{"actual_completion_date":null,"appeal_start_date":null,"application_type_full":"Full planning permission","decision_conditions":["The development hereby permitted shall be carried out in accordance with the following approved plans and documents: 32BA/01 Rev A, 32BA/02 REV B, 32BA/03 Rev A, 32BA/04 Rev A, Design and\nAccess Statement and Location Plan.","Hard and Soft Landscaping The development hereby permitted shall not be occupied until there has been\nsubmitted to, and approved by, the local planning authority, a scheme of hard and\nsoft landscape works for the site. Soft landscape works shall include:Planting plans (at a scale not less than 1:100)  Schedules of plants, noting species, plant sizes, plant container sizes (all at time\nof planting) and proposed numbers / densities Written specification of planting and cultivation works to be undertaken A landscape implementation programme with proposed timing / dates for the\nworks.  Boundary Treatment  Secure and screened bin storage.  Hard landscaping materials "," Permeable Paving Notwithstanding the approved details, prior to the construction of any works\nabove Damp-Proof Course level of the development hereby approved, full details\nof the permeable paving and details relating to the long-term maintenance and\nmanagement of the on-site drainage shall be submitted to and approved in writing\nby the Local Planning Authority. The details thereby approved shall be\nimplemented and retained thereafter.","Refuse\ncompliance\n\nThe refuse and waste bins\nshall be stored at all times, other than on collection days, within the\ndesignated refuse storage areas as shown on the approved plans.","Landscaping\nComplianceAll planting, seeding or turfing comprised in the approved details of landscaping\nshall be carried out in the first planting and seeding seasons following the occupation of the building(s), or the completion of the development, whichever is\nthe sooner. Any existing or new trees or shrubs which, within a period of 5 years\nfrom the completion of the development, die, are removed, or become seriously\ndamaged or diseased, shall be replaced in the next planting season, with others\nof a similar size and species, unless the local authority agrees any variation in\nwriting. ","The development hereby permitted shall be begun before the expiration of three years from the date of this permission.","The materials to be used in the construction of the external surfaces of the extension hereby permitted shall match those used in the existing building.","The roof area of the extension hereby permitted shall not be used as a balcony, roof garden or similar amenity area without the grant of further specific permission from the local planning authority.","Cycle\nParkingThe development hereby permitted shall not be occupied until details relating to\nthe provision of a minimum of 4 no. secure and sheltered cycle storage spaces in\ntwo separate cycle storage containers has been submitted to and approved in\nwriting by the Local Planning Authority. The development shall be completed in\naccordance with the approved details prior to the occupation of the development\nand shall thereafter be retained.","Fire Safety\nThe development hereby\napproved shall not be occupied until a Fire Safety Statement has been submitted\nto and approved in writing by the Local Planning Authority, this statement\nshall include details of how the development will function in terms of the following:1) identify suitably\npositioned unobstructed outside space: a) for fire appliances to be positioned\non b) appropriate for use as an evacuation assembly point2) is designed to\nincorporate appropriate features which reduce the risk to life and the risk of\nserious injury in the event of a fire; including appropriate fire alarm systems\nand passive and active fire safety measures3) is constructed in an\nappropriate way to minimise the risk of fire spread4) provide suitable and\nconvenient means of escape, and associated evacuation strategy for all building\nusers5) develop a robust\nmanagement strategy for evacuation which is to be periodically updated and\npublished (details of how often this management strategy is to be reviewed and\npublished to be included), and which all building users can have confidence in6) provide suitable access\nand equipment for firefighting which is appropriate for the size and use of the\ndevelopment.\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\nThe development shall be\noperated in accordance with the approved details in perpetuity.","The development hereby permitted shall not be occupied until Boundary\nTreatment details between the allocated rear amenity space provision have been\nsubmitted to, and approved in writing by, the local planning authority. The\napproved boundary treatment details shall be implemented on site before\noccupation of the development and shall thereafter be retained."],"decision":"Approved","appeal_decision":null,"valid_date":"22/04/2026","description":"Conversion of dwelling into two flats (1 X 3 bed and 1 X 1 bed); front porch; conversion of garage to bin store and rear amenity/first floor flat access; single and two storey side to rear extensions; separate amenity space; landscaping; cycle storage; external alterations","status":"Approved","last_updated_by":"Portal","site_number":"32","cil_liability":false,"decision_process":"Delegated","development_type":"Minor dwellings","subdivision_of_building":null,"centroid_northing":190368.0,"last_updated":"2026-09-22T16:05:13.963Z","lapsed_date":"06/08/2029","bo_system":"Portal","centroid":{"lat":51.599826,"lon":-0.299305},"parking_details":null,"url_planning_app":"https://planningsearch.harrow.gov.uk//planning/index.html?fa=getApplication&id=233221","pp_id":"14875456","locality":"Stanmore","reference_no_of_permission_being_relied_on":null,"uprn":"100021311056","ward":"Centenary","last_synced":"2026-09-23T02:05:42.748Z","application_details":{"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"Entire