{"uprn":"100021286066","ward":"Kenton East","epc_number":null,"description":"Conversion of dwelling into two flats (1 X 3 bed and 1 X 1 bed); single storey side to rear extension; alterations to roof to form end gable and rear dormer; external alterations; separate amenity space; bin and cycle stores; parking; vehicle crossover","centroid_easting":518254.0,"decision_date":"24/09/2026","street_name":"SHREWSBURY AVENUE","locality":null,"status":"Approved","date_building_work_started_under_previous_permission":null,"application_type_full":"Full planning permission","last_synced":"2026-10-21T16:21:34.662Z","lpa_name":"Harrow","decision_target_date":"17/08/2026","lpa_app_no":"PL/1612/26","title_number":[],"decision":"Approved","last_updated":"2026-10-12T15:33:56.217Z","appeal_start_date":null,"actual_commencement_date":null,"bo_system":"Portal","secondary_street_name":null,"decision_agency":"Borough","last_date_consultation_comments":"15/07/2026","appeal_decision_date":null,"actual_completion_date":null,"centroid_northing":189376.0,"wgs84_polygon":{"type":"Polygon","coordinates":[[[-0.294595,51.590862],[-0.294546,51.590743],[-0.29406,51.590852],[-0.29409,51.590886],[-0.294122,51.590899],[-0.294595,51.590862]]]},"date_building_work_completed_under_previous_permission":null,"lapsed_date":"24/09/2029","decision_conditions":["The development hereby permitted shall be carried out in accordance with the following approved plans and documents: Plan Nos: SI 2508 125SA 11 REV A, SI 2508 125SA 12 REV A, SI\n2508 125SA 13 REV A, SI 2508 125SA 14 REV A, SI 2508 125SA 15 REV A, SI 2508 125SA\n16 REV A, SI 2508 125SA 17 REV A, SI 2508 125SA 00 REV A, SI 2508 125SA 19, SI\n2508 125SA 18, Design & Access Statement, Fire Statement","Refuse compliance The refuse and waste bins shall be stored at all times, other than on collection days, within the designated refuse storage areas as shown on the approved plans.","The development hereby permitted shall be begun before the expiration of three years from the date of this permission.","The materials to be used in the construction of the external surfaces of the extension hereby permitted shall match those used in the existing building.","The roof area of the extension hereby permitted shall not be used as a balcony, roof garden or similar amenity area without the grant of further specific permission from the local planning authority.","Fire Safety The development hereby approved shall not be occupied until a Fire Safety Statement has been submitted to and approved in writing by the Local Planning Authority, this statement shall include details of how the development will function in terms of the following:1) identify suitably positioned unobstructed outside space: a) for fire appliances to be positioned on b) appropriate for use as an evacuation assembly point2) is designed to incorporate appropriate features which reduce the risk to life and the risk of serious injury in the event of a fire; including appropriate fire alarm systems and passive and active fire safety measures3) is constructed in an appropriate way to minimise the risk of fire spread4) provide suitable and convenient means of escape, and associated evacuation strategy for all building users5) develop a robust management strategy for evacuation which is to be periodically updated and published (details of how often this management strategy is to be reviewed and published to be included), and which all building users can have confidence in6) provide suitable access and equipment for firefighting which is appropriate for the size and use of the development. The development shall be operated in accordance with the approved details in perpetuity.","Notwithstanding the approved plans and prior to the first\noccupation of the development hereby permitted full details of bin stores and\nenclosures should be submitted to and approved writing by the Local Planning\nAuthority. The refuse bins shall be stored at all times, other than on\ncollection days, in the designated refuse storages as approved and retained\nthereafter.","Prior\nto the first occupation of the development, evidence of Secured by Design\nCertification shall be submitted to the local planning authority to be agreed\nin writing, or justification shall be submitted where the accreditation\nrequirements cannot be met. Secure by design measures shall be implemented and\nthe development shall be retained in accordance with the approved details. ","The cycle storage shall be made available in accordance with\nthe details as shown on the approved plans prior to the first occupation of the\ndevelopment hereby