{"polygon":null,"site_number":null,"appeal_decision_date":null,"ward":"Rainham & Wennington","appeal_decision":null,"appeal_start_date":null,"epc_number":"0350-2032-9520-2606-6851","borough":"Havering","title_number":null,"valid_date":"18/08/2026","status":"Approved","decision_process":"Delegated","secondary_street_name":null,"date_building_work_completed_under_previous_permission":null,"reference_no_of_permission_being_relied_on":null,"last_updated":"2026-11-16T05:00:07.291Z","decision_target_date":"20/10/2026","street_name":"Rainham","postcode":"RM13 9JU","site_name":"29 Farm Road","lpa_app_no":"P0967.26","development_type":null,"locality":null,"application_type_full":"Full planning permission","wgs84_polygon":null,"bo_system":"CSV Data Import","url_planning_app":"http://development.havering.gov.uk/OcellaWeb/planningDetails?reference=P0967.26","actual_completion_date":null,"application_type":"All Other","decision":"Approved","decision_date":"20/10/2026","date_building_work_started_under_previous_permission":null,"appeal_status":null,"centroid_easting":553322.0,"lpa_name":"Havering","decision_agency":"Borough","last_updated_by":"CSV Data Import","last_synced":"2026-11-17T02:16:08.473Z","lapsed_date":"20/10/2029","description":"Demolition of existing dwelling and erection of two semi-detached dwellings with associated parking, landscaping and access arrangements.","last_date_consultation_comments":"11/09/2026","application_details":{"infrastructure_details":{"ghg_reduction_over_building_regulations":true,"no_homes_passive_cooling":2,"urban_greening_factor_score":0.4,"no_passive_fast_ev_charging_points":0,"no_homes_to_have_electrical_heating":2,"no_new_water_connections_required":2,"waste_provision":true,"total_annual_pm_emissions":0,"mobile_network_operators_consultation":false,"no_resi_units_to_have_full_fibre":2,"green_roof_area":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"fire_suppression_system_proposed":false,"no_active_fast_ev_charging_points":2,"no_new_gas_connections_required":2,"percentage_demolition_construction_material_recycling":95},"residential_details":{"total_no_proposed_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_proposed_residential_units_shared_equity":0,"total_no_proposed_residential_units_market_for_sale":2,"residential_units":[{"no_habitable_rooms":7,"change_type":"Loss","sheltered_accommodation":false,"no_bedrooms":3,"unit_type":"House or Bungalow","provision_for_older_persons":false,"gia":127,"tenure":"Market for sale"},{"no_habitable_rooms":5,"provider":"Private","change_type":"Gain","garden_land":true,"no_bedrooms":3,"unit_type":"Semi Detached Home","gia":123,"tenure":"Market for sale"},{"no_habitable_rooms":5,"provider":"Private","change_type":"Gain","garden_land":true,"no_bedrooms":3,"unit_type":"Semi Detached Home","gia":123,"tenure":"Market for sale"}],"total_no_proposed_residential_units_self_build_and_custom_build":0,"dwelling_density":0,"total_no_proposed_residential_units_discount_market_rent":0,"total_no_proposed_residential_units":2,"total_no_proposed_residential_affordable_units":0,"total_no_proposed_bedrooms":6,"total_no_existing_residential_units_intermediate":0,"total_no_existing_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_existing_residential_units_social_rent":0,"total_no_existing_residential_units_discount_market_sale":0,"total_no_proposed_residential_units_london_affordable_rent":0,"total_no_existing_residential_units_london_affordable_rent":0,"total_gia_lost":127,"total_no_existing_residential_units_discount_market_rent":0,"total_no_existing_residential_units_self_build_and_custom_build":0,"habitable_rooms_density":null,"total_no_existing_residential_units_london_living_rent":0,"total_no_proposed_residential_units_affordable_rent":0,"total_no_existing_residential_affordable_units":0,"total_no_existing_residential_units_market_for_sale":1,"total_no_existing_residential_units_starter_homes":0,"total_gia_gained":246,"total_no_existing_residential_units_affordable_rent":0,"total_no_proposed_residential_units_starter_homes":0,"total_no_proposed_residential_units_intermediate":0,"affordable_percentage":0.0,"total_no_proposed_residential_units_london_shared_ownership":0,"total_no_existing_residential_units_market_for_rent":0,"total_no_proposed_residential_units_social_rent":0,"total_no_proposed_residential_units_discount_market_sale":0,"total_no_existing_residential_units_london_shared_ownership":0,"total_no_proposed_residential_units_market_for_rent":0,"total_no_existing_residential_units":1,"total_no_proposed_residential_units_london_living_rent":0,"total_no_existing_residential_units_shared_equity":0},"total_gia_existing":127,"grey_water_reuse":false,"green_suds":true,"ownership_status":"Private","existing_proposed_floorspace_details":[{"gia_existing":127,"use_class":"C3","gia_gained":119,"gia_lost":0}],"total_gia_gained":119,"site_area":0.0533,"projected_cost_of_works":"Up to £2m","rain_water_harvesting":false,"surface_water_discharge_percentage_reduction":50,"phasing_details":[{"phase_detail":"Demolition and