{"date_building_work_completed_under_previous_permission":null,"decision_process":"Delegated","site_number":null,"url_planning_app":"https://planningsearch.harrow.gov.uk//planning/index.html?fa=getApplication&id=232953","polygon":{"geometries":[{"coordinates":[[[510982.953817407,191315.774973663],[510981.30858854,191303.18929813],[510980.512684402,191291.292792404],[511066.208290336,191299.110430138],[511064.406616871,191319.955069761],[510982.953817407,191315.774973663]]],"type":"Polygon"}],"crs":{"type":"name","properties":{"name":"EPSG:27700"}},"type":"geometrycollection"},"description":"Variation or removal of\r\nConditions 2 (Approved Plans), 3 (Materials), 4 (Article 4 Direction), 5\r\n(Landscaping), 6 (Tree Protection Measures), 8 (Refuse Storage), 9 (Tree\r\nProtection Measures), 10 (Tree Protection Measures), 11 (Drainage Details) and\r\n12 (Biodiversity Enhancements) of planning permission PL/1388/25 dated 17\r\nOctober 2025 for ‘Demolition of existing house and garage; retention of front\r\nwall; development to provide a detached two storey dwelling with habitable roof\r\nspace (1 x 5 beds) with rear terrace; widening of existing access;\r\nlandscaping’, to remove duplication and revise the requirements and triggers of\r\nthe conditions","epc_number":null,"ward":"Pinner","last_updated":"2026-10-06T09:59:07.359Z","street_name":"PINNER HILL","decision_conditions":["&lt;p class=&quot;MsoListParagraph&quot; style=&quot;&quot;&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;&quot;&gt;The development hereby\r\napproved shall be carried out in strict accordance with the Arboricultural\r\nMethod Statement (9.4, Methods 1 – 12; John Cromar report) and tree protection\r\nplan (S1334-J1-P1 and P2) hereby approved&lt;font face=&quot;Arial, sans-serif&quot;&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/font&gt;&lt;/span&gt;&lt;/p&gt;","&lt;p class=&quot;MsoListParagraph&quot; style=&quot;&quot;&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;&quot;&gt;The\r\ndevelopment hereby permitted shall be begun no later than 17 October 2028.&lt;font face=&quot;Arial, sans-serif&quot;&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/font&gt;&lt;/span&gt;&lt;/p&gt;","&lt;p class=&quot;MsoListParagraph&quot; style=&quot;&quot;&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;&quot;&gt;The\r\ndevelopment hereby permitted shall be carried out in accordance with the\r\nfollowing approved plans and documents:&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoListParagraph&quot; style=&quot;&quot;&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;\r\n\r\n\r\n\r\n&lt;/p&gt;&lt;p class=&quot;MsoListParagraph&quot; style=&quot;&quot;&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;&quot;&gt;C368-202A\r\nSite Plan, C368-203A, C368-204A, C368-211A, C368-212A, C368-213A, C368-214A,\r\nC368-215A, C368-216A, C368-217A, C368-218A, C368-251A, C368-252A, C368-253A,\r\nC368-254A, C368-256A, C368-260A, C368-261A, C368-262A, C368-263A, Structural\r\nAssessment Report, Construction Management Plan (Rev 1), Preliminary Ecological\r\nAppraisal: Panorama House, Pinner Hill Rd, Pinner (7 October 2024), Design,\r\nAccess &amp;amp; Heritage Statement Rev A (Ten Point Five architecture, 2025), Form\r\n4 – Reasonable Exception Statement, (CIL) - Form 1, Photos, Ohme Home Pro data\r\nsheet [7.4kW] - UK &amp;amp; IE, REPORT regarding the impact on trees of proposals\r\nfor development (JOHN CROMAR’S ARBORICULTURAL COMPANY LTD).&lt;font face=&quot;Arial, sans-serif&quot;&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/font&gt;&lt;/span&gt;&lt;/p&gt;","&lt;p class=&quot;MsoListParagraph&quot; style=&quot;&quot;&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;&quot;&gt;The\r\ndevelopment permitted shall not progress above ground floor damp-proof course\r\nlevel until full details and samples of the materials to be used in the\r\nconstruction and finishing of the external surfaces of the development have\r\nbeen submitted to and approved in writing by the Local Planning Authority,\r\nincluding:&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoListParagraph&quot; style=&quot;&quot;&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoListParagraph&quot; style=&quot;&quot;&gt;&lt;!--[if !supportLists]--&gt;(a)&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; font-size-adjust: none; font-language-override: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-stretch: normal; line-height: normal;&quot;&gt;&amp;nbsp; &lt;/span&gt;&lt;!