approved and shall be retained thereafter.","The windows and doors in the flank elevations of the\nproposed development shall: (a) be of purpose-made obscure glass, (b) be\npermanently fixed closed below a height of 1.7m above finished floor level, and\nshall thereafter be retained in that form.","No development shall commence until a Self-Build BNG Exemption\nStatement has been submitted to and approved in writing by the Local Planning\nAuthority. The Statement shall demonstrate that the development qualifies for\nthe self-build and custom housebuilding exemption from the biodiversity gain\nplanning condition and shall include: (a) details of how the dwelling is to be commissioned by an\nindividual or individuals who will occupy that dwelling as their home;(b) evidence that the individual(s) referred to in (a) has\nhad primary input into the design and layout of their dwelling;(d)  details of the intended occupier (where known),\nand the mechanism by which they will commission the build;(e) a statement confirming that the development will consist\nexclusively of self-build or custom housebuilding within the meaning of section\n1(A1) of the Self-build and Custom Housebuilding Act 2015.  The statement\nshall include a statutory declaration setting out how the development complies\nwith the self-build requirements or the applicant's contract with a builder.(f) such other information as is reasonably required by the\nLocal Planning Authority to verify that the development meets the criteria for\nexemption from the statutory biodiversity gain condition.\n\n\n\n\n\n\n\n\n\n\n\n\n\nThe development shall be carried out only in accordance with\nthe approved Self-Build BNG Exemption Statement.","Notwithstanding the approved details, the development hereby\npermitted shall not commence until there has been a scheme of hard and soft\nlandscape works for the site submitted to, and approved by the Local Planning\nAuthority. Soft landscape works shall include: •            Landscaping\nto be Approved – conversion - including landscape masterplan, hard and soft\nlandscape details, including a small tree in each back garden.Soft landscape works to include: Planting plans (at a scale not less than 1:100)Schedules of plants, noting species, plant sizes, plant\ncontainer sizes (all at time of planting) and proposed numbers / densities Written specification of planting and cultivation works to\nbe undertaken A landscape implementation programme with proposed timing /\ndates for the works.•            Hard\nmaterials                                 \n•            Boundary\nTreatment •            Secure and\nscreened bin and bike storage •            Landscaping\nScheme – Implementation and implementation programme, including a period of 5\nyear period for replacements of soft landscape\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\nThe development will be undertaken in accordance with the\napproved details and thereafter retained.","All planting, seeding or turfing included in the approved\ndetails of landscaping shall be carried out in the first planting season and\nfirst seeding season following the occupation of the building. Any trees or\nplants which within a period of 5 years from the occupation of the building\ndie, are removed or become seriously damaged or diseased shall be replaced in\nthe next planting season with others of similar size and species."],"id":"Harrow-PL_1612_26","application_type":"All Other","pp_id":"15005334","parking_details":{"net_car":2.0,"no_proposed_car":2.0,"no_existing_car":0.0},"url_planning_app":"https://planningsearch.harrow.gov.uk//planning/index.html?fa=getApplication&id=233519","appeal_status":null,"valid_date":"22/06/2026","site_number":"125","application_details":{"non_residential_details":{"total_gia_gained":146.73,"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_gia_lost":81.9,"total_gia_existing":81.9,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"site_area":0.034215999999999996},"garden_land_lost":false,"ownership_status":"Private","infrastructure_details":{"total_annual_pm_emissions":0.0,"no_homes_to_have_electrical_heating":0.0,"no_homes_passive_cooling":0.0,"no_non_resi_units_to_have_full_fibre":0.0,"total_annual_nox_emissions":0.0,"ghg_reduction_over_building_regulations":false,"mobile_network_operators_consultation":false,"no_new_gas_connections_required":1.0,"percentage_demolition_construction_material_recycling":0.0,"waste_provision":false,"no_new_water_connections_required":1.0,"fire_suppression_system_proposed":false,"green_roof_area":0.0,"no_resi_units_to_have_full_fibre":2.0},"total_gia_lost":81.9,"scheme_phasing":false,"existing_proposed_floorspace_details":[{"gia_existing":81.9,"use_class":"C3","gia_gained":146.73,"gia_lost":81.9}],"residential_details":{"total_no_existing_residential_units_london_affordable_rent":0,"total_no_proposed_residential_units_affordable_rent":0,"total_no_existing_residential_units_discount_market_rent":0,"total_no_proposed_residential_units_shared_equity":0,"total_no_existing_residential_units_intermediate":0,"residential_units":[{"provider":"Private","no_habitable_rooms":4.0,"phase_detail":null,"unit_no":null,"description":null,"change_type":"Gain","no_bedrooms":3.0,"unit_type":"Flat