Construction","intended_commencement_date":"12/2026","intended_completion_date":"04/2027"}],"scheme_phasing":true,"building_details":[{"no_storeys":2,"max_height":7.2,"building_ref":"29a"},{"no_storeys":2,"max_height":7.2,"building_ref":"29b"}],"total_gia_lost":0,"garden_land_lost":true,"internal_resi_water_usage":110,"affordable_housing_fast_track":false,"non_residential_details":{"total_gia_lost":0,"total_gia_gained":119,"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_existing":127}},"pp_id":"15125142","actual_commencement_date":null,"uprn":"100021350012","centroid_northing":182950.0,"subdivision_of_building":null,"centroid":{"lat":51.524656,"lon":0.208703},"parking_details":{"no_proposed_cycle":4,"no_proposed_car":2,"net_car":1,"no_existing_cycle":0,"net_cycle":4,"no_existing_car":1},"id":"Havering-P0967.26","cil_liability":true,"decision_conditions":["The development to which this permission relates must be commenced not later than three years from the date of this permission.","Reason:-","To comply with the requirements of Section 91 of the Town and Country Planning Act 1990 (as amended by Section 51 of the Planning and Compulsory Purchase Act 2004).","The development hereby permitted shall not be carried out otherwise than in complete accordance with the following approved plans:","2604 A301C, 2604 A302B, 2604 A303B, 2604 A401C, 2604 A402C, 2604 A501A,2604 A601C, 2604 A602C, 2604 A801B and 2604 A701A","Reason:-","For the avoidance of doubt and to ensure that the development is carried out as approved and is compliant with development plan policy.","Prior to any construction work above ground level hereby permitted is carried out, written specification of external walls and roof materials to be used in the construction of the building(s) together with the details of pro voltaic solar panel shall be submitted to and approved in writing by the Local Planning Authority and thereafter the development shall be constructed with the approved materials.","Reason:-","Insufficient information has been supplied with the application to judge the appropriateness of the materials to be used.  Submission of a written specification prior to commencement will ensure that the appearance of the proposed development will harmonise with the character of the surrounding area.","Notwithstanding the indicative details shown on the plans hereby approved, before occupation of the dwelling, a details of all proposed walls, fences and boundary treatment shall be submitted to, and approved in writing by, the Local Planning Authority.  The boundary development shall then be carried out in accordance with the approved details and retained permanently thereafter to the satisfaction of the Local Planning Authority.","Reason:","Insufficient information has been supplied with the application to judge the appropriateness of any boundary treatment.  Submission of this detail prior to commencement will protect the visual amenities of the development and prevent undue overlooking of adjoining property.","Before the new dwellings hereby permitted is first occupied, the area set aside for car parking shall be laid out and surfaced to the satisfaction of the Local Planning Authority and retained permanently thereafter for the accommodation of vehicles visiting the site and shall not be used for any other purpose.","Reason:-","To ensure that car parking accommodation is made permanently available to the standards adopted by the Local Planning Authority in the interest of highway safety.","All residential parking spaces within the development hereby approved relating to the new dwelling shall include provision of infrastructure for electric or Ultra-Low Emission vehicles, of which a minimum of one space per dwelling shall have active charging facilities, with passive provision for all remaining spaces. Such provision is to be made prior to the first occupation of the new dwelling hereby permitted.","Reason:  Provision prior to first occupation of the proposed dwelling hereby permitted will ensure that the development adequately incorporates measures to allow the use of electric vehicles by future occupiers in accordance with of the London Plan.","Before the new dwelling hereby permitted is first occupied (including the existing host building), provision shall be made within the site for refuse and recycling facilities as shown on drawing no. 2604 - 601C thereafter such provision shall be made permanently available for the life of the development, unless otherwise agreed in writing with the Local Planning Authority.","Reason:-","To ensure that refuse and recycling facilities is made permanently available to the standards adopted by the Local Planning Authority in the interest of the amenity of occupiers of the development and the locality generally.","Before the new dwelling hereby permitted is first occupied (including the existing host building), provision shall be made within the site for cycling storage as shown on drawing no. 2604 - 601C, thereafter such provision shall be made permanently available for the life of the development, unless otherwise agreed in writing with