{"actual_completion_date":null,"appeal_start_date":null,"application_type_full":"Householder planning permission","decision_conditions":["The development hereby permitted shall be begun before the expiration of three years from the date of this permission.","No site works or development shall commence until details of the levels of the building, road and footpath in relation to the adjoining land and highways, and any other changes proposed in the levels of the site, have been submitted to, and approved by, the local planning authority.","The materials to be used in the construction of the external surfaces of the extension hereby permitted shall match those used in the existing building.","&lt;p&gt;The development hereby permitted shall be carried out in accordance with the following approved plans and documents:&amp;nbsp;&lt;/p&gt;&lt;p&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;PN-001; PN-002; PN-003; PN-004; PN-005; PN-006; PN-007 (Basement Floor Plan – Proposed); PN-007 (Sections meant to be PN-010), PN-008; PN-009; PN-011,&amp;nbsp; Design and Access Statement (July 2025); Construction Method Statement (May 2026), Heritage Statement; Fire statement form, Flood Risk Assessment (Aug 25), CIL FORM 1&amp;nbsp;&lt;/span&gt;&lt;/p&gt;","&lt;p&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;The development hereby permitted shall not commence until there have been submitted to, and approved in writing by, the local planning authority, a tree protection plan and method statement (in accordance with BS5837:2012) outlining protection measures for the existing retained TPO woodland group tree(s) on the site. The tree protection measures shall be in place prior to any works commencing on site (including works of demolition) and shall be kept in place during the construction of the development. No materials or waste shall be stored within any protected areas.&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;br&gt;&lt;/p&gt;&lt;div&gt;&lt;br&gt;&lt;/div&gt;","&lt;p&gt;No development shall take place, including any works of demolition, until a Construction Method Statement has been submitted to, and approved in writing by the local planning authority. The Statement shall provide for:&lt;/p&gt;&lt;p&gt;- the parking of vehicles of site operatives and visitors; &lt;/p&gt;&lt;p&gt;- loading and unloading of plant and materials; &lt;/p&gt;&lt;p&gt;- storage of plant and materials used in constructing the development; &lt;/p&gt;&lt;p&gt;- the erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate; &lt;/p&gt;&lt;p&gt;- wheel washing facilities; &lt;/p&gt;&lt;p&gt;- measures to control the emission of dust and dirt during construction;&amp;nbsp;&lt;/p&gt;&lt;p&gt; - a scheme for recycling/disposing of waste resulting from demolition and construction works; &lt;/p&gt;&lt;p&gt;- delivery, demolition and construction working hours. &lt;/p&gt;&lt;p&gt;The approved Construction Method Statement shall be adhered to throughout the construction period for the development&lt;/p&gt;","&lt;p&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;The development hereby permitted shall not proceed above damp proof course until there has been submitted to, and approved by, the local planning authority, a scheme of hard and soft landscape works for of the site. Hard landscape details shall include material details for the site. Soft landscape works shall include: planting plans, and, soft landscape on the terrace, rear elevation and retaining walls and planting plans (at a scale not less than 1:100), written specification of planting and cultivation works to be undertaken and schedules of plants, noting species, plant sizes, plant container sizes (all at time of planting) and proposed numbers / densities and a landscape implementation programme.&amp;nbsp;&lt;/span&gt;&lt;/p&gt;","All planting, seeding or turfing comprised in the approved details of landscaping shall be carried out in the first planting and seeding seasons following the occupation of the building(s), or the completion of the development, whichever is the sooner.  