{"url_planning_app":"http://planning.hillingdon.gov.uk/OcellaWeb/planningDetails?reference=13077/APP/2025/1907","centroid":{"lat":51.497609,"lon":-0.412085},"lapsed_date":"17/04/2029","decision_target_date":"17/04/2026","appeal_start_date":null,"decision_conditions":["The development hereby permitted shall be begun before the expiration of three years from the date of this permission.","REASON","To comply with Section 91 of the Town and Country Planning Act 1990.","The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers:","- 00-ST-01 P05","- 00-PR-EL-01 P05","- 00-PR-EL-02 P05","- 00-PR-FP-01 P05","- 00-PR-FP-02 P05","- 00-PR-SC-01 P01","and shall thereafter be retained/maintained for as long as the development remains in existence.","REASON","To ensure the development complies with the provisions of the Hillingdon Local Plan Part 1 (2012), Part 2 (2020) and the London Plan (2021).","Notwithstanding the approved plans, no development shall take place above slab level (except demolition) until a landscape scheme has been submitted to and approved in writing by the Local Planning Authority. The scheme shall include: -","1.    Details of Soft Landscaping","1.a  Planting plans (at not less than a scale of 1:100),","1.b  Written specification of planting and cultivation works to be undertaken,","1.c  Schedule of plants giving species, plant sizes, and proposed numbers/densities where appropriate","2. Details of Hard Landscaping","2.a Secure and Accessible Cycle Storage","2.b Means of enclosure/boundary treatments","2.c Car Parking Layouts (including the provision of 1 active 7kW electrical charging points)","2.d Car Parking allocation","2.e Hard Surfacing Materials","2.f Refuse storage","2.g External Lighting","3. Details of Landscape Maintenance","3.a Landscape Maintenance Schedule for a minimum period of 5 years.","3.b Proposals for the replacement of any tree, shrub, or area of surfing/seedin","Prior to first occupation of the new residential units, the fencing enclosing the private amenity spaces and the associated gates, as shown on the approved plans, shall be erected and thereafter permanently retained. Any new fencing should not be greater than 2metres in height.","REASON","To safeguard the privacy of adjoining residents in accordance with Policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020)","The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building and shall thereafter be retained as such.","REASON","To safeguard the visual amenities of the area and to ensure that the proposed development does not have an adverse effect upon the appearance of the existing building in accordance with Policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020).","Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (as amended) (or any order revoking and re-enacting that Order with or without modification), no additional windows, doors or other openings shall be constructed in the walls or roof slopes of the development hereby approved.","REASON","To prevent overlooking to adjoining properties in accordance with Policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020).","(i) No development shall take place above slab level (except demolition) until a scheme to deal with contamination has been submitted to and approved by the Local Planning Authority (LPA). All works which form part of any required remediation scheme shall be completed before any part of the development is occupied or brought into use unless the Local Planning Authority dispenses with any such requirement specifically and in writing. The scheme shall include the following measures unless the LPA dispenses with any such requirement specifically and in writing:","a) A desk-top study carried out by a competent person to characterise the site and provide information on the history of the site/surrounding area and to identify and evaluate all potential sources of contamination and impacts on land and water and all other identified receptors relevant to the site:","(b) A site investigation, including where relevant soil, soil gas, surface water, and groundwater sampling, together with the results","You are advised that if any part of the development hereby permitted encroaches by either its roof, walls, eaves, gutters, or foundations, then a new planning application may have to be submitted. The validity of this planning permission may be challengeable by third parties if the development results in any form of encroachment onto land outside the applicant's control for which the appropriate Notice under Article 13 of the Town and Country Planning (Development Management Procedure) (England) Order 2015 has not been served.","Nuisance from demolition and construction works is subject to control under The Control of Pollution Act 1974, the Clean Air Acts and other related legislation. In particular, you should ensure that the following are complied with:-","A. Demolition and construction works which are audible at the site boundary shall only be carried out between the hours of 08.00 and 18.00 hours Monday to Friday and between the hours of 08.00 hours and 13.00 hours on Saturday. No works shall be carried out on Sundays, Bank or Public Holidays.","B. All noise generated during such works shall be controlled in compliance with British Standard Code of Practice BS 5228:2009.","C. Dust emissions shall be controlled in compliance with the Mayor of London's Best Practice Guidance' The Control of dust and emissions from construction and demolition.","D. No bonfires that create dark smoke or nuisance to local residents.","You are advised to consult the Council's Environmental Protection Unit (www.hillingdon.gov.uk/nois","The Council will recover from the applicant the cost of highway and footway repairs, including damage to grass verges.","Care should be taken during the building works hereby approved to ensure no damage occurs to the verge or footpaths during construction. Vehicles delivering materials to this development shall not override or cause damage to the public footway. Any damage will require to be made good to the satisfaction