the Local Planning Authority.","Reason:-","To ensure that cycle storage is made permanently available to the standards adopted by the London Plan in the interest of the providing a wide range of facilities for non-motor car residents and sustainability.","Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015, no window or other opening (other than those shown on the submitted and approved plan,) shall be formed in the flank wall(s) of the building(s) hereby permitted, unless specific permission under the provisions of the Town and Country Planning Act 1990 has first been sought and obtained in writing from the Local Planning Authority.","Reason:-","In order to ensure a satisfactory development that will not result in any loss of privacy or damage to the environment of neighbouring properties which exist or may be proposed in the future.","Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015, other than porches and outbuilding erected in accordance with the Order, no extension or enlargement (including additions to roofs) shall be made to the new dwellinghouse hereby permitted, without the express permission in writing of the Local Planning Authority.","Reason:-","In the interests of amenity and to enable the Local Planning Authority to retain control over future development.","All building operations in connection with the construction of external walls, roof, and foundations; site excavation or other external site works; works involving the use of plant or machinery; the erection of scaffolding; the delivery of materials; the removal of materials and spoil from the site, and the playing of amplified music shall only take place between the hours of 8.00am and 6.00pm Monday to Friday, and between 8.00am and 1.00pm on Saturdays and not at all on Sundays and Bank Holidays/Public Holidays.","Reason:-","To protect residential amenity.","The dwelling hereby approved shall comply with Regulation 36 (2)(b) and Part G2 of the Building Regulations - Water Efficiency.","Reason: In order to comply with national optional technical standards as required by the London Plan.","Any boilers installed in the dwelling(s) hereby approved shall be Ultra-Low NOx boilers with maximum NOx Emissions less than 40 mg/kWh. Where any installations do not meet this emissions standard it should not be operated without the fitting of suitable NOx abatement equipment or technology as determined by a specialist to ensure comparable emissions. The installation of the boilers shall be carried out in strict accordance with these details and shall thereafter be permanently retained.","If the heating strategy is to be provided by an Air Source Heat Pump, or similar, they shall be designed to comply with the provisions of the Microgeneration Installation Standard: MCS 020 \"MCS Planning Standards for Permitted Development Installations of Wind Turbines and Air Source Heat Pumps on Domestic Premises\".  The air source heat pumps shall be provided on site prior to first occupation of the dwellings.  Any installation not meeting this standard will require a separate application for planni","The dwellings hereby approved shall be constructed to comply with Part M4(2) of the Building Regulations - Accessible and Adaptable Dwellings.","Reason: In order to comply with Policy 7 of the Havering Local Plan and Policy D7 of the London Plan.","The first floor flank windows shall be  obscure-glazed, and  non-opening unless the parts of the window which can be opened are more than 1.7m above the floor of the room in which the window is installed.","Reason - In the interest of privacy and to protect the amenity of the adjacent neighbours","The hard surface hereby approved (including any sub-base) shall be made of porous materials or provision shall be made to direct run-off water from the hard surface to a permeable or porous area or surface within the curtilage of the dwellinghouse.","Reason:-","In order to ensure no water run-off from the hard surface which would contribute to risk of flooding","The proposal involves works which affect the highway and/or its verge.  Before commencing such works you must obtain separate consent of the Highway Authority.  Please contact the Streetcare on 01708 432563.","INFORMATIVE","In promoting the delivery of safer, stronger, sustainable places the Local Planning Authority fully supports the adoption of the principles and practices of the Secured by Design Award Scheme and Designing against Crime. Your attention is drawn to the free professional service provided by the Metropolitan Police Designing Out Crime Officers for North East London, whose can be contacted via DOCOMailbox.NE@met.police.uk or 0208 217 3813  . They are able to provide qualified advice on incorporating crime prevention measures into new developments.","With regards to surface water drainage it is the responsibility of the developer to make proper provision for drainage to ground, water courses or a suitable sewer.  In respect of surface water it is recommended that the applicant should ensure that storm flows are attenuated or regulated into the receiving public network through on or off site storage.  