--[endif]--&gt;external walls, including facing materials, finishes, bonding and mortar;&lt;o:p&gt;&lt;/o:p&gt;&lt;/p&gt;&lt;p class=&quot;MsoListParagraph&quot; style=&quot;&quot;&gt;(b) roof coverings, ridge tiles, verges, eaves and associated roof\r\ndetailing;&lt;o:p&gt;&lt;/o:p&gt;&lt;/p&gt;&lt;p class=&quot;MsoListParagraph&quot; style=&quot;&quot;&gt;(c) windows and external doors, including materials, finishes, frames,\r\nreveals, cills and lintels;&lt;o:p&gt;&lt;/o:p&gt;&lt;/p&gt;&lt;p class=&quot;MsoListParagraph&quot; style=&quot;&quot;&gt;(d) soffits, fascias, rainwater goods and other external architectural\r\ndetailing;&lt;o:p&gt;&lt;/o:p&gt;&lt;/p&gt;&lt;p class=&quot;MsoListParagraph&quot; style=&quot;&quot;&gt;(e) external ground surfacing, including paths, terraces, driveways and\r\nparking areas; and&lt;o:p&gt;&lt;/o:p&gt;&lt;/p&gt;&lt;p class=&quot;MsoListParagraph&quot; style=&quot;&quot;&gt;(f) boundary treatments, including walls, fences, gates and other means\r\nof enclosure.&lt;o:p&gt;&lt;/o:p&gt;&lt;/p&gt;&lt;p class=&quot;MsoListParagraph&quot; style=&quot;&quot;&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n&lt;/p&gt;&lt;p class=&quot;MsoListParagraph&quot; style=&quot;&quot;&gt;The development shall thereafter be carried out and completed in\r\naccordance with the approved details.&lt;font face=&quot;Arial, sans-serif&quot;&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/font&gt;&lt;/p&gt;","&lt;p class=&quot;MsoListParagraph&quot; style=&quot;&quot;&gt;Prior to the development progressing above damp-proof course level, a\r\ndetailed scheme of hard and soft landscaping for the entire site shall be\r\nsubmitted to and approved in writing by the Local Planning Authority. The\r\nscheme shall include:&lt;o:p&gt;&lt;/o:p&gt;&lt;/p&gt;&lt;p class=&quot;MsoListParagraph&quot; style=&quot;&quot;&gt;&amp;nbsp;&lt;/p&gt;&lt;p class=&quot;MsoListParagraph&quot; style=&quot;&quot;&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;&quot;&gt;(a)\r\nplanting plans and schedules specifying species, sizes, numbers and planting\r\ndensities;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoListParagraph&quot; style=&quot;&quot;&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;&quot;&gt;(b)\r\ndetails of all proposed tree planting, including species, size and location;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoListParagraph&quot; style=&quot;&quot;&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;&quot;&gt;(c)\r\nthe layout of hard landscaped areas, including paths, terraces and other\r\nlandscaped areas;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoListParagraph&quot; style=&quot;&quot;&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;&quot;&gt;(d)\r\ndetails of proposed boundary and interface treatments insofar as relevant to\r\nthe landscaping scheme; and&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoListParagraph&quot; style=&quot;&quot;&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;&quot;&gt;(e)\r\nan implementation programme for all hard and soft landscaping works.&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoListParagraph&quot; style=&quot;&quot;&gt;&amp;nbsp;&lt;/p&gt;&lt;p class=&quot;MsoListParagraph&quot; style=&quot;&quot;&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;&quot;&gt;The\r\nlandscaping scheme shall incorporate and be consistent with all existing trees\r\nand vegetation approved for retention under the approved plans and\r\narboricultural documents secured by Conditions 2 and 7.&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoListParagraph&quot; style=&quot;&quot;&gt;&amp;nbsp;&lt;/p&gt;&lt;p class=&quot;MsoListParagraph&quot; style=&quot;&quot;&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;&quot;&gt;The\r\napproved landscaping scheme shall be implemented in full prior to first\r\noccupation of the development or, in respect of soft landscaping, within the\r\nfirst available planting season following first occupation, in accordance with\r\nthe approved implementation programme.