{"postcode":null,"status":"Approved","decision_agency":"Borough","subdivision_of_building":"n/a","appeal_start_date":null,"cil_liability":true,"decision_conditions":["The development hereby permitted shall be begun before the expiration of three years from the date of this permission.","REASON","To comply with Section 91 of the Town and Country Planning Act 1990.","The development hereby permitted shall be carried out in accordance with the following approved plans and details:","1682/S-101A","1682/P-101A","1682/P-102B","1682/P-103B","1682/P-104A","REASON","To ensure the development complies with the provisions of the Hillingdon Local Plan Part 1 (2012) and Part 2 (2020), and the London Plan (2021).","No works shall take place (including demolition, ground works, vegetation clearance) until a Construction Management Plan (CMP) has been submitted to and approved in writing by the local planning authority. The CMP shall detail:","· The phasing of development works.","· The hours during which development works will occur.","· Measures to prevent mud and dirt tracking onto footways and adjoining roads (including wheel washing facilities).","· Traffic management and access arrangements (vehicular and pedestrian) and parking provisions for contractors during the development process (including measures to reduce the numbers of construction vehicles accessing the site during peak hours).","· A dust risk assessment, including means to monitor and control dust, noise and vibrations, following the published guidance by The Institute of Air Quality Management (IAQM) on how to assess impacts of emissions of dust from demolition and construction sites. This must demonstrate compliance (drawn up accord","No works shall take place (including demolition, ground works, vegetation clearance) until a construction environmental management plan (CEMP) has been submitted to and approved in writing by the Local Planning Authority. The CEMP shall include details of the following:","· A timetable of works","· Storage of construction materials, chemicals, vehicles and equipment","· Dust suppression measures","· Waste storage and disposal measures","· Mitigation measures to minimise noise, visual and vibrational impacts","· Lighting measures to ensure boundary habitats are not luminated","· Any necessary measures to protect nearby ancient woodland.","The approved CEMP shall be adhered to and implemented throughout the construction period of the development.","REASON","To safeguard the environment and biodiversity during construction, including the protection of nearby ancient woodland and sensitive habitats, in accordance with Policy DMEI 7 of the Hillingdon Local Plan Part 2 (2020) and Policy G6 of the London Plan","No development shall take place on any part of the site until a Biodiversity Gain Plan for the site, demonstrating compliance with the 10% biodiversity net gain requirement in accordance with the Environment Act 2021, has been submitted to and approved in writing by the Local Planning Authority. The Biodiversity Gain Plan should:","i) Include a Baseline Biodiversity Assessment: Using the latest Defra Biodiversity Metric, a report of the site's pre-development biodiversity value","ii) Demonstrate how the development will achieve a minimum 10% biodiversity net gain, calculated in accordance with the latest version of the Defra Biodiversity Metric","iii) Provide confirmation of the purchase of off-site biodiversity units or statutory credits, including a receipt or proof of transaction as part of the Plan","iv) Confirm that the off-site habitat land has been secured for a minimum period of 30 years and registered (or will be registered) on the national Biodiversity Gain Site Register.","The ap","Trees, hedges and shrubs shown to be retained on the approved plan(s) shall be protected during construction in accordance with the recommendations detailed in the Arboricultural Impact Assessment (Reference: MW.2304.CSLH.SK02.AIA, Date: 11 June 2025, Mark Welby). Protective fencing shall be erected prior to commencement of development and retained for the duration of works.","REASON","To safeguard trees and ensure that the proposed development will preserve and enhance the visual amenities of the locality in compliance with policies DMHB 11 and DMHB 14 of the Hillingdon Local Plan Part 2 (2020) and Policies G5, G6 and G7 of the London Plan (2021).","No development above damp proof course shall take place until details of all materials and external surfaces have been submitted to and approved in writing by the Local Planning Authority. Thereafter the development shall be constructed in accordance with the approved details and be retained as such.","Details should include information relating to make, product/type, colour and photographs/images.","REASON","To ensure that the development presents a satisfactory appearance in accordance with Policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020).","Prior to development above slab level, details of existing and proposed site levels, including finished floor levels of both dwellings in relation to a fixed datum point and adjoining Bellevue Terrace, shall be submitted to and approved in writing by the Local Planning Authority.","The development shall thereafter be carried out in accordance with the approved levels and retained as such.","REASON","To safeguard the openness and visual amenity of the Green Belt and to ensure that the development relates satisfactorily to adjoining properties, in accordance with Policies DMEI 4 and DMHB 11 of the Hillingdon Local Plan Part 2 (2020), Policy G2 of the London Plan (2021) and Section 13 of the National Planning Policy Framework (2024).","No development above damp proof course shall take place until a landscape scheme has been submitted to and approved in writing by the Local Planning Authority. The scheme shall include: -","1.    