Development","intended_completion_date":"02/2027","intended_commencement_date":"08/2026"}],"total_gia_gained":152.04,"site_area":0.025,"total_gia_lost":0.0,"total_gia_existing":88.65,"existing_proposed_floorspace_details":[{"gia_existing":88.65,"gia_gained":130.57,"use_class":"C3","gia_lost":null}],"projected_cost_of_works":"Up to £2m","occupation_status":"Occupied","scheme_phasing":false,"rain_water_harvesting":false,"grey_water_reuse":false,"green_suds":false,"surface_water_discharge_percentage_reduction":10.0,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":152.04,"total_gia_lost":0.0,"total_gia_existing":88.65,"site_area":0.025},"garden_land_lost":false,"residential_details":{"total_no_proposed_residential_units_shared_equity":0,"total_no_proposed_bedrooms":4.0,"total_no_proposed_residential_units":2,"total_no_proposed_residential_units_london_living_rent":0,"total_no_proposed_residential_affordable_units":0,"total_no_existing_residential_units":1,"total_no_proposed_residential_units_affordable_rent":0,"total_no_proposed_residential_units_discount_market_sale":0,"total_no_proposed_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_existing_residential_units_london_living_rent":0,"total_no_existing_residential_units_shared_equity":0,"total_no_existing_residential_units_market_for_sale":1,"total_no_existing_residential_units_intermediate":0,"total_no_proposed_residential_units_market_for_rent":0,"total_no_existing_residential_units_social_rent":0,"total_no_proposed_residential_units_self_build_and_custom_build":0,"total_no_existing_residential_units_discount_market_rent":0,"total_no_proposed_residential_units_market_for_sale":2,"total_no_existing_residential_affordable_units":0,"total_no_existing_residential_units_affordable_rent":0,"habitable_rooms_density":280.0,"total_no_existing_residential_units_london_shared_ownership":0,"total_gia_gained":130.58,"total_no_proposed_residential_units_social_rent":0,"total_no_existing_residential_units_london_affordable_rent":0,"dwelling_density":80.0,"total_no_proposed_residential_units_london_affordable_rent":0,"total_no_existing_residential_units_discount_market_sale":0,"total_gia_lost":88.65,"total_no_proposed_residential_units_starter_homes":0,"total_no_existing_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_existing_residential_units_starter_homes":0,"total_no_proposed_residential_units_discount_market_rent":0,"total_no_proposed_residential_units_intermediate":0,"affordable_percentage":0.0,"total_no_proposed_residential_units_london_shared_ownership":0,"residential_units":[{"no_habitable_rooms":4.0,"phase_detail":null,"unit_no":null,"description":null,"change_type":"Loss","sheltered_accommodation":false,"no_bedrooms":3.0,"unit_type":"Semi Detached Home","provision_for_older_persons":false,"gia":88.65,"tenure":"Market for sale"},{"no_habitable_rooms":4.0,"provider":"Private","phase_detail":null,"unit_no":null,"description":null,"change_type":"Gain","no_bedrooms":3.0,"unit_type":"Flat Apartment Maisonette","provision_for_older_persons":false,"gia":74.1,"tenure":"Market for sale"},{"no_habitable_rooms":3.0,"provider":"Private","phase_detail":null,"unit_no":null,"description":null,"change_type":"Gain","no_bedrooms":1.0,"unit_type":"Flat Apartment Maisonette","provision_for_older_persons":false,"gia":56.48,"tenure":"Market for sale"}],"total_no_existing_residential_units_market_for_rent":0,"total_no_existing_residential_units_self_build_and_custom_build":0,"site_area":0.025},"infrastructure_details":{"total_annual_pm_emissions":0.0,"no_resi_units_to_have_full_fibre":1.0,"green_roof_area":0.0,"urban_greening_factor_score":0.0,"solar_pv_capacity":0.7000000000000001,"no_homes_passive_cooling":0.0,"no_new_water_connections_required":1.0,"no_non_resi_units_to_have_full_fibre":0.0,"total_annual_nox_emissions":0.0,"waste_provision":false,"percentage_demolition_construction_material_recycling":25.0,"no_homes_to_have_electrical_heating":0.0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":1.0,"ghg_reduction_over_building_regulations":false},"internal_resi_water_usage":105.0,"ownership_status":"Private","s106_agreement":false,"viability_assessment":false,"air_quality_assessment":false,"mayoral_cil_liability_notice_issued":false,"existing_uprns":[],"circular_economy_statement":false,"commencement_notice_received":false,"other_residential_accommodation_details":{"site_area":0.025},"3d_model":false,"borough_cil_liability_notice_issued":false,"transport_impact_assessment":false},"street_name":"BROADCROFT AVENUE","decision_agency":"Borough","appeal_decision_date":null,"site_name":null,"last_date_consultation_comments":"08/06/2026","secondary_street_name":null,"lpa_name":"Harrow","title_number":[],"epc_number":null,"decision_date":"06/08/2026","wgs84_polygon":{"coordinates":[[[-0.299276,51.599953],[-0.299419,51.599936],[-0.299367,51.599827],[-0.299313,51.599696],[-0.299195,51.599714],[-0.299276,51.599953]]],"type":"Polygon"},"date_building_work_started_under_previous_permission":null,"decision_target_date":"17/06/2026","postcode":"HA7 1PB","appeal_status":null,"polygon":{"crs":{"properties":{"name":"EPSG:27700"},"type":"name"},"geometries":[{"coordinates":[[[517889.669978286,190382.171182928],[517879.851977415,190380.012845366],[517883.710151546,190368.040550633],[517887.822315801,190353.468725592],[517895.897605521,190355.683036367],[517889.669978286,190382.171182928]]],"type":"Polygon"}],"type":"geometrycollection"},"centroid_easting":517888.0,"date_building_work_completed_under_previous_permission":null,"borough":"Harrow","id":"Harrow-PL_1099_26","application_type":"All Other","lpa_app_no":"PL/1099/26","actual_commencement_date":null}