Any existing or new trees or shrubs which, within a period of 5 years from the completion of the development, die, are removed, or become seriously damaged or diseased, shall be replaced in the next planting season, with others of a similar size and species, unless the local authority agrees any variation in writing.","Prior to the commencement of the development hereby approved, a Fire Safety Statement shall be submitted to and approved in writing by the Local Planning Authority, this statement shall include details of how the development will function in terms of the following:\r\n1) identify suitably positioned unobstructed outside space: a) for fire appliances to be positioned on b) appropriate for use as an evacuation assembly point \r\n2) is designed to incorporate appropriate features which reduce the risk to life and the risk of serious injury in the event of a fire; including appropriate fire alarm systems and passive and active fire safety measures \r\n3) is constructed in an appropriate way to minimise the risk of fire spread \r\n4) provide suitable and convenient means of escape, and associated evacuation strategy for all building users \r\n5) develop a robust management strategy for evacuation which is to be periodically updated and published (details of how often this management strategy is to be reviewed and published to be included), and which all building users can have confidence in\r\n6) provide suitable access and equipment for firefighting which is appropriate for the size and use of the development.\r\nThe development shall be operated in accordance with the approved details in perpetuity.","&lt;p&gt;No site works or development shall commence until drainage details below has been submitted to, and approved by the local planning authority. The Drainage information should include: &lt;/p&gt;&lt;p&gt;- Full details of drainage layout including details of the outlet and cross section of proposed storage.&amp;nbsp;&lt;/p&gt;&lt;p&gt;- Full details of any flow restrictions (hydrobrake, pumping station) is to be submitted together with the relevant graphs. &lt;/p&gt;&lt;p&gt;- Full details of SuDS including permeable paving, with construction details and Maintenance Plan. &lt;/p&gt;&lt;p&gt;-&amp;nbsp; A Management Plan for disposal of ground water during construction phase.&lt;/p&gt;&lt;div&gt;&lt;br&gt;&lt;/div&gt;&lt;p&gt;&lt;br&gt;&lt;/p&gt;"],"decision":"Approved","appeal_decision":null,"valid_date":"26/05/2026","description":"Basement and ground floor rear extensions, External alterations","status":"Approved","last_updated_by":"Portal","site_number":null,"cil_liability":true,"decision_process":"Delegated","development_type":"Other house holder developments","subdivision_of_building":null,"centroid_northing":191625,"last_updated":"2026-08-07T12:53:48.405Z","lapsed_date":"21/07/2026","bo_system":"Portal","centroid":{"lat":51.612581,"lon":-0.402646},"parking_details":null,"url_planning_app":"https://planningsearch.harrow.gov.uk//planning/index.html?fa=getApplication&id=233308","pp_id":"14932224","locality":"Pinner","reference_no_of_permission_being_relied_on":null,"uprn":"100021306622","ward":"Pinner","last_synced":"2026-08-08T02:52:34.072Z","application_details":{"total_gia_gained":229,"no_additional_bathrooms":2,"no_additional_bedrooms":0,"intended_completion_date":"03/2026","intended_commencement_date":"08/2025"},"street_name":"SOUTH VIEW ROAD","decision_agency":"Borough","appeal_decision_date":null,"site_name":"LINDEN HOUSE","last_date_consultation_comments":"18/06/2026","secondary_street_name":null,"lpa_name":"Harrow","title_number":["Unregistered"],"epc_number":null,"decision_date":"21/07/2026","wgs84_polygon":{"coordinates":[[[-0.40314,51.612996],[-0.403041,51.612313],[-0.402824,51.612311],[-0.402583,51.612045],[-0.402296,51.61206],[-0.402247,51.612976],[-0.40314,51.612996]]],"type":"Polygon"},"date_building_work_started_under_previous_permission":null,"decision_target_date":"21/07/2026","postcode":"HA5 3YD","appeal_status":null,"polygon":{"crs":{"properties":{"name":"EPSG:27700"},"type":"name"},"geometries":[{"coordinates":[[[510664.741933035,191670.400674213],[510673.272403154,191594.607417673],[510688.319002799,191594.750873488],[510705.680663704,191565.479382877],[510725.51536482,191567.580778476],[510726.631194193,191669.529412341],[510664.741933035,191670.400674213]]],"type":"Polygon"}],"type":"geometrycollection"},"centroid_easting":510700,"date_building_work_completed_under_previous_permission":null,"borough":"Harrow","id":"Harrow-PL_1319_26","application_type":"Householder","lpa_app_no":"PL/1319/26","actual_commencement_date":null}