Details of Soft Landscaping","1.a  Planting plans (at not less than a scale of 1:100)","1.b  Written specification of planting and cultivation works to be undertaken","1.c  Schedule of plants giving species, plant sizes, and proposed numbers/densities where appropriate.","2. Details of Hard Landscaping","2.a Refuse Storage","2.b Cycle Storage","2.c Means of enclosure/boundary treatments","2.d Car Parking Layouts","2.e Permeable Hard Surfacing Materials.","3. Details of Landscape Maintenance","3.a Landscape Maintenance Schedule for a minimum period of 5 years.","3.b Proposals for the replacement of any tree, shrub, or area of surfacing/seeding within the landscaping scheme which dies or in the opinion of the Local Planning Authority becomes seriously damaged or diseased.","4. Schedule for Implementation","Thereafter th","Prior to occupation of each dwelling hereby approved, details of electric vehicle charging infrastructure shall be submitted to and approved in writing by the Local Planning Authority. The details shall demonstrate that a minimum of one active electric vehicle charging point is provided per dwelling and that passive provision (including cabling and ducting) is installed for all remaining parking spaces to enable the future installation of active charging points.","The approved charging infrastructure shall be installed prior to first occupation of the respective dwelling and shall thereafter be retained and maintained for the lifetime of the development.","REASON","To ensure the development provides appropriate electric vehicle charging infrastructure to support the transition to a low-emission transport network, in accordance with Policies T6 and T6.1 of the London Plan (2021) and Policy DMT 6 of the Hillingdon Local Plan Part 2 (2020).","Trees, hedges and shrubs shown to be retained on the approved plan(s) shall not be damaged, uprooted, felled, lopped or topped without the prior written consent of the Local Planning Authority. If any retained tree, hedge or shrub is removed or severely damaged during (or after) construction, or is found to be seriously diseased or dying, another tree, hedge or shrub shall be planted at the same place. Or, if planting in the same place would leave the new tree, hedge or shrub susceptible to disease, then the planting should be in a position, and of a size and species to be first agreed in writing with the Local Planning Authority, and shall be planted in the first planting season following the completion of the development or the occupation of the buildings, whichever is the earlier.","Where damage is less severe, a schedule of remedial works necessary to ameliorate the effect of the damage, including tree surgery, soil amelioration or other arboricultural measures, shall be submitted t","No development above ground level shall take place until a scheme for the provision of sustainable water management and water efficiency has been submitted to and approved in writing by the Local Planning Authority. The scheme shall:","(i) provide information about the design storm period and intensity, the method employed to delay and control the surface water discharged from the site and the measures taken to prevent pollution of the receiving groundwater and/or surface waters;","(ii) include a timetable for its implementation; and","(iii) provide a management and maintenance plan for the lifetime of the development.","The scheme shall also demonstrate the use of methods to minimise the use of potable water through water collection, reuse and recycling and shall:","(i) provide details of water collection facilities to capture excess rainwater;","(ii) provide details of how rain and grey water will be recycled and reused in the development; and","(iii) provide details of how the dwelling will ach","Prior to works above damp proof course level, details of step-free access to all principal entrances shall be submitted to and approved in writing by the Local Planning Authority. The development shall be implemented in accordance with the approved details.","REASON","To ensure housing of an inclusive design is achieved and maintained in accordance with Policies D5 and D7 of the London Plan (2021).","The dwellings hereby approved shall accord with the requirements of Policy D7 of the London Plan and shall not be occupied until certification of compliance with the technical specifications for an M4(2) dwelling, as set out in Approved Document M to the Building Regulations (2010) 2015, has been submitted to, and approved in writing, by the Local Planning Authority. All such provisions must remain in place for the life of the building.","REASON:","To not only allow the Building Control body to require the development to comply with the optional Building Regulations standards, but to also ensure the appropriate quantity and standard of accessible and adaptable housing is