{"decision_target_date":"05/02/2026","last_updated_by":"Portal","appeal_decision_date":null,"appeal_status":null,"development_type":"Minor dwellings","postcode":"HA5 4ST","title_number":[],"application_details":{"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"Single Phase","intended_commencement_date":"09/2025","intended_completion_date":"03/2026"}],"total_gia_gained":330.68,"site_area":0.115,"total_gia_lost":154.4,"total_gia_existing":154.4,"existing_proposed_floorspace_details":[{"gia_existing":154.4,"use_class":"C3","gia_gained":330.68,"actual_commencement_date":"17/06/2026","gia_lost":154.4}],"projected_cost_of_works":"Up to £2m","occupation_status":"Vacant","scheme_phasing":false,"rain_water_harvesting":false,"building_details":[{"no_storeys":3.0,"max_height":8.93,"building_ref":"Dwelling House "}],"grey_water_reuse":false,"green_suds":false,"surface_water_discharge_percentage_reduction":0.0,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":330.68,"total_gia_lost":154.4,"total_gia_existing":154.4,"site_area":0.115},"garden_land_lost":false,"residential_details":{"total_no_proposed_residential_units_shared_equity":0,"total_no_proposed_bedrooms":5.0,"total_no_proposed_residential_units":1,"total_no_proposed_residential_units_london_living_rent":0,"total_no_proposed_residential_affordable_units":0,"total_no_existing_residential_units":1,"total_no_proposed_residential_units_affordable_rent":0,"total_no_proposed_residential_units_discount_market_sale":0,"total_no_proposed_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_existing_residential_units_london_living_rent":0,"total_no_existing_residential_units_shared_equity":0,"total_no_existing_residential_units_market_for_sale":1,"total_no_existing_residential_units_intermediate":0,"total_no_proposed_residential_units_market_for_rent":0,"total_no_existing_residential_units_social_rent":0,"total_no_proposed_residential_units_self_build_and_custom_build":0,"total_no_existing_residential_units_discount_market_rent":0,"total_no_proposed_residential_units_market_for_sale":1,"total_no_existing_residential_affordable_units":0,"total_no_existing_residential_units_affordable_rent":0,"habitable_rooms_density":69.56521739130434,"total_no_existing_residential_units_london_shared_ownership":0,"total_gia_gained":330.68,"total_no_proposed_residential_units_social_rent":0,"total_no_existing_residential_units_london_affordable_rent":0,"dwelling_density":8.695652173913043,"total_no_proposed_residential_units_london_affordable_rent":0,"total_no_existing_residential_units_discount_market_sale":0,"total_gia_lost":154.4,"total_no_proposed_residential_units_starter_homes":0,"total_no_existing_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_existing_residential_units_starter_homes":0,"total_no_proposed_residential_units_discount_market_rent":0,"total_no_proposed_residential_units_intermediate":0,"affordable_percentage":0.0,"total_no_proposed_residential_units_london_shared_ownership":0,"residential_units":[{"actual_completion_date":"17/06/2026","description":null,"change_type":"Loss","sheltered_accommodation":false,"unit_type":"House or Bungalow","unit_development_type":"New Build","no_habitable_rooms":5.0,"phase_detail":null,"unit_no":null,"actual_commencement_date":"17/06/2026","no_bedrooms":3.0,"provision_for_older_persons":false,"tenure":"Market for sale","gia":154.4},{"description":null,"change_type":"Gain","unit_type":"House or Bungalow","unit_development_type":"New Build","provider":"Private","no_habitable_rooms":8.0,"phase_detail":null,"unit_no":null,"actual_commencement_date":"17/06/2026","no_bedrooms":5.0,"provision_for_older_persons":false,"tenure":"Market for sale","gia":330.68}],"total_no_existing_residential_units_market_for_rent":0,"total_no_existing_residential_units_self_build_and_custom_build":0,"site_area":0.115},"infrastructure_details":{"total_annual_pm_emissions":0.0,"no_resi_units_to_have_full_fibre":0.0,"green_roof_area":0.0,"urban_greening_factor_score":0.0,"no_homes_passive_cooling":0.0,"no_new_water_connections_required":0.0,"no_non_resi_units_to_have_full_fibre":0.0,"total_annual_nox_emissions":0.0,"waste_provision":false,"percentage_demolition_construction_material_recycling":0.0,"no_homes_to_have_electrical_heating":0.0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0.0,"ghg_reduction_over_building_regulations":false},"internal_resi_water_usage":0.0,"ownership_status":"Private","s106_agreement":false,"viability_assessment":false,"air_quality_assessment":false,"existing_uprns":[],"mayoral_cil_liability_notice_issued":false,"commencement_notice_received":false,"circular_economy_statement":false,"other_residential_accommodation_details":{"site_area":0.115},"3d_model":false,"borough_cil_liability_notice_issued":false,"transport_impact_assessment":false},"decision_date":"17/06/2026","url_planning_app":"https://planningsearch.harrow.gov.uk//planning/index.html?fa=getApplication&id=231949","borough":"Harrow","locality":"Pinner","date_building_work_started_under_previous_permission":"19/09/2025","bo_system":"Portal","parking_details":null,"site_name":null,"epc_number":null,"pp_id":"14540667","subdivision_of_building":null,"status":"Commenced","description":"Demolition of existing dwelling ( part retrospective ) and construction of a replacement house using matching external materials; incorporating single and two storey front extension, single and two storey rear extension; first floor side extension; part conversion of garage to habitable room; rooflights in front and rear roof slopes; external alterations","decision_conditions":["The development hereby permitted shall be begun before the expiration of three years from the date of this permission.","Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (or any order revoking and re-enacting that order with or without modification), no window(s)/door(s), other than