&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoListParagraph&quot; style=&quot;&quot;&gt;&amp;nbsp;&lt;/p&gt;&lt;p&gt;\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n&lt;/p&gt;&lt;p class=&quot;MsoListParagraph&quot; style=&quot;&quot;&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;&quot;&gt;Any\r\ntree, hedge or other planting approved for retention under Conditions 2 and 7\r\nor provided as part of the landscaping scheme approved under this condition,\r\nwhich within five years of completion of the landscaping works dies, is\r\nremoved, or becomes seriously damaged or diseased shall be replaced in the next\r\navailable planting season with another of the same species and size, unless\r\notherwise agreed in writing by the Local Planning Authority.&lt;font face=&quot;Arial, sans-serif&quot;&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/font&gt;&lt;/span&gt;&lt;/p&gt;","&lt;p class=&quot;MsoListParagraph&quot; style=&quot;&quot;&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;&quot;&gt;Prior\r\nto the first occupation of the development, details of secure and sheltered\r\ncycle stores (including dimensions, elevations and external materials) shall be\r\nsubmitted to and approved in writing by the Local Planning Authority. The cycle\r\nstorage shall be made available prior to occupation of the development and\r\nshall be retained thereafter.&lt;font face=&quot;Arial, sans-serif&quot;&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/font&gt;&lt;/span&gt;&lt;/p&gt;","&lt;p class=&quot;MsoListParagraph&quot; style=&quot;&quot;&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;&quot;&gt;Prior\r\nto the first occupation of the development, details of the secure storage and\r\ncollection arrangements for refuse and recycling shall be submitted to and\r\napproved in writing by the Local Planning Authority. The approved refuse and\r\nrecycling storage facilities shall be provided in full prior to first\r\noccupation of the development and shall thereafter be retained and made\r\navailable for their intended purpose&lt;/span&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;font-family:&amp;quot;Arial&amp;quot;,sans-serif;mso-bidi-font-weight:bold&quot;&gt;.&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;","&lt;p class=&quot;MsoListParagraph&quot; style=&quot;&quot;&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;&quot;&gt;Prior to the development\r\nprogressing above damp-proof course level, details of the proposed surface\r\nwater and foul drainage arrangements shall be submitted to and approved in\r\nwriting by the Local Planning Authority. The details shall include:&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoListParagraph&quot; style=&quot;&quot;&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoListParagraph&quot; style=&quot;margin-left: 1px;&quot;&gt;&lt;!--[if !supportLists]--&gt;(a)&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; font-size-adjust: none; font-language-override: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-stretch: normal; line-height: normal;&quot;&gt;&amp;nbsp;&amp;nbsp;\r\n&lt;/span&gt;&lt;!--[endif]--&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;&quot;&gt;a\r\nplan showing the proposed surface water drainage layout, including the location\r\nof drainage connections, discharge points and any infiltration, attenuation or\r\nstorage features;&lt;/span&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/p&gt;&lt;p class=&quot;MsoListParagraph&quot; style=&quot;margin-left: 1px;&quot;&gt;&lt;!--[if !supportLists]--&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;&quot;&gt;(b)&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; font-size-adjust: none; font-language-override: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-stretch: normal; line-height: normal;&quot;&gt;&amp;nbsp;&amp;nbsp;\r\n&lt;/span&gt;&lt;/span&gt;&lt;!--[endif]--&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;&quot;&gt;details\r\nof permeable surfacing and its construction for areas of proposed hardstanding,\r\nwhere applicable; and&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoListParagraph&quot; style=&quot;margin-left: 1px;&quot;&gt;&lt;!--[if !supportLists]--&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;&quot;&gt;(c)&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; font-size-adjust: none; font-language-override: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-stretch: normal; line-height: normal;&quot;&gt;&amp;nbsp;&amp;nbsp;&amp;nbsp;\r\n&lt;/span&gt;&lt;/span&gt;&lt;!--[endif]--&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;&quot;&gt;details\r\nof the proposed foul drainage connection.