constructed and maintained in accordance with Policy D7 of the London Plan (2021).","The dwellings hereby approved shall not be occupied until it has achieved an energy efficiency standard of a minimum 10% CO2 improvement over Building Regulations requirements Part L 2013 (TER Baseline).","REASON","To ensure the development contributes to reducing carbon emissions and supports the transition to a low-carbon future, in accordance with Policy SI 2 of the London Plan (2021) and Policy DMEI 2 of the Hillingdon Local Plan Part 2 (2020).","Prior to first use of the first floor terrace serving Unit 1, details of privacy screens to be installed along the eastern and western edges of the terrace (facing Unit 2 and Chandigrah) shall be submitted to and approved in writing by the Local Planning Authority. The screens shall be a minimum of 1.8m in height above finished terrace level and shall be constructed in obscure glazed or solid materials to prevent overlooking.","The approved privacy screens shall be installed prior to first use of the terrace and shall be permanently retained as such thereafter.","REASON","To prevent overlooking to adjoining properties in accordance with policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020).","All first floor windows in the east and west elevations of both Unit 1 and Unit 2, as shown on drawing nos. 1682/P-102B and 1682/P-103B, shall be fitted with obscure glazing to a minimum of Level 4 on the Pilkington scale (or equivalent) and shall be non-opening below 1.7m above finished internal floor level.","For the avoidance of doubt, this requirement includes the stairwell windows located on the west elevations of both Unit 1 and Unit 2 at mid-landing level between ground and first floor.","The windows shall be installed prior to occupation of the respective dwelling and shall be permanently retained as such thereafter.","REASON","To prevent overlooking to adjoining properties in accordance with policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020).","Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended), or any Order revoking or re-enacting that Order with or without modification, no development shall be carried out within the curtilage of the dwellings hereby approved under Schedule 2, Part 1, Classes A, AA, B, C, D, E and F, and Part 2, Class A, unless planning permission has first been obtained from the Local Planning Authority.","REASON","To ensure that the Local Planning Authority retains control over any future extensions, roof alterations, outbuildings, hardstanding, boundary treatments or other works that could harm the openness and visual amenity of the Green Belt, in accordance with Policy DMEI 4 of the Hillingdon Local Plan: Part 2 (2020), Policy G2 of the London Plan (2021), and the guidance within Section 13 of the National Planning Policy Framework (2024).","The decision to GRANT planning permission has been taken having regard to all relevant planning legislation, regulations, guidance, circulars and Council policies, including The Human Rights Act (1998) (HRA 1998) which makes it unlawful for the Council to act incompatibly with Convention rights, specifically Article 6 (right to a fair hearing); Article 8 (right to respect for private and family life); Article 1 of the First Protocol (protection of property) and Article 14 (prohibition of discrimination).","The decision to GRANT planning permission has been taken having regard to the policies and proposals in the Hillingdon Local Plan Part 1 (2012) and Part 2 (2020) set out below, including Supplementary Planning Guidance, and to all relevant material considerations, including The London Plan (2021) and NPPF (2024).","In dealing with the application the Council has implemented the requirement in the National Planning Policy Framework to work with the applicant in a positive and proactive way. We have made available detailed advice in the form of our statutory policies from Local Plan Part 1, Local Plan Part 2, Supplementary Planning Documents, Planning Briefs and other informal written guidance, as well as offering the opportunity to amend the scheme during the course of the application, in order to ensure that the applicant has been given every opportunity to submit an application which is likely to be considered favourably."],"actual_commencement_date":null,"pp_id":"14366905","decision_target_date":"06/03/2026","valid_date":"05/12/2025","lpa_app_no":"1131/APP/2025/3069","locality":null,"appeal_decision_date":null,"parking_details":{"no_existing_cycle":0.0,"no_existing_car":0.0,"net_car":4.0,"no_proposed_cycle":4.0,"no_proposed_car":4.0,"net_cycle":4.0},"decision_process":"Delegated","street_name":"SUMMERHOUSE LANE","last_synced":"2026-06-02T09:49:22.184Z","site_number":null,"centroid_easting":504311.0,"polygon":{"type":"geometrycollection"},"ward":"HARE/D VILLAGES 2022","centroid_northing":191456.0,"application_type":"All Other","uprn":null,"lapsed_date":"05/03/2029","actual_completion_date":null,"decision":"Approved","site_name":"CHANDIGRAH","borough":"Hillingdon","last_date_consultation_comments":"26/02/2026","application_type_full":"Full planning permission","url_planning_app":"http://planning.hillingdon.gov.uk/OcellaWeb/planningDetails?reference=1131/APP/2025/3069","decision_date":"05/03/2026","bo_system":"CSV Data Import","development_type":null,"appeal_status":null,"date_building_work_completed_under_previous_permission":null,"description":"Erection