of the Council and at the applicant's expense.","For further information and advice contact - Highways Maintenance Operations, Central Depot - Block K, Harlington Road Depot, 128 Harlington Road, Hillingdon, Middlesex, UB3 3EU (Tel: 01895 277524).","For Private Roads: Care should be taken during the building works hereby approved to ensure no damage occurs to the verge of footpaths on private roads during construction. Vehicles delivering materials to this development shall not override or cause damage to a private road and where possible alternative routes should be ta","The decision to GRANT planning permission has been taken having regard to all relevant planning legislation, regulations, guidance, circulars and Council policies, including The Human Rights Act (1998) (HRA 1998) which makes it unlawful for the Council to act incompatibly with Convention rights, specifically Article 6 (right to a fair hearing); Article 8 (right to respect for private and family life); Article 1 of the First Protocol (protection of property) and Article 14 (prohibition of discrimination).","The decision to GRANT planning permission has been taken having regard to the policies and proposals in the Hillingdon Local Plan Part 1 (2012) and Part 2 (2020) set out below, including Supplementary Planning Guidance, and to all relevant material considerations, including The London Plan (2021) and national guidance.","Under the terms of the Planning Act 2008 (as amended) and Community Infrastructure Levy Regulations 2010 (as amended), this development is liable to pay the London Borough of Hillingdon Community Infrastructure Levy (CIL) and the Mayor of London's Community Infrastructure Levy (CIL). This will be calculated in accordance with the London Borough of Hillingdon CIL Charging Schedule 2014 and the Mayor of London's CIL Charging Schedule 2012. Before commencement of works the development parties must notify the London Borough of Hillingdon of the commencement date for the construction works (by submitting a Commencement Notice) and assume liability to pay CIL (by submitting an Assumption of Liability Notice) to the Council at planning@hillingdon.gov.uk. The Council will then issue a Demand Notice setting out the date and the amount of CIL that is payable. Failure to submit a valid Assumption of Liability Notice and Commencement Notice prior to commencement of the development may result in su"],"appeal_decision_date":null,"bo_system":"CSV Data Import","secondary_street_name":null,"pp_id":"14172739","ward":"PINKWELL 2022","last_date_consultation_comments":"19/02/2026","application_type_full":"Full planning permission","date_building_work_completed_under_previous_permission":null,"uprn":null,"reference_no_of_permission_being_relied_on":null,"valid_date":"06/10/2025","decision":"Approved","application_type":"All Other","decision_agency":"Borough","locality":null,"last_synced":"2026-07-17T03:07:06.990Z","appeal_decision":null,"decision_date":"17/04/2026","cil_liability":true,"appeal_status":null,"development_type":null,"lpa_name":"Hillingdon","polygon":{"coordinates":[[[510311.05,178832.1],[510311.1,178831.85],[510312.45,178825.5],[510312.8,178824.2],[510313.2,178823.15],[510313.3,178822.95],[510313.85,178821.9],[510314.55,178820.85],[510315.4,178819.9],[510315.9,178819.45],[510316.9,178818.7],[510317.9,178818.05],[510319.05,178817.55],[510319.45,178817.4],[510320.65,178817.15],[510327.1,178815.85],[510328.9,178815.5],[510332.15,178814.85],[510332.1,178818.9],[510332.05,178821.35],[510331.932,178827.197],[510331.8,178834.9],[510327.852,178834.378],[510325.75,178834.1],[510324.458,178833.924],[510317.3,178832.95],[510311.05,178832.1]]],"type":"Polygon"},"actual_completion_date":null,"last_updated_by":"CSV Data Import","status":"Approved","wgs84_polygon":{"coordinates":[[[-0.41209,51.497668],[-0.412091,51.497641],[-0.412134,51.497642],[-0.412133,51.497669],[-0.41209,51.497668]]],"type":"Polygon"},"parking_details":{"no_existing_car":3,"net_car":0,"no_proposed_car":3},"centroid_easting":510324.0,"borough":"Hillingdon","actual_commencement_date":null,"epc_number":"0000-0000-0000-0000-0000","title_number":null,"postcode":null,"centroid_northing":178825.0,"site_number":1,"application_details":{"existing_uprns":null,"site_area":0.0319,"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"Completion","intended_completion_date":"03/2026","intended_commencement_date":"10/2025"}],"total_gia_gained":278,"total_gia_lost":0,"total_gia_existing":205.32,"existing_proposed_floorspace_details":[{"gia_existing":205.32,"use_class":"C3","gia_gained":278,"gia_lost":0}],"projected_cost_of_works":"Up to £2m","occupation_status":"Occupied","scheme_phasing":true,"rain_water_harvesting":false,"building_details":[{"no_storeys":2,"max_height":7.85,"building_ref":"Building 1 "}],"grey_water_reuse":false,"green_suds":true,"surface_water_discharge_percentage_reduction":0,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":278,"total_gia_lost":0,"total_gia_existing":205.32},"garden_land_lost":true,"infrastructure_details":{"total_annual_pm_emissions":0,"no_resi_units_to_have_full_fibre":1,"green_roof_area":0,"urban_greening_factor_score":0,"no_homes_passive_cooling":0,"no_new_water_connections_required":1,"no_passive_fast_ev_charging_points":3,"no_non_resi_units_to_have_full_fibre":1,"total_annual_nox_emissions":0,"waste_provision":true,"percentage_demolition_construction_material_recycling":0,"no_active_fast_ev_charging_points":1,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":1,"ghg_reduction_over_building_regulations":false},"internal_resi_water_usage":0,"ownership_status":"Public"},"site_name":"1 WATERSPLASH LANE","description":"Conversion of existing dwellinghouse and erection of two storey building to accommodate 4no. 2bedroom flats, including rear dormers and single storey rear extensions.","street_name":"HAYES","id":"Hillingdon-13077_APP_2025_1907","last_updated":"2026-07-16T22:00:02.238Z","decision_process":"Delegated","lpa_app_no":"13077/APP/2025/1907","date_building_work_started_under_previous_permission":null,"subdivision_of_building":null}