Apartment Maisonette","provision_for_older_persons":false,"gia":80.26,"unit_development_type":"Conversion","tenure":"Market for rent"},{"provider":"Private","no_habitable_rooms":3.0,"phase_detail":null,"unit_no":null,"description":null,"change_type":"Gain","no_bedrooms":1.0,"unit_type":"Flat Apartment Maisonette","provision_for_older_persons":false,"gia":66.47,"unit_development_type":"Conversion","tenure":"Market for rent"},{"provider":"Private","no_habitable_rooms":3.0,"phase_detail":null,"unit_no":null,"description":null,"change_type":"Loss","no_bedrooms":1.0,"unit_type":"House or Bungalow","provision_for_older_persons":false,"gia":81.9,"unit_development_type":"Conversion","tenure":"Market for rent"}],"total_no_existing_residential_units_self_build_and_custom_build":0,"total_no_existing_residential_units_market_for_rent":1,"total_no_existing_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_proposed_residential_units_intermediate":0,"total_no_proposed_residential_units_london_living_rent":0,"total_no_existing_residential_units_starter_homes":0,"total_no_existing_residential_units_market_for_sale":0,"total_no_proposed_residential_units_self_build_and_custom_build":0,"total_no_existing_residential_units_london_shared_ownership":0,"total_no_existing_residential_units_social_rent":0,"total_no_existing_residential_units_london_living_rent":0,"total_no_proposed_residential_units_social_rent":0,"total_no_proposed_residential_units_market_for_rent":2,"total_no_existing_residential_units_shared_equity":0,"total_no_proposed_residential_units_london_affordable_rent":0,"total_gia_lost":0.0,"total_no_proposed_residential_units":2,"total_no_proposed_residential_units_london_shared_ownership":0,"total_no_proposed_residential_units_discount_market_rent":0,"total_no_proposed_bedrooms":4.0,"dwelling_density":58.45218611176059,"total_no_existing_residential_affordable_units":0,"total_gia_gained":146.73,"total_no_existing_residential_units_affordable_rent":0,"total_no_proposed_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_existing_residential_units":1,"total_no_proposed_residential_affordable_units":0,"habitable_rooms_density":204.58265139116205,"total_no_proposed_residential_units_market_for_sale":0,"total_no_existing_residential_units_discount_market_sale":0,"total_no_proposed_residential_units_discount_market_sale":0,"affordable_percentage":0.0,"total_no_proposed_residential_units_starter_homes":0,"site_area":0.034215999999999996},"grey_water_reuse":false,"total_gia_existing":81.9,"total_gia_gained":146.73,"phasing_details":[{"phase_detail":"whole project","intended_commencement_date":"08/2026","intended_completion_date":"03/2027"}],"affordable_housing_fast_track":false,"site_area":0.034215999999999996,"projected_cost_of_works":"Up to £2m","rain_water_harvesting":false,"internal_resi_water_usage":110.0,"surface_water_discharge_percentage_reduction":1.0,"green_suds":false,"s106_agreement":false,"viability_assessment":false,"air_quality_assessment":false,"existing_uprns":[],"mayoral_cil_liability_notice_issued":false,"circular_economy_statement":false,"commencement_notice_received":false,"other_residential_accommodation_details":{"site_area":0.034215999999999996},"3d_model":false,"borough_cil_liability_notice_issued":false,"transport_impact_assessment":false},"site_name":null,"decision_process":"Delegated","postcode":"HA3 9NE","last_updated_by":"Portal","centroid":{"lat":51.590834,"lon":-0.294357},"polygon":{"crs":{"type":"name","properties":{"name":"EPSG:27700"}},"geometries":[{"coordinates":[[[518237.434994657,189378.661840941],[518241.180062777,189365.520732386],[518274.527429502,189378.424850832],[518272.352340581,189382.171153899],[518270.108789605,189383.588631592],[518237.434994657,189378.661840941]]],"type":"Polygon"}],"type":"geometrycollection"},"appeal_decision":null,"borough":"Harrow","cil_liability":false,"subdivision_of_building":null,"development_type":"Minor dwellings","reference_no_of_permission_being_relied_on":null}