those shown on the approved plans shall be installed in the flank elevation(s) of the development hereby permitted without the prior permission in writing of the local planning authority.","The materials to be used in the construction of the external surfaces of the extension hereby permitted shall match those used in the existing building.","The roof area of the extension hereby permitted shall not be used as a balcony, roof garden or similar amenity area without the grant of further specific permission from the local planning authority.","The refuse bins shall be stored at all times, other than on collection days, in the designated refuse storage area, as shown on the approved drawing.","The window(s) in the first floor flank elevation(s) of the proposed development shall:\n(a) be of purpose-made obscure glass,\n(b) be permanently fixed closed below a height of 1.7m above finished floor level,\nand shall thereafter be retained in that form.","The development hereby approved shall not be commenced beyond damp proof course level until a scheme for the following hard and soft landscape have been submitted to, and agreed in writing by, the local planning authority.Landscaping to be Approved conversion - including landscape masterplan, hard and soft landscape details. Soft landscape works to include:Planting plans (at a scale not less than 1:100)Schedules of plants, noting species, plant sizes, plant container sizes (all at time of planting) and proposed numbers / densitiesWritten specification of planting and cultivation works to be undertakenA landscape implementation programme with proposed timing / dates for the works. Hard materials                                   Boundary Treatment Secure and screened bin and bike storage Landscaping Scheme – Implementation and implementation programme, including a period of 5 year period for replacements of soft landscape The development shall be carried out in accordance with the scheme so agreed and shall be retained as such thereafter. ","The development hereby approved shall not be commenced beyond damp proof course level until, a Fire Safety Statement has been submitted to, and agreed in writing by, the local planning authority this statement shall include details of how the development will function in terms of the following: 1) identify suitably positioned unobstructed outside space: a) for fire appliances to be positioned on b) appropriate for use as an evacuation assembly point 2) is designed to incorporate appropriate features which reduce the risk to life and the risk of serious injury in the event of a fire; including appropriate fire alarm systems and passive and active fire safety measures 3) is constructed in an appropriate way to minimise the risk of fire spread 4) provide suitable and convenient means of escape, and associated evacuation strategy for all building users 5) develop a robust management strategy for evacuation which is to be periodically updated and published (details of how often this management strategy is to be reviewed and published to be included), and which all building users can have confidence in 6) provide suitable access and equipment for firefighting which is appropriate for the size and use of the development. The development shall be operated in accordance with the approved details in perpetuity.","The development hereby permitted shall be carried out in accordance with the following approved plans and documents: Site Location Plan, Design and access statement, Flood Risk Assessment, Reasonable\nException Statement, Construction Phase Surface Water & Groundwater\nManagement Statement, OHC-SPL-XX-DR-C-0505-Catch_-Areas-O-flow-Analysis,\n OHC-SPL-XX-DR-C-0503-Drainage-Details-03-P02,\nOHC-SPL-XX-DR-C-0502-Drainage-Details-02-P01, OHC-SPL-XX-DR-C-0501-Drainage-Details-01-P01,\nOHC-SPL-XX-DR-C-0500-Drainage-Plan-Layout-P02, OHC-SPL-XX-DR-C-0100-Site-Location-Plan,\nFloodflow-Analysis-1000-yr-40-CC-30minWinter-Rev-02,  FEH22-2yr-30yr-100yr-40-CC-5-lps-Rev-02,  FEH22-100yr-40-CC-6hr-5-lps-max-Rev,  Construction-Water-Groundwater-Management-Statement,  Areas-O-flow-Analysis,  First Page, Block and Location Plan,  Cover,  Site\nPlan, Floor Plans / Pre- Existing and Existing, Elevations / Pre- Existing, Ground\n& First Floor Plan,  Loft Plan,  Roof Floor Plan, Proposed Elevations,  Section"],"site_number":"11","last_updated":"2026-08-05T15:17:32.099Z","last_date_consultation_comments":"09/01/2026","valid_date":"11/12/2025","actual_commencement_date":"17/06/2026","centroid_northing":190627.0,"appeal_decision":null,"decision_agency":"Borough","lpa_app_no":"PL/3224/25","date_building_work_completed_under_previous_permission":null,"decision":"Approved","id":"Harrow-PL_3224_25","polygon":{"type":"geometrycollection","geometries":[{"coordinates":[[[512339.294793397,190650.093339575],[512341.522362662,190608.604994159],[512358.402724534,190609.480949731],[512355.386233383,190650.249468608],[512350.222926424,190651.740294054],[512346.395596128,190651.956427101],[512343.280965844,190651.787036019],[512339.294793397,190650.093339575]]],"type":"Polygon"}],"crs":{"type":"name","properties":{"name":"EPSG:27700"}}},"appeal_start_date":null,"decision_process":"Delegated","ward":"Pinner","street_name":"OLD HALL CLOSE","secondary_street_name":null,"last_synced":"2026-08-06T02:29:17.226Z","lpa_name":"Harrow","reference_no_of_permission_being_relied_on":null,"cil_liability":false,"wgs84_polygon":{"type":"Polygon","coordinates":[[[-0.379293,51.603494],[-0.379274,51.603121],[-0.37903,51.603126],[-0.379061,51.603493],[-0.379135,51.603507],[-0.37919,51.60351],[-0.379235,51.603509],[-0.379293,51.603494]]]},"uprn":"100021304921","application_type":"All Other","centroid":{"lat":51.603285,"lon":-0.379131},"lapsed_date":"17/06/2029","application_type_full":"Full planning permission","centroid_easting":512351.0,"actual_completion_date":null}