{"decision_target_date":"16/02/2026","last_updated_by":"Portal","appeal_decision_date":null,"appeal_status":null,"development_type":"Other house holder developments","postcode":"HA8 6BH","title_number":null,"application_details":{"site_area":95,"other_residential_accommodation_details":{"site_area":95},"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"Entire Development","intended_completion_date":"12/2026","intended_commencement_date":"07/2026"}],"total_gia_gained":29.87,"total_gia_lost":0,"total_gia_existing":139.12,"existing_proposed_floorspace_details":[{"gia_existing":139.12,"use_class":"C3","gia_gained":29.87,"gia_lost":0}],"projected_cost_of_works":"Up to £2m","occupation_status":"Occupied","scheme_phasing":true,"rain_water_harvesting":false,"building_details":[{"no_storeys":3,"max_height":7.94,"building_ref":"Existing Dwelling - Rear Dormer Extension "}],"grey_water_reuse":false,"green_suds":false,"surface_water_discharge_percentage_reduction":0,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":29.87,"total_gia_lost":0,"total_gia_existing":139.12},"garden_land_lost":false,"infrastructure_details":{"total_annual_pm_emissions":0,"no_resi_units_to_have_full_fibre":1,"green_roof_area":0,"urban_greening_factor_score":0,"no_homes_passive_cooling":0,"no_new_water_connections_required":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"waste_provision":true,"percentage_demolition_construction_material_recycling":0,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"ghg_reduction_over_building_regulations":true},"internal_resi_water_usage":110,"ownership_status":"Private"},"decision_date":"15/04/2026","url_planning_app":"https://planningsearch.harrow.gov.uk//planning/index.html?fa=getApplication&id=232008","borough":"Harrow","locality":"Edgware","date_building_work_started_under_previous_permission":null,"bo_system":"Portal","parking_details":{"no_proposed_car":1,"no_existing_car":1,"net_car":0},"site_name":null,"epc_number":"8335-1724-4400-0778-9226","pp_id":"14562241","subdivision_of_building":"Roof: Alteration to the existing roof structure to accommodate the loft floor and application of new external finishes\nLoft Floor: Creation of a new habitable level (a bedroom and associated spaces) within the roof space\nFirst Floor: Alterations to the existing floor plan to incorporate the new staircase leading up to the second-floor habitable space.","status":"Approved","description":"Alterations to roof to form end gable and rear dormer","decision_conditions":["The development hereby permitted shall be begun before the expiration of three years from the date of this permission.","The materials to be used in the construction of the external surfaces of the extension hereby permitted shall match those used in the existing building.","<p>The development hereby permitted shall be carried out in accordance with the following approved plans and documents:</p><p>1051-00-001-PL1</p><p>1051-00-100-PL1</p><p>1051-00-101-PL1</p><p>1051-00-300-PL1</p><p>1051-10-100-PL1</p><p>1051-10-101-PL1</p><p>1051-10-301-PL1</p>"],"site_number":"126","last_updated":"2026-10-06T07:47:31.957Z","last_date_consultation_comments":"13/01/2026","valid_date":"22/12/2025","actual_commencement_date":null,"centroid_northing":null,"appeal_decision":null,"decision_agency":"Borough","lpa_app_no":"PL/3321/25","date_building_work_completed_under_previous_permission":null,"decision":"Approved","id":"Harrow-PL_3321_25","polygon":{"geometries":[{"coordinates":[[[518501.1,190242.9],[518507.45,190243.95],[518510,190244.4],[518508.7,190253.1],[518504.05,190252.3],[518504.2,190251.8],[518500,190251.2],[518499.3,190251.15],[518499.65,190248.5],[518500,190248.55],[518500.3,190248.55],[518501.1,190242.9]]],"type":"Polygon"}],"type":"GeometryCollection"},"appeal_start_date":null,"decision_process":"Delegated","ward":null,"street_name":"TURNER ROAD","secondary_street_name":null,"last_synced":"2026-10-07T01:41:41.787Z","lpa_name":"Harrow","reference_no_of_permission_being_relied_on":null,"cil_liability":null,"wgs84_polygon":{"type":"Polygon","coordinates":[[[-0.2905,51.598573],[-0.290408,51.598581],[-0.290371,51.598585],[-0.290386,51.598663],[-0.290454,51.598657],[-0.290452,51.598653],[-0.290513,51.598648],[-0.290523,51.598648],[-0.290519,51.598624],[-0.290514,51.598624],[-0.290509,51.598624],[-0.2905,51.598573]]]},"uprn":"100021248518","application_type":"Householder","centroid":{"lat":49.766807,"lon":-7.55716},"lapsed_date":"15/04/2029","application_type_full":"Full planning permission","centroid_easting":null,"actual_completion_date":null}