{"decision":"Approved","last_date_consultation_comments":"10/03/2026","wgs84_polygon":{"coordinates":[[[-0.463204,51.564486],[-0.463205,51.564459],[-0.463248,51.56446],[-0.463247,51.564487],[-0.463204,51.564486]]],"type":"Polygon"},"date_building_work_started_under_previous_permission":null,"ward":"ICK/HAM & S HF/D 22","site_number":212,"polygon":null,"appeal_status":null,"application_type_full":"Removal/Variation of a condition","borough":"Hillingdon","lpa_name":"Hillingdon","postcode":null,"appeal_start_date":null,"appeal_decision_date":null,"status":"Approved","valid_date":"11/02/2026","site_name":"212 SWAKELEYS ROAD","decision_date":"20/04/2026","pp_id":"14695816","actual_completion_date":null,"url_planning_app":"http://planning.hillingdon.gov.uk/OcellaWeb/planningDetails?reference=13583/APP/2026/360","application_details":{"existing_uprns":null},"development_type":null,"centroid_easting":506618.0,"decision_target_date":"20/04/2026","decision_agency":"Borough","actual_commencement_date":null,"lpa_app_no":"13583/APP/2026/360","decision_process":"Delegated","lapsed_date":"20/04/2029","uprn":null,"bo_system":"CSV Data Import","cil_liability":true,"street_name":"ICKENHAM","locality":null,"application_type":"All Other","epc_number":null,"decision_conditions":["The development hereby permitted shall be begun before the expiration of three years from the date of 03-06-25.","REASON","To comply with Section 91 of the Town and Country Planning Act 1990.","The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans;","A199 Rev P3 - Proposed (Amended) LG (Basement) Plan","A200 Rev P3 - Proposed (Amended) Site Plan","A201 Rev P3 - Proposed (Amended) GF Plan","A203 Rev P3 - Proposed (Amended) FF Plan","A204 Rev P3 - Proposed (Amended) Roof Plan","A300 Rev P3 - Proposed (Amended) East (Front) Elevation","A301 Rev P3 - Proposed (Amended) South (Side) Elevation","A302 Rev P3 - Proposed (Amended) North (Side) Elevation","A303 Rev P3 - Proposed (Amended) West (Rear) Elevation","REASON","To ensure the development complies with the provisions of the Hillingdon Local Plan Part 1 (2012) and Part 2 (2020), and the London Plan (2021).","Notwithstanding the submitted details, no development shall take place until details of all materials and external surfaces, have been submitted to and approved in writing by the Local Planning Authority. Thereafter the development shall be constructed in accordance with the approved details and be retained as such.","Details should include information relating to make, product/type, colour and photographs/images.","REASON","To ensure that the development presents a satisfactory appearance in accordance with Policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020).","Prior to development commencing, a demolition and construction management plan shall be submitted to and approved in writing by the Local Planning Authority. The plan shall detail:","(i) The phasing of development works","(ii) The hours during which development works will occur (please refer to informative I15 for maximum permitted working hours).","(iii)Measures to prevent mud and dirt tracking onto footways and adjoining roads (including wheel washing facilities).","(iv) Traffic management and access arrangements (vehicular and pedestrian) and parking provisions for contractors during the development process (including measures to reduce the numbers of construction vehicles accessing the site during peak hours).","(vi Measures to reduce the impact of the development on local air quality and dust through minimising emissions throughout the demolition and construction process.","(vii) The storage of demolition/construction materials on site.","The approved details shall be implemented and maintain","The development must be implemented and retained/maintained in accordance with the SUDS Operations and Maintenance Plan contained within 'Flood Risk Assessment & Drainage Strategy, John Davies Associations, 14/01/2025, C' details for as long as the development remains in existence.","REASON","To ensure the development does not increase the risk of flooding in accordance with Policies DMEI 9 and DMEI 10 of the Hillingdon Local Plan Part 2 (2020) and Policies S12 and 13 of the London Plan (2021).","The proposed development including construction of the new basement must be undertaken in accordance with the recommendations of Site Investigation Report, 11023/JW, Soil Consultants, 15th May 2025 of planning permission 13583/APP/2025/344.","REASON:","To ensure the development does not increase the risk of flooding or cause undue damage to neighbouring sites.","The approved landscape plan LC-2971-01 and planting plan LC-2971-02 shall be implemented prior to first occupation of the development and retained in perpetuity of planning permission 13583/APP/2025/344.","REASON","In order to encourage a wide diversity of wildlife on the existing semi-natural habitat of the site in accordance with policy DMEI 7 of the Hillingdon Local Plan Part 2 (2020) and London Plan Policy G5 (2021).","Trees, hedges and shrubs shown to be retained on the approved tree survey plan contained within 'Amended Arboricultural Impact Assessment and Method Statement, ref: CAS/2023/184, dated February 2025' shall not be damaged, uprooted, felled, lopped or topped without the prior written consent of the Local Planning Authority (LPA).  Any trees, hedges and shrubs severely damaged during construction, seriously diseased or dying shall be replaced by one of a size and species to be agreed in writing with the LPA.  Where damage is less severe, a schedule of remedial works necessary to ameliorate the effect of damage by tree surgery, feeding or ground work shall be agreed in writing with the LPA.  New planting should comply with BS 3936 'Nursery Stock, Part 1, Specification for Trees and Shrubs'.  Remedial work should be carried out to BS3998 (1989) 'Recommendations for Tree Work' and BS 4428 (1989) 'Code of Practice for General Landscape Operations (Excluding Hard Surfaces)'.  Such work or plan","The development hereby approved shall be carried out strictly in accordance with the recommendations contained within the approved 'Amended Arboricultural Impact Assessment and Method Statement, ref: CAS/2023/184, dated February 2025'.","Prior to the commencement of any site clearance or construction work, detailed drawings showing the position and type of fencing to protect the entire root areas/crown spread of trees, hedges and other vegetation to be retained shall be submitted to the Local Planning Authority for approval. No site clearance works or development shall be commenced until these drawings have been approved and the fencing has been erected in accordance with the details approved.  