{"application_details":{"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"Entire Development","intended_completion_date":"09/2025","intended_commencement_date":"08/2025"}],"total_gia_gained":42,"site_area":0.013000000000000001,"total_gia_existing":96,"total_gia_lost":17,"existing_proposed_floorspace_details":[{"gia_existing":96,"use_class":"EB","gia_gained":42,"gia_lost":17}],"projected_cost_of_works":"Up to £2m","scheme_phasing":true,"rain_water_harvesting":false,"grey_water_reuse":false,"green_suds":false,"surface_water_discharge_percentage_reduction":0,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":42,"total_gia_existing":96,"total_gia_lost":17},"garden_land_lost":false,"internal_resi_water_usage":0,"infrastructure_details":{"total_annual_pm_emissions":0,"green_roof_area":0,"no_resi_units_to_have_full_fibre":0,"no_new_water_connections_required":0,"no_homes_passive_cooling":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"waste_provision":true,"percentage_demolition_construction_material_recycling":0,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"ghg_reduction_over_building_regulations":false},"ownership_status":"Private"},"parking_details":null,"secondary_street_name":null,"appeal_start_date":null,"lapsed_date":"23/01/2029","actual_commencement_date":null,"last_updated_by":"Portal","cil_liability":null,"last_updated":"2026-10-06T07:48:16.946Z","street_name":"RAYNERS LANE","decision":"Approved","epc_number":null,"decision_date":"23/01/2026","reference_no_of_permission_being_relied_on":null,"actual_completion_date":null,"url_planning_app":"https://planningsearch.harrow.gov.uk//planning/index.html?fa=getApplication&id=231699","date_building_work_started_under_previous_permission":"10/08/2025","status":"Approved","centroid":{"lon":-7.55716,"lat":49.766807},"appeal_status":null,"decision_target_date":"09/01/2026","lpa_app_no":"PL/2618/25","postcode":"HA5 5DX","application_type_full":"Full planning permission","uprn":"100023037097","title_number":null,"decision_agency":"Borough","subdivision_of_building":"ground floor","appeal_decision_date":null,"borough":"Harrow","centroid_northing":null,"description":"Two storey rear extension; external staircase at rear (retrospective)","appeal_decision":null,"id":"Harrow-PL_2618_25","site_name":null,"development_type":"Minor retail and service","pp_id":"14392016","lpa_name":"Harrow","wgs84_polygon":{"type":"Polygon","coordinates":[[[-0.370835,51.577582],[-0.370894,51.577513],[-0.370896,51.577509],[-0.371097,51.577485],[-0.371117,51.577548],[-0.370835,51.577582]]]},"site_number":"434","last_date_consultation_comments":"10/12/2025","valid_date":"14/11/2025","application_type":"All Other","decision_conditions":["The development hereby permitted shall be begun before the expiration of three years from the date of this permission.","The materials to be used in the construction of the external surfaces of the extension hereby permitted shall match those used in the existing building.","The development hereby permitted shall be carried out in accordance with the following approved plans and documents:&amp;nbsp;&lt;span style=&quot;line-height: normal;&quot;&gt;1.0 PRE-EXISTING LOCATION – SITE PLAN; 1.1 EXISTING LOCATION – SITE PLAN; 2.0 PRE-EXISTING PLANS; 3/- PRE-EXISTING ELEVATIONS; 4.0 EXISTING PLANS; 5.0 EXISTING ELEVATIONS; Design &amp;amp; Access Statement; Flood Risk Assessment.&lt;/span&gt;"],"bo_system":"Portal","centroid_easting":null,"locality":null,"ward":"Pinner South","polygon":{"type":"geometrycollection","crs":{"type":"name","properties":{"name":"EPSG:27700"}},"geometries":[{"coordinates":[[[512989.19601164,187781.45976103],[512985.278515414,187773.67555944],[512985.149446017,187773.209013455],[512971.315349585,187770.25791062],[512969.765527605,187777.224811438],[512989.19601164,187781.45976103]]],"type":"Polygon"}]},"decision_process":"Delegated","date_building_work_completed_under_previous_permission":"22/09/2025","last_synced":"2026-10-07T01:46:43.171Z"}