{"actual_commencement_date":null,"date_building_work_completed_under_previous_permission":null,"lpa_name":"Hillingdon","subdivision_of_building":null,"appeal_decision":null,"lapsed_date":"30/04/2029","appeal_decision_date":null,"last_updated_by":"CSV Data Import","reference_no_of_permission_being_relied_on":null,"epc_number":null,"last_updated":"2026-07-29T22:00:01.937Z","url_planning_app":"http://planning.hillingdon.gov.uk/OcellaWeb/planningDetails?reference=13301/APP/2026/589","street_name":"ICKENHAM","parking_details":null,"ward":"ICK/HAM & S HF/D 22","bo_system":"CSV Data Import","site_name":"19 HOYLAKE CRESCENT","site_number":19,"application_details":{"no_additional_bedrooms":0,"existing_uprns":null,"intended_commencement_date":"04/2026","intended_completion_date":"06/2026","total_gia_gained":5.9,"no_additional_bathrooms":0},"uprn":null,"locality":null,"date_building_work_started_under_previous_permission":null,"postcode":null,"valid_date":"06/03/2026","cil_liability":false,"actual_completion_date":null,"centroid":{"lat":51.567781,"lon":-0.449479},"centroid_easting":507563.0,"application_type_full":"Householder planning permission","pp_id":"14760422","lpa_app_no":"13301/APP/2026/589","polygon":{"geometries":[{"coordinates":[[[507562.876,186579.901],[507562.333,186579.871],[507543.1,186578.8],[507543.8,186566.85],[507566.55,186567.1],[507574.2,186567.15],[507582.5,186567.25],[507581.9,186580.6],[507573.1,186580.3],[507565.55,186580.05],[507562.876,186579.901]]],"type":"Polygon"}],"type":"GeometryCollection"},"id":"Hillingdon-13301_APP_2026_589","appeal_status":null,"appeal_start_date":null,"description":"Conversion of attached garage to habitable use, and replacement of existing 2 x rear dormers into 1 rear dormer","development_type":null,"decision_conditions":["The development hereby permitted shall be begun before the expiration of three years from the date of this permission.","REASON","To comply with Section 91 of the Town and Country Planning Act 1990.","The development hereby permitted shall not be carried out except in complete accordance with the details shown on Drawing Numbers:","LOCATION PLAN - VD-250 Drawing No. 006","PROPOSED BLOCK PLAN - VD-250 Drawing No. 005","PROPOSED ELEVATIONS - VD-250 Drawing No. 004","PROPOSED FLOORPLANS - VD-250 Drawing No. 003","and shall thereafter be retained/maintained for as long as the development remains in existence.","REASON","To ensure the development complies with the provisions of the Hillingdon Local Plan Part 1 (2012) and Part 2 (2020), and the London Plan (2021).","The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building and shall thereafter be retained as such.","REASON","To safeguard the visual amenities of the area and to ensure that the proposed development does not have an adverse effect upon the appearance of the existing building in accordance with Policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020)","On this decision notice policies from the Councils Local Plan: Part 1 - Strategic Policies appear first, then relevant Local Plan Part 2 (2020), then London Plan Policies (2021). Hillingdon's Full Council adopted the Hillingdon Local Plan: Part 1 - Strategic Policies on 8 November 2012 and the Hillingdon Local Plan Part 2 on 16 January 2020.","The Council will recover from the applicant the cost of highway and footway repairs, including damage to grass verges.","Care should be taken during the building works hereby approved to ensure no damage occurs to the verge or footpaths during construction. Vehicles delivering materials to this development shall not override or cause damage to the public footway. Any damage will require to be made good to the satisfaction of the Council and at the applicant's expense.","For further information and advice contact - Highways Maintenance Operations, Central Depot - Block K, Harlington Road Depot, 128 Harlington Road, Hillingdon, Middlesex, UB3 3EU (Tel: 01895 277524).","For Private Roads: Care should be taken during the building works hereby approved to ensure no damage occurs to the verge of footpaths on private roads during construction. Vehicles delivering materials to this development shall not override or cause damage to a private road and where possible alternative routes should be ta","Nuisance from demolition and construction works is subject to control under The Control of Pollution Act 1974, the Clean Air Acts and other related legislation. In particular, you should ensure that the following are complied with:-","A. Demolition and construction works which are audible at the site boundary shall only be carried out between the hours of 08.00 and 18.00 hours Monday to Friday and between the hours of 08.00 hours and 13.00 hours on Saturday. No works shall be carried out on Sundays, Bank or Public Holidays.","B. All noise generated during such works shall be controlled in compliance with British Standard Code of Practice BS 5228:2009.","C. Dust emissions shall be controlled in compliance with the Mayor of London's Best Practice Guidance' The Control of dust and emissions from construction and demolition.","D. No bonfires that create dark smoke or nuisance to local residents.","You are advised to consult the Council's Environmental Protection Unit (www.hillingdon.gov.uk/nois","The decision to GRANT planning permission has been taken having regard to all relevant planning legislation, regulations, guidance, circulars and Council policies, including The Human Rights Act (1998) (HRA 1998) which makes it unlawful for the Council to act incompatibly with Convention rights, specifically Article 6 (right to a fair hearing); Article 8 (right to respect for private and family life); Article 1 of the First Protocol (protection of property) and Article 14 (prohibition of discrimination).","The decision to GRANT planning permission has been taken having regard to the policies and proposals in the Hillingdon Local Plan Part 1 (2012) and Part 2 (2020) set out below, including Supplementary Planning Guidance, and to all relevant material considerations, including The London Plan - The Spatial Development Strategy for London consolidated with alterations since 2011 (2016) and national guidance."],"last_synced":"2026-07-30T03:17:07.851Z","secondary_street_name":null,"title_number":["unregistered"],"last_date_consultation_comments":"10/04/2026","decision_process":"Delegated","centroid_northing":186573.0,"borough":"Hillingdon","decision":"Approved","application_type":"Householder","wgs84_polygon":{"coordinates":[[[-0.449479,51.567843],[-0.449487,51.567843],[-0.449765,51.567837],[-0.449758,51.567729],[-0.44943,51.567727],[-0.44932,51.567726],[-0.4492,51.567726],[-0.449205,51.567846],[-0.449332,51.567845],[-0.449441,51.567844],[-0.449479,51.567843]]],"type":"Polygon"},"decision_agency":"Borough","decision_target_date":"01/05/2026","status":"Approved","decision_date":"30/04/2026"}