Unless otherwise agreed in writing by the Local Planning Authority. Such fencing should be a minimum height of 1.5 metres. The fencing shall be retained in position until development is completed. The area within the approved protective fencing shall remain undisturbed during the course of the","The development hereby approved shall be carried out strictly in accordance with the recommendations contained within Sections 3 & 4 of the approved 'Ecological Mitigation, Enhancement and Management Plan, dated 09/01/2025', and Section 4 of the approved 'Preliminary Ecological Appraisal and Preliminary Roost Assessment, dated 07/08/2024'.","REASON","In the interest of protected species in accordance with Policy DMEI 7 of the Hillingdon Local Plan Part 2 (2020).","Before development commences, plans and details of one electric vehicle charging points per dwelling, serving the development and capable of charging multiple vehicles simultaneously, shall be submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with these details and retained in perpetuity.","REASON","To be accordance with the published London Borough of Hillingdon Local Plan Part 2 Development Management Polices 2020 Parking Standards.","No part of the development hereby permitted shall be commenced until details of covered and secure cycle storage for 2 spaces have been submitted to and approved in writing by the Local Planning Authority. The facilities shall be provided in accordance with the approved details prior to the occupation of the development and thereafter permanently retained.","REASON","To ensure the provision and retention of facilities for cyclists to the development and hence the availability of sustainable forms of transport to the site in accordance with Policy AM9 of the Hillingdon Unitary Development Plan Saved Policies (September 2007) and Chapter 6 of the London Plan (2016).","The dwellings hereby approved shall accord with the requirements of Policy D7 of the London Plan, and shall not be occupied until certification of compliance with the technical specifications for an M4(2) dwelling, as set out in Approved Document M to the Building Regulations (2010) 2015, has been submitted to, and approved in writing, by the Local Planning Authority. All such provisions must remain in place for the life of the building.","REASON: To not only allow the Building Control body to require the development to comply with the optional Building Regulations standards, but to also ensure the appropriate quantity and standard of accessible and adaptable housing is constructed and maintained in accordance with policy D7 of the London Plan.","Prior to occupation of the development, details of a waste management plan shall be submitted to and approved in writing by the Local Planning Authority. The details shall include: -","- dedicated waste storage area","- detailed plan on how waste collection will take place on collection day and relevant collection points","- measures to ensure highways/laneways will not be disrupted","- details and mitigation measures that demonstrate minimum disturbances to adjoining streets and neighbours","REASON","In order to prevent any unnecessary disturbance to the local highways and to adjoining neighbours.","(i) The development shall not commence until a scheme to deal with contamination has been submitted to and approved by the Local Planning Authority (LPA). All works which form part of any required remediation scheme shall be completed before any part of the development is occupied or brought into use unless the Local Planning Authority dispenses with any such requirement specifically and in writing. The scheme shall include the following measures unless the LPA dispenses with any such requirement specifically and in writing:","(a) A written method statement providing details of the remediation scheme and how the completion of the remedial works will be verified shall be agreed in writing with the LPA prior to commencement, along with the details of a watching brief to address undiscovered contamination. No deviation shall be made from this scheme without the express agreement of the LPA prior to its implementation.","(ii) If during remedial or development works contamination not addresse","Notwithstanding the approved drawings, the vehicular access for the proposed car parking shall be provided with those parts of 2.4m x 2.4m pedestrian visibility splays which can be accommodated within the site in both directions and shall be maintained free of all obstacles to the visibility which shall not exceed a height of 0.6m above the level of the adjoining highway.","REASON","In the interests of highway and pedestrian safety in accordance with policy DMT 2 of the Hillingdon Local Plan Part 2 (2020).","Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 (or any order revoking and re-enacting that Order with or without modification), no extension to any dwellinghouse(s) nor any garage(s), shed(s) or other outbuilding(s) shall be erected without the grant of further specific permission from the Local Planning Authority.","REASON","So that the Local Planning Authority can ensure that any such development would not result in a significant loss of residential amenity in accordance with policy BE21 of the Hillingdon Unitary Development Plan Saved Policies (September 2007).","The Council will recover from the applicant the cost of highway and footway repairs, including damage to grass verges.","Care should be taken during the building works hereby approved to ensure no damage occurs to the verge or footpaths during construction. Vehicles delivering materials to this development shall not override or cause damage to the public footway. Any damage will require to be made good to the satisfaction of the Council and at the applicant's expense.","For further information and advice contact - Highways Maintenance Operations, Central Depot - Block K, Harlington Road Depot, 128 Harlington Road, Hillingdon, Middlesex, UB3 3EU (Tel: 01895 277524).","For Private Roads: Care should be taken during the building works hereby approved to ensure no damage occurs to the verge of footpaths on private roads during construction. Vehicles delivering materials to this development shall not override or cause damage to a private road and where possible alternative routes should be ta","Nuisance from demolition and construction works is subject to control under The Control of Pollution Act 1974, the Clean Air Acts and other related legislation. In particular, you should ensure that the following are complied with:-","A. Demolition and construction works which are audible at the site boundary shall only be carried out between the hours of 08.00 and 18.00 hours Monday to Friday and between the hours of 08.00 hours and 13.00 hours on Saturday. No works shall be carried out on Sundays, Bank or Public