517021.16588362,191142.431514569],[517038.85904773,191148.771376751]]],"type":"Polygon"}],"crs":{"type":"name","properties":{"name":"EPSG:27700"}}},"appeal_start_date":null,"decision_process":"Delegated","ward":"Belmont","street_name":"OAK TREE CLOSE","secondary_street_name":null,"last_synced":"2026-07-15T02:54:42.637Z","lpa_name":"Harrow","reference_no_of_permission_being_relied_on":null,"cil_liability":null,"wgs84_polygon":{"type":"Polygon","coordinates":[[[-0.311299,51.60702],[-0.311404,51.607448],[-0.311624,51.607442],[-0.311557,51.606967],[-0.311299,51.60702]]]},"uprn":"100021317343","application_type":"All Other","centroid":{"lat":49.766807,"lon":-7.55716},"lapsed_date":"18/05/2029","application_type_full":"Removal/Variation of a condition","centroid_easting":null,"actual_completion_date":null}