{"postcode":"RM1 2AJ","status":"Approved","decision_agency":"Borough","subdivision_of_building":"Rear elevation and areas to second floor of the rear wing.","appeal_start_date":null,"cil_liability":true,"decision_conditions":["The development to which this permission relates must be commenced not later than three years from the date of this permission.","Reason:-","To comply with the requirements of Section 91 of the Town and Country Planning Act 1990 (as amended by Section 51 of the Planning and Compulsory Purchase Act 2004).","The development hereby permitted shall not be carried out otherwise than in complete accordance with the approved plans (as set out on page one of this decision notice).","Reason:-","For the avoidance of doubt and to ensure that the development is carried out as approved.","All new external finishes shall be carried out in materials to match those of the existing building(s) to the satisfaction of the Local Planning Authority.","Reason:-","To safeguard the appearance of the premises and the character of the immediate area.","Prior to the commencement of any works pursuant to this permission the developer shall submit for the written approval of the Local Planning Authority;","a) A Phase I (Desktop Study) Report documenting the history of the site, its surrounding area and the likelihood of contaminant/s, their type and extent incorporating a Site Conceptual Model.","b) A Phase II (Site Investigation) Report if the Phase I Report confirms the possibility of a significant risk to any sensitive receptors.  This is an intrusive site investigation including factors such as chemical testing, quantitative risk assessment and a description of the sites ground conditions.  An updated Site Conceptual Model should be included showing all the potential pollutant linkages and an assessment of risk to identified receptors.","c) A Phase III (Remediation Strategy) Report if the Phase II Report confirms the presence of a significant pollutant linkage requiring remediation.  A detailed remediation scheme to bring the site to","a) If, during development, contamination not previously identified is found to be present at the site then no further development (unless otherwise agreed in writing with the local planning authority) shall be carried out until a remediation strategy detailing how this unsuspected contamination shall be dealt with has been submitted to and approved in writing by the local planning authority. The remediation strategy shall be implemented as approved.","b) Following completion of the remediation works as mentioned in (a) above, a 'Verification Report' must be submitted demonstrating that the works have been carried out satisfactorily and remediation targets have been achieved.","Reason: To ensure that any previously unidentified contamination found at the site is investigated and satisfactorily addressed in order to protect those engaged in construction and occupation of the development from potential contamination.","No works shall take place in relation to any of the development hereby approved until a Construction Method Statement to control the adverse impact of the development on the amenity of the public and nearby occupiers is submitted to and approved in writing by the Local Planning Authority.","The Construction Method statement shall include details of:","1.      The site access point(s) of all vehicles to the site during the construction    phase","2.      parking of vehicles of site personnel and visitors;","3.      storage of plant and materials;","4.      Wheel washing facilities.","5.      Measures to monitor and control the emission of dust and dirt during construction.","6.      measures for minimising the impact of noise and, if appropriate, vibration arising from construction activities;","7.      predicted noise and, if appropriate, vibration levels for construction using methodologies and at points agreed with the Local Planning Authority;","8.      a scheme for monitoring noise and,","Prior to the commencement of the development hereby approved, an Air Quality Neutral Assessment shall be submitted to and agreed by the Local Planning Authority regarding the .  The assessment must comply with London Air Quality Neutral guidance and updated guidance, at the time the report is submitted. The assessment shall detail;","·       Calculations of the predicted building emissions and comparison against the Building Emission Benchmarks;","·       Calculations of the predicted transport emissions and comparison against the Transport Emission Benchmarks;","·       Mitigation (if required) or contribution to off-setting the development's emissions, taking into account the most up to date Defra's damage costs and relevant guidance on offsetting payments.","The use hereby permitted shall not commence until all measures identified in the Air Quality Neutral Assessment have been shown to be implemented to the satisfaction of the Local Planning Authority in writing.","Reason:   To ensure t","Prior to the commencement of any development an assessment shall be undertaken of the impact of noise  emanating from the Rom Valley Retail park and other environmental sources  upon the development.","Reference should be made to the \"good\" standard to be found in the World Health Organisation Guidelines for Community Noise 1999 and BS8233:2014 Guidance on Sound Insulation and Noise Reduction for Buildings.  Reference should also be made to the Acoustics Ventilation & Overheating Residential Design Guide 2020.","Following this, a scheme detailing measures, which are to protect occupants from the environmental noise shall be submitted to and approved in writing by the Local Planning Authority.  