When it is proposed to connect to a combined public sewer, the site drainage should be separate and combined at the final manhole nearest the boundary.  Connections are not permitted for the removal of Ground Water.  Where the developer proposes to discharge to a public sewer, prior approval from Thames Water Developer Services will be required.  They can be contacted on 0845 850 2777 or refer to their website for further guidance at https://www.thameswater.co.uk/help/home-improvements/how-to-connect-to-a-sewer/sewer-connection-design.","Changes to the public highway (including permanent or temporary access)","- Planning approval does not constitute approval for changes to the public highway. Highway Authority approval will only be given after suitable details have been submitted considered and agreed. If new or amended access is required (whether temporary or permanent), there may be a requirement for the diversion or protection of third party utility plant or highway authority assets and it is recommended that early involvement with the relevant statutory undertaker takes place. The applicant should email environmentbusinesssupport@havering.gov.uk for further information. Please note that unauthorised work on the highway is an offence.","Highway legislation","- The developer (including their representatives and contractors) is advised that planning consent does not discharge the requirements of the New Roads and Street Works Act 1991 and the Traffic Management Act 2004. Formal notifications and approval will be needed fo","The proposal is liable for the Mayor of London Community Infrastructure Levy (CIL). The Mayoral CIL levy rate for Havering is £25/m² and is chargeable for each additional square metre of residential gross internal floor (GIA).  Based upon the information supplied with the application, £2,316.25 would be payable due to result in a new residential property with 109m² of GIA, however this may be adjusted subject to indexation.","Havering CIL (125 per sqm) - £2975.00","Mayoral CIL (25 per sqm) - £14,875.00","The proposal is also liable for Havering Council's CIL. Havering's CIL charging rate for residential is £125m² (Zone A) for each additional square metre of GIA. Based upon the information supplied with the application, £11,581.25","would be payable, subject to indexation.","These charges are levied under s.206 of the Planning Act 2008.  CIL is payable within 60 days of commencement of development. A Liability Notice will be sent to the applicant (or anyone else who has assumed liability)","You should also check whether the development requires separate Building Regulation consent. Information is available on the Building Control webpages and the team is available between 9am and 10am Monday to Friday via 01708 432700.","Before occupation of the residential/ commercial unit(s) hereby approved, it is a requirement to have the property/properties officially Street Named and Numbered by our Street Naming and Numbering Team.  Official Street Naming and Numbering will ensure that that Council has record of the property/properties so that future occupants can access our services.  Registration will also ensure that emergency services, Land Registry and the Royal Mail have accurate address details.  Proof of having officially gone through the Street Naming and Numbering process may also be required for the connection of utilities. For further details on how to apply for registration see:","https://www.havering.gov.uk/Pages/Services/Street-names-and-numbering.aspx","This planning permission does not remove the need to obtain any separate consent of the owner of the adjoining property prior to commencing building works on, under, above or immediately adjacent to their property (e.g. foundations or guttering). The Party Wall Etc. Act 1996 contains requirements to serve notice on adjoining owners of property under certain circumstances, and a procedure exists for resolving disputes. This is a matter of civil law between the two parties, and the Local Planning Authority are not involved in such matters.","A free guide called \"The Party Wall Etc Act 1996: Explanatory Booklet\" is available on the website of the Department for Communities and Local Government.","https://www.gov.uk/government/publications/the-party-wall-etc-act-1996-revised-explanatory-booklet","This permission does not infer or grant approval to fire safety arrangements. Such changes will require contact other bodies, as appropriate to comply with fire safety law.","The Local Planning Authority has acted positively and proactively in determining this application by assessing the proposal against all material planning considerations, including planning policies and any representations which were received.  It subsequently determined to grant planning permission in accordance with the National Planning Policy requirement that applications for sustainable development are approved where possible.  A detailed analysis of the scheme is set out in the report on the application prepared by officers."]}