{"decision_target_date":"02/02/2026","last_updated_by":"Planning Portal ingest","appeal_decision_date":null,"appeal_status":null,"development_type":"Other house holder developments","postcode":"HA5 1JT","title_number":["Unknown"],"application_details":{"total_gia_gained":29.38,"no_additional_bathrooms":0,"no_additional_bedrooms":0,"intended_completion_date":"01/2026","intended_commencement_date":"12/2025"},"decision_date":"16/02/2026","url_planning_app":"https://planningsearch.harrow.gov.uk//planning/index.html?fa=getApplication&id=231897","borough":"Harrow","locality":"Pinner","date_building_work_started_under_previous_permission":null,"bo_system":"Portal","parking_details":null,"site_name":null,"epc_number":null,"pp_id":"14335026","subdivision_of_building":null,"status":"Approved","description":"Garage conversion and single storey rear extension","decision_conditions":["The development hereby permitted shall be begun before the expiration of three years from the date of this permission.","The development hereby permitted shall be carried out in accordance with the following approved plans and documents:&nbsp;<span style=\"line-height: 115%;\">HG-R00-PR-101;\r\nHG-R00-PR-102; HG-R00-PR-103; HG-R00-PR-104; HG-R00-PR-105; HG-R00-EX-101; HG-R00-EX-102;\r\nHG-R00-EX-103; HG-R00-EX-104; HG-R00-EX-105; Flood Risk Assessment REV B; Fire\r\nSafety Statement</span>","The materials to be used in the construction of the external surfaces of the extension hereby permitted shall match those used in the existing building.","Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (or any order revoking and re-enacting that order with or without modification), no window(s)/door(s) shall be installed in the flank elevation(s) of the development hereby permitted without the prior permission in writing of the local planning authority.","The roof area of the extension hereby permitted shall not be used as a balcony, roof garden or similar amenity area without the grant of further specific permission from the local planning authority.","&lt;p class=&quot;MsoNormal&quot;&gt;Notwithstanding the details submitted, no development\r\n(excluding demolition) shall commence until a detailed scheme for the\r\nmanagement of surface water arising from the development has been submitted to\r\nand approved in writing by the Local Planning Authority.&lt;o:p&gt;&lt;/o:p&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot;&gt;&lt;o:p&gt;&amp;nbsp;&lt;/o:p&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot;&gt;The scheme shall include:&lt;o:p&gt;&lt;/o:p&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot;&gt;&lt;o:p&gt;&amp;nbsp;&lt;/o:p&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot;&gt;Compensatory Flood\r\nStorage (CFS): &amp;nbsp;&lt;o:p&gt;&lt;/o:p&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot;&gt;CFS Required\r\ndetails:&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot;&gt;Site plan indicating the proposed and\r\n     existing development; flood zone extent and depth category; proposed area\r\n     of displaced flood water / compensatory storage area; section marks&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot;&gt;Cross sections of CFS showing\r\n     proposed and existing ground levels in relation to finished floor levels\r\n     should be submitted.&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot;&gt;Please mark FFL as 0.00m and mark existing (-0.ABm) and\r\nlowered (-0.XYm) ground levels at the location of CFS.&lt;o:p&gt;&lt;/o:p&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot;&gt;&lt;o:p&gt;&amp;nbsp;&lt;/o:p&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot;&gt;&lt;o:p&gt;&lt;br&gt;&lt;/o:p&gt;Mitigation Measures:&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot;&gt;&lt;o:p&gt;&amp;nbsp;&lt;/o:p&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot;&gt;Detailed\r\ndescription of building materials, foundations, floor, walls, fittings,\r\nservices, doors and windows that minimise water entry whilst maintaining\r\nstructural integrity, materials and construction techniques that facilitate\r\ndrying and cleaning, in line with CLG 2007 &#x27;Improving the Flood Performance of\r\nNew Buildings&#x27; publication should be provided taking into account the depth of\r\nflooding.&lt;o:p&gt;&lt;/o:p&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot;&gt;&lt;br&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot;&gt;Drainage\r\n     Details:&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot;&gt;&lt;span lang=&quot;EN-US&quot;&gt;A drainage layout drawing showing surface and foul water connections\r\nand their outfall details from the proposed development should be submitted.\r\n&amp;nbsp;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot;&gt;&lt;span lang=&quot;EN-US&quot;&gt;Water butts\r\ncannot be considered as a means of disposal of surface water, as they are full\r\nmost year-round and should be connected to an outfall for draining.&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot;&gt;&lt;span lang=&quot;EN-US&quot;&gt;If a\r\nsoakaway is provided, please request the applicant to submit full construction\r\ndetails of the soakaway with its location, size, storage volume and\r\ncalculations. &lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot;&gt;&lt;a name=&quot;_Hlk216860320&quot;&gt;&lt;span lang=&quot;EN-US&quot;&gt;The soakaway should be located at a minimum of 5m away from any building\r\nand should be designed for a volume of 1m3&amp;nbsp;of empty storage\r\nfor&amp;nbsp; every 16m2 of hard standing/roof area draining into it.&lt;/span&gt;&lt;/a&gt;&lt;span lang=&quot;EN-US&quot;&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot;&gt;Permeable\r\n     Paving:&lt;/p&gt;&lt;p&gt;\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot;&gt;&lt;a name=&quot;_Hlk217340835&quot;&gt;&lt;span lang=&quot;EN-US&quot;&gt;Full construction details of permeable paving\r\nwith their maintenance plan. Please note that a minimum of 250mm granular\r\nsubbase should be proposed to provide adequate storage underneath.&lt;/span&gt;&lt;/a&gt;&lt;span lang=&quot;EN-US&quot;&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;"],"site_number":17,"last_updated":"2026-06-27T19:26:21.554Z","last_date_consultation_comments":"02/01/2026","valid_date":"08/12/2025","actual_commencement_date":null,"centroid_northing":187477,"appeal_decision":null,"decision_agency":"Borough","lpa_app_no":"PL/2402/25","date_building_work_completed_under_previous_permission":null,"decision":"Approved","id":"Harrow-PL_2402_25","polygon":{"type":"geometrycollection","geometries":[{"coordinates":[[[511903.204285162,187491.085038768],[511890.659246954,187460.53941825],[511895.164352278,187458.874661435],[511901.484426633,187455.114408275],[511903.781450058,187473.363584238],[511907.604037297,187489.975074057],[511903.204285162,187491.085038768]]],"type":"Polygon"}],"crs":{"type":"name","properties":{"name":"EPSG:27700"}}},"appeal_start_date":null,"decision_process":"Delegated","ward":"Pinner South","street_name":"Harlech Gardens","secondary_street_name":null,"last_synced":"2026-06-28T01:52:31.939Z","lpa_name":"Harrow","reference_no_of_permission_being_relied_on":null,"cil_liability":null,"wgs84_polygon":{"type":"Polygon","coordinates":[[[-0.386622,51.575076],[-0.386623,51.575049],[-0.386666,51.57505],[-0.386665,51.575077],[-0.386622,51.575076]]]},"uprn":200004438827,"application_type":"Householder","centroid":{"lat":51.575063,"lon":-0.386644},"lapsed_date":"16/02/2026","application_type_full":"Householder planning permission","centroid_easting":511900,"actual_completion_date":null}