It shall be implemented and validated prior to occupation.","Reason:  To protect residents against the impact of noise from the local environment.","Prior to the commencement of any demolition works on site, a detailed Dust Management Plan, shall be submitted to and agreed in writing by the Local Planning Authority setting out dust and emissions control measures to be employed on site, in accordance with the Institute of Air Quality Management Guidance on the assessment of dust from demolition and construction.","Reason: To reduce emissions from the demolition and construction of buildings and to comply with policy SI 1 of the London Plan.","Before the development hereby permitted commences at the site, an Arboricultural Method Statement and Tree Protection Plan in accordance with the requirements of BS 5837 (2012) 'Trees in Relation to Design, Demolition and Construction' for all the trees located 298-304 Beech Court Care Centre, South Street, Romford, RM1 2AJ shall be submitted to and approved in writing by the Local Planning Authority. The protection measures as approved shall be undertaken at the site before any work in connection with the development hereby permitted commences at the site, and shall be retained for the entire period of the duration of any work at the site, in connection with the development hereby permitted, within the fence or other means of enclosure surrounding the trees, no activities associated with building operations shall take place unless previously agreed in writing by the Local Planning Authority.","Reason: In order to maintain the existing vegetation at the site, which makes an important co","Notwithstanding the indicative details shown on the plans hereby approved, before first residential occupation of the development, a scheme soft landscaping shall be submitted to and agreed in writing by the Local Planning Authority and shall include the following.","A. Soft Landscaping scheme shall include:","a) Planting plan;","b) Written specifications (including cultivation and other operations associated with trees, plants and grass); and","c) Schedules of plants and trees, setting out the species, sizes, numbers/densities and soil depths.","The scheme shall also include a programme setting out how the plan will be put into practice including measures for protecting plants and trees both during and after development has finished.","The new planting shall be carried out in accordance with BS 8545 (2014) 'Trees: from nursery to independence in the landscape' in the first planting and/or seeding season following the first occupation of the residential buildings hereby permitted or the substanti","No demolition or development shall take place until a stage 1 written scheme of investigation (WSI) has been submitted to and approved by the local planning authority in writing. For land that is included within the WSI, no demolition or development shall take place other than in accordance with the agreed WSI, and the programme and methodology of site evaluation and the nomination of a competent person(s) or organisation to undertake the agreed Works.","If heritage assets of archaeological interest are identified by stage 1 then for those parts of the site which have archaeological interest a stage 2 WSI shall be submitted to and approved by the local planning authority in writing. For land that is included within the stage 2 WSI, no demolition/development shall take place other than in accordance with the agreed stage 2 WSI which shall include:","A. The statement of significance and research objectives, the programme and methodology of site investigation and recording and the nominatio","Prior to first occupation/the development hereby permitted coming into use, the new vehicle spaces (6no) shall be laid out to the satisfaction of the LPA and active vehicle charging facilities for electric or Ultra-Low Emission vehicles installed. The spaces shall then be retained permanently thereafter.","Reason: To ensure that car parking accommodation is made permanently available to the standards adopted by the Local Planning Authority in the interest of highway safety, and that the development accords with Policy 24 and  Policy T6.1 of the London Plan.","Any new or replacement hard surfaces hereby approved as part of the development (including any sub-base) shall be made of porous materials or provision shall be made to direct run-off water from the hard surface to a permeable or porous area or surface within the curtilage of the application site.","Reason: In order to ensure no water run-off from the hard surface which would contribute to risk of flooding.","Prior to commencement of the development hereby approved, a construction environmental management plan (CEMP: Biodiversity) shall be submitted to and approved in writing by the local planning authority.","The CEMP (Biodiversity) shall include the following.","a) Risk assessment of potentially damaging construction activities.","b) Identification of \"biodiversity protection zones\".","c) Practical measures (both physical measures and sensitive working practices) to avoid or reduce impacts during construction (may be provided as a set of method statements).","d) The location and timing of sensitive works to avoid harm to biodiversity features.","e) The times during construction when specialist ecologists need to be present on site to oversee works.","f) Responsible persons and lines of communication.","g) The role and responsibilities on site of an ecological clerk of works (ECoW) or similarly competent person.","h) Use of protective fences, exclusion barriers and warning signs.","The approved CEMP shall","Prior to any works above slab level, a Biodiversity Enhancement Strategy for protected, Priority and threatened species, prepared by a suitably qualified ecologist in line with the recommendations of the Preliminary Ecological Appraisal (Middlemarch, October 2025) shall be submitted to and approved in writing by the local planning authority.","The content of the Biodiversity Enhancement Strategy shall include the following:","a) Purpose and conservation objectives for the proposed enhancement measures;","b) detailed designs or product descriptions to achieve stated objectives;","c) locations of proposed enhancement measures by appropriate maps and plans (where relevant);","d) persons responsible for implementing the enhancement measures; and","e) details of initial aftercare and long-term maintenance (where relevant).","The works shall be implemented in accordance with the approved details shall be retained in that manner thereafter.