of 2 detached dwellings with associated access, parking, landscaping and boundary treatment works on land adjacent to Chandigrah (Amended Plans and Amended Description).","appeal_decision":null,"date_building_work_started_under_previous_permission":null,"epc_number":null,"last_updated":"2026-05-27T22:00:01.689Z","centroid":{"lon":-0.494932,"lat":51.612281},"lpa_name":"Hillingdon","secondary_street_name":"HAREFIELD","application_details":{"existing_uprns":[],"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"Enitire Development","intended_completion_date":"03/2027","intended_commencement_date":"03/2026"}],"total_gia_gained":403.0,"site_area":0.17,"total_gia_existing":0.0,"total_gia_lost":0.0,"existing_proposed_floorspace_details":[{"gia_existing":0.0,"use_class":"SG","gia_gained":403.0,"gia_lost":0.0}],"projected_cost_of_works":"Up to £2m","scheme_phasing":false,"rain_water_harvesting":false,"grey_water_reuse":false,"building_details":[{"no_storeys":2.0,"max_height":5.5,"building_ref":"Unit 1"},{"no_storeys":2.0,"max_height":5.5,"building_ref":"Unit 2"}],"green_suds":false,"surface_water_discharge_percentage_reduction":0.0,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":403.0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":403.0,"total_gia_existing":0.0,"total_gia_lost":0.0,"site_area":0.17},"garden_land_lost":false,"residential_details":{"total_no_proposed_residential_units_shared_equity":0,"total_no_proposed_bedrooms":8.0,"total_no_proposed_residential_units":2,"total_no_proposed_residential_units_london_living_rent":0,"total_no_proposed_residential_affordable_units":0,"total_no_proposed_residential_units_affordable_rent":0,"total_no_existing_residential_units":0,"total_no_proposed_residential_units_discount_market_sale":0,"total_no_proposed_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_existing_residential_units_london_living_rent":0,"total_no_existing_residential_units_shared_equity":0,"total_no_existing_residential_units_market_for_sale":0,"total_no_existing_residential_units_intermediate":0,"total_no_proposed_residential_units_market_for_rent":0,"total_no_existing_residential_units_social_rent":0,"total_no_proposed_residential_units_self_build_and_custom_build":0,"total_no_existing_residential_units_discount_market_rent":0,"total_no_proposed_residential_units_market_for_sale":2,"total_no_existing_residential_affordable_units":0,"total_no_existing_residential_units_affordable_rent":0,"habitable_rooms_density":82.3529411764706,"total_no_existing_residential_units_london_shared_ownership":0,"total_gia_gained":403.0,"total_no_proposed_residential_units_social_rent":0,"total_no_existing_residential_units_london_affordable_rent":0,"dwelling_density":11.76470588235294,"total_no_existing_residential_units_discount_market_sale":0,"total_no_proposed_residential_units_starter_homes":0,"total_no_proposed_residential_units_london_affordable_rent":0,"total_gia_lost":0.0,"total_no_existing_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_existing_residential_units_starter_homes":0,"total_no_proposed_residential_units_discount_market_rent":0,"total_no_proposed_residential_units_intermediate":0,"affordable_percentage":0.0,"total_no_proposed_residential_units_london_shared_ownership":0,"residential_units":[{"provider":"Private","no_habitable_rooms":7.0,"phase_detail":null,"unit_no":null,"description":null,"change_type":"Gain","unit_type":"House or Bungalow","no_bedrooms":4.0,"provision_for_older_persons":false,"unit_development_type":"New Build","tenure":"Market for sale","gia":209.0},{"provider":"Private","no_habitable_rooms":7.0,"phase_detail":null,"unit_no":null,"description":null,"change_type":"Gain","unit_type":"House or Bungalow","no_bedrooms":4.0,"provision_for_older_persons":false,"unit_development_type":"New Build","tenure":"Market for sale","gia":194.0}],"total_no_existing_residential_units_market_for_rent":0,"total_no_existing_residential_units_self_build_and_custom_build":0,"site_area":0.17},"internal_resi_water_usage":110.0,"infrastructure_details":{"total_annual_pm_emissions":0.0,"green_roof_area":206.4,"no_resi_units_to_have_full_fibre":2.0,"urban_greening_factor_score":0.42,"no_new_water_connections_required":2.0,"no_homes_passive_cooling":0.0,"no_passive_fast_ev_charging_points":0.0,"no_non_resi_units_to_have_full_fibre":0.0,"total_annual_nox_emissions":0.0,"waste_provision":false,"percentage_demolition_construction_material_recycling":10.0,"no_active_fast_ev_charging_points":2.0,"no_homes_to_have_electrical_heating":0.0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":2.0,"ghg_reduction_over_building_regulations":false},"ownership_status":"Private","s106_agreement":false,"viability_assessment":false,"air_quality_assessment":false,"mayoral_cil_liability_notice_issued":false,"circular_economy_statement":false,"commencement_notice_received":false,"other_residential_accommodation_details":{"site_area":0.17},"3d_model":false,"borough_cil_liability_notice_issued":false,"transport_impact_assessment":false},"wgs84_polygon":{"coordinates":[[[-0.49491,51.612294],[-0.494911,51.612267],[-0.494954,51.612268],[-0.494953,51.612295],[-0.49491,51.612294]]],"type":"Polygon"},"id":"Hillingdon-1131_APP_2025_3069","reference_no_of_permission_being_relied_on":null,"title_number":[],"last_updated_by":"CSV Data Import"}