{"uprn":"100021336326","ward":"St Andrew's","epc_number":"8906-7121-4570-3712-9996","description":"Retention of outbuilding and conversion of outbuilding to a granny annexe for additional accommodation which is ancillary to the main facilities in the primary dwelling.","centroid_easting":554148.0,"decision_date":"04/11/2026","street_name":"Hornchurch","locality":null,"status":"Approved","date_building_work_started_under_previous_permission":null,"application_type_full":"Householder planning permission","lpa_name":"Havering","decision_target_date":"04/11/2026","lpa_app_no":"P0857.26","title_number":["EGL80106"],"decision":"Approved","last_updated":"2026-11-16T05:00:06.355Z","appeal_start_date":null,"actual_commencement_date":null,"bo_system":"CSV Data Import","secondary_street_name":null,"last_synced":"2026-11-17T02:16:08.473Z","decision_agency":"Borough","last_date_consultation_comments":"29/10/2026","appeal_decision_date":null,"actual_completion_date":null,"centroid_northing":186636.0,"wgs84_polygon":{"coordinates":[[[0.222329,51.557593],[0.222197,51.557601],[0.222186,51.557602],[0.222108,51.557606],[0.22199,51.557612],[0.221858,51.557619],[0.221745,51.557625],[0.221651,51.557631],[0.221594,51.557634],[0.221555,51.557637],[0.22155,51.557525],[0.22225,51.557487],[0.222313,51.557484],[0.222445,51.557476],[0.222451,51.557524],[0.222459,51.557585],[0.222335,51.557593],[0.222329,51.557593]]],"type":"Polygon"},"date_building_work_completed_under_previous_permission":null,"lapsed_date":"04/11/2029","decision_conditions":["The development hereby permitted shall not be carried out otherwise than in complete accordance with the following approved plans:","25008-PL-002 Rev. A","25008-PL-100 Rev. B","25008-PL-150 Rev. A","25008-PL-200 Rev. B","25008-PL-210 Rev. A","25008-PL-220 Rev. B","25008-PL-230 Rev. B","25008-PL-301 Rev. A","25008-PL-302 Rev. A","25008-PL-303 Rev. A","25008-PL-304 Rev. A","[U]Reason[]","For the avoidance of doubt and to ensure that the development is carried out as approved and is compliant with development plan policy.","Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015, nor any Statutory Instrument which amends, removes or replaces that Order, no window or other opening (other than those shown on the submitted and approved plans) shall be formed in the flank walls of the development hereby permitted without the receipt of a specific planning permission for it from the London Planning Authority.","[U]Reason[]","To protect the amenities of neighbouring occupiers and ensure the development complies with policy 7 of the Havering Local Plan (2021)","The annexe hereby permitted shall not be arranged or disposed of as a separate unit of residential accommodation from the use of the main dwelling.","Reason:-","In order that the annex approved remains ancillary to the main dwelling and that the development accords with the Havering Local Plan.","The garden area shall not be sub-divided at any time.","Reason:-","In order that the annex approved remains ancillary to the main dwelling.","The annexe hereby approved shall only be occupied by the parent of the applicant and/or its occupation  limited to direct relative of the occupiers of the main dwelling and shall not be occupied by any other persons.","Reason:-","In order that the annex approved remains ancillary to the main dwelling.","Any boilers installed in the dwelling(s) hereby approved shall be Ultra-Low NOx boilers with maximum NOx Emissions less than 40 mg/kWh. Where any installations do not meet this emissions standard it should not be operated without the fitting of suitable NOx abatement equipment or technology as determined by a specialist to ensure comparable emissions. The installation of the boilers shall be carried out in strict accordance with these details and shall thereafter be permanently retained.","If the heating strategy is to be provided by an Air Source Heat Pump, or similar, they shall be designed to comply with the provisions of the Microgeneration Installation Standard: MCS 020 \"MCS Planning Standards for Permitted Development Installations of Wind Turbines and Air Source Heat Pumps on Domestic Premises\".  The air source heat pumps shall be provided on site prior to first occupation of the dwellings.  Any installation not meeting this standard will require a separate application for planni","[U]Positive and Proactive Statement[]","The Local Planning Authority has acted positively and proactively in determining this application by assessing the proposal against all material planning considerations, including planning policies and any representations which were received.  It subsequently determined to grant planning permission in accordance with the National Planning Policy requirement that applications for sustainable development are approved where possible.  A detailed analysis of the scheme is set out in the report on the application prepared by officers.","[U]Building Regulations[]","You are reminded that this decision notice only addresses requirements under Planning Legislation. You also need to check that whether or not the development requires consent under the Building Regulations, as this is an entirely separate process.  Further information on the requirements of the Building Regulations can be found at: https://www.havering.gov.uk/building control.","[U]Highways Matters[]","You are reminded that this decision notice only addresses requirements under Planning Legislation.  It does not give consent for an permanent or temporary changes to the public highway, the use of the public highway for the storage of materials or placing of apparatus associated with the construction or other processes, nor does it permit the discharge of surface water onto the public highway.  You are encouraged to check whether or not works or activities necessitate separate consents under the requirements of other, non-planning legislation at the earliest opportunity by emailing environmentbusinesssupport@havering.gov.uk for further information.  Unauthorised work on or use of the public highway and a failure to prevent the discharge of surface water on to the public highway area all an offence.","[U]Party Wall Act[]","You are reminded that this decision notice only addresses requirements under Planning Legislation.  You also need to check whether or not the development necessitates an agreement under the requirements of the Party Wall etc. Act 1996, as this is an entirely separate process.  Further guidance on the Party Wall etc. Act 1996 can be found at: https;//www.gov.uk/housing-local-and-community/party-walls."],"id":"Havering-P0857.26","application_type":"All Other","pp_id":"15083449","parking_details":{"net_car":0,"no_proposed_car":3,"no_existing_car":3},"url_planning_app":"http://development.havering.gov.uk/OcellaWeb/planningDetails?reference=P0857.26","appeal_status":null,"valid_date":"15/07/2026","site_number":52,"application_details":{"intended_completion_date":"12/2026","total_gia_gained":52.97,"intended_commencement_date":"09/2026","no_additional_bedrooms":1,"no_additional_bathrooms":1},"site_name":"52 Mill Park Avenue","decision_process":"Delegated","postcode":"RM12 6HD","last_updated_by":"CSV Data Import","centroid":{"lat":51.557549,"lon":0.222213},"polygon":{"geometries":[{"coordinates":[[[554155.9,186641.2],[554146.72,186641.825],[554145.95,186641.9],[554140.5,186642.2],[554132.3,186642.55],[554123.15,186643.05],[554115.3,186643.45],[554108.751,186643.921],[554104.792,186644.206],[554102.1,186644.4],[554102.1,186631.95],[554150.75,186629.2],[554155.15,186629],[554164.35,186628.45],[554164.6,186633.8],[554164.9,186640.6],[554156.308,186641.173],[554155.9,186641.2]]],"type":"Polygon"}],"type":"GeometryCollection"},"appeal_decision":null,"borough":"Havering","cil_liability":false,"subdivision_of_building":null,"development_type":null,"reference_no_of_permission_being_relied_on":null}