\"","Reason: To enhance protected, Priority and threatened species","Prior to occupation, a lighting design strategy for biodiversity in accordance with Guidance Note 08/23 (Institute of Lighting Professionals) shall be submitted to and approved in writing by the local planning authority. The strategy shall:","a) identify those areas/features on site that are particularly sensitive for bats and that are likely to cause disturbance in or around their breeding sites and resting places or along important routes used to access key areas of their territory, for example, for foraging; and","b) show how and where external lighting will be installed (through provision of appropriate lighting contour plans and technical specifications) so that it can be clearly demonstrated that areas to be lit will not disturb or prevent the above species using their territory or having access to their breeding sites and resting places.","All external lighting shall be installed in accordance with the specifications and locations set out in the scheme and maintained thereafter in a","Statement Required by Article 35(2) of the Town and Country Planning (Development Management) Order 2015: No significant problems were identified during the consideration of the application, and therefore it has been determined in accordance with paragraph 38 of the National Planning Policy Framework.","The effect of paragraph 13 of Schedule 7A to the Town and Country Planning Act 1990 is that planning permission granted for the development of land in England is deemed to have been granted subject to the condition \"(the biodiversity gain condition\") that development may not begin unless:","(a) Biodiversity Gain Plan has been submitted to the planning authority, and","(b) the planning authority has approved the plan.","The planning authority, for the purposes of determining whether to approve a Biodiversity Gain Plan if one is required in respect of this permission would be the London Borough of Havering. There are statutory exemptions and transitional arrangements which mean that the biodiversity gain condition does not always apply. These are listed in paragraph 17 of Schedule 7A of the Town and Country Planning Act 1990 and the Biodiversity Gain Requirements (Exemptions) Regulations 2024.","Based on the information available this permission is considered to be one which will require the"],"actual_commencement_date":null,"pp_id":"14438121","decision_target_date":"24/03/2026","valid_date":"08/12/2025","lpa_app_no":"P1423.25","locality":null,"appeal_decision_date":null,"parking_details":{"no_proposed_bluebadge":2,"no_existing_car":6,"no_existing_bluebadge":2,"net_car":6,"no_proposed_car":12,"net_bluebadge":0},"decision_process":"Delegated","street_name":"Romford","last_synced":"2026-06-24T01:54:13.171Z","site_number":null,"centroid_easting":551620.0,"polygon":null,"ward":"St Albans","centroid_northing":187887.0,"application_type":"All Other","uprn":"100021397108","lapsed_date":"24/03/2029","actual_completion_date":null,"decision":"Approved","site_name":"298-304 Beech Court Care Centre, South Street","borough":"Havering","last_date_consultation_comments":"04/01/2026","application_type_full":"Full planning permission","url_planning_app":"http://development.havering.gov.uk/OcellaWeb/planningDetails?reference=P1423.25","decision_date":"24/03/2026","bo_system":"CSV Data Import","development_type":null,"appeal_status":null,"date_building_work_completed_under_previous_permission":null,"description":"Two storey extension to rear, including ground floor covered balconies to side and single storey porch to rear; roof extension to rear, new dormers to side of existing roof and alterations to fenestration. Construction of detached refuse store to rear, gazebo to side. Provision of additional car parking with extension of existing access road, hard and soft landscaping. Demolition of existing refuse store","appeal_decision":null,"date_building_work_started_under_previous_permission":null,"epc_number":"9189-3074-0132-0900-6901","last_updated":"2026-06-23T04:00:13.136Z","centroid":{"lon":0.186314,"lat":51.569473},"lpa_name":"Havering","secondary_street_name":null,"application_details":{"existing_uprns":null,"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"Entire Development","intended_commencement_date":"03/2026","intended_completion_date":"12/2026"}],"total_gia_gained":626,"site_area":0.27,"total_gia_existing":2003,"total_gia_lost":32,"scheme_name":"Beechcroft Care Home","existing_proposed_floorspace_details":[{"gia_existing":2003,"use_class":"C2","gia_gained":626,"gia_lost":32}],"projected_cost_of_works":"Up to £2m","scheme_phasing":true,"rain_water_harvesting":false,"grey_water_reuse":false,"green_suds":false,"surface_water_discharge_percentage_reduction":0,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":626,"total_non_resi_gross_internal_floor_area_to_be_lost":32,"total_gia_gained":626,"total_gia_existing":2003,"total_gia_lost":32},"garden_land_lost":false,"internal_resi_water_usage":0,"infrastructure_details":{"total_annual_pm_emissions":0,"green_roof_area":0,"no_resi_units_to_have_full_fibre":0,"no_new_water_connections_required":0,"no_homes_passive_cooling":0,"no_passive_fast_ev_charging_points":0,"no_non_resi_units_to_have_full_fibre":1,"total_annual_nox_emissions":0,"waste_provision":false,"percentage_demolition_construction_material_recycling":25,"no_active_fast_ev_charging_points":4,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":true,"no_new_gas_connections_required":0,"ghg_reduction_over_building_regulations":false,"waste_details":[{"external_dry_recycling":false,"external_food_waste":false,"unit_reference":"All","external_residual_waste":false,"reason_for_no_provision":"Building is a residential care home and as such all recycling facilities are centralised and accessible by staff members only. The home provides centralised internal and external waste and recycling storage.","internal_residual_waste":false,"internal_food_waste":false,"internal_dry_recycling":false}]},"other_residential_accommodation_details":{"other_resi_accommodation_unit_details":[{"no_rooms_proposed":14,"no_rooms_lost":0}]},"ownership_status":"Private"},"wgs84_polygon":null,"id":"Havering-P1423.25","reference_no_of_permission_being_relied_on":null,"title_number":null,"last_updated_by":"CSV Data Import"}