&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n&lt;/p&gt;&lt;p class=&quot;MsoListParagraph&quot; style=&quot;&quot;&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;&quot;&gt;The development shall\r\nthereafter be carried out and completed in accordance with the approved details&lt;font face=&quot;Arial, sans-serif&quot;&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/font&gt;&lt;/span&gt;&lt;/p&gt;","&lt;p class=&quot;MsoListParagraph&quot; style=&quot;&quot;&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;&quot;&gt;The development permitted\r\nshall not progress above damp-proof course level until details of biodiversity\r\nenhancement features have been submitted to and approved in writing by the\r\nLocal Planning Authority. The details shall include:&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&amp;nbsp;&lt;/p&gt;&lt;p class=&quot;MsoListParagraph&quot; style=&quot;&quot;&gt;&lt;!--[if !supportLists]--&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;&quot;&gt;(a)&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; font-size-adjust: none; font-language-override: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-stretch: normal; line-height: normal;&quot;&gt;&amp;nbsp; &lt;/span&gt;&lt;/span&gt;&lt;!--[endif]--&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;&quot;&gt;the number, type,\r\nspecification and location of bird nesting and bat roosting features; and&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoListParagraph&quot; style=&quot;&quot;&gt;&lt;!--[if !supportLists]--&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;&quot;&gt;(b)&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; font-size-adjust: none; font-language-override: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-stretch: normal; line-height: normal;&quot;&gt;&amp;nbsp; &lt;/span&gt;&lt;/span&gt;&lt;!--[endif]--&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;&quot;&gt;the number, specification and\r\nlocation of integrated swift bricks within the external elevations of the\r\ndwelling.&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;&quot;&gt;&amp;nbsp;&lt;/p&gt;&lt;p&gt;\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n&lt;/p&gt;&lt;p class=&quot;MsoListParagraph&quot; style=&quot;&quot;&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;&quot;&gt;The approved biodiversity\r\nenhancement features shall be installed in full prior to first occupation of\r\nthe development and shall thereafter be retained.&lt;font face=&quot;Arial, sans-serif&quot;&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/font&gt;&lt;/span&gt;&lt;/p&gt;","&lt;p class=&quot;MsoListParagraph&quot; style=&quot;&quot;&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;&quot;&gt;Notwithstanding the\r\nprovisions of the Town and Country Planning (General Permitted Development)\r\n(England) Order 2015 (or any order revoking and re-enacting that order with or\r\nwithout modification), no development which would otherwise fall within Classes\r\nA, AA, B, D, E and F in Part 1 of Schedule 2 to that Order shall be carried out\r\nwithout the prior written permission of the local planning authority.&lt;font face=&quot;Arial, sans-serif&quot;&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/font&gt;&lt;/span&gt;&lt;/p&gt;"],"actual_completion_date":null,"bo_system":"Portal","borough":"Harrow","parking_details":null,"last_synced":"2026-10-07T01:59:30.919Z","lapsed_date":"30/09/2029","actual_commencement_date":null,"cil_liability":null,"centroid_easting":null,"wgs84_polygon":{"type":"Polygon","coordinates":[[[-0.398659,51.609746],[-0.398687,51.609633],[-0.398702,51.609527],[-0.397462,51.60958],[-0.397482,51.609768],[-0.398659,51.609746]]]},"decision_date":"30/09/2026","lpa_name":"Harrow","status":"Approved","appeal_decision":null,"appeal_status":null,"secondary_street_name":null,"application_type_full":null,"lpa_app_no":"PL/0855/26","centroid_northing":null,"date_building_work_started_under_previous_permission":null,"last_updated_by":"Portal","application_details":{},"locality":null,"centroid":{"lat":49.766807,"lon":-7.55716},"subdivision_of_building":null,"appeal_decision_date":null,"development_type":"Minor dwellings","reference_no_of_permission_being_relied_on":null,"application_type":"All Other","valid_date":"26/03/2026","pp_id":"14814086","decision_target_date":"21/05/2026","site_name":"PANORAMA HOUSE","decision":"Approved","appeal_start_date":null,"postcode":"HA5 3XT","last_date_consultation_comments":"05/05/2026","id":"Harrow-PL_0855_26","decision_agency":"Borough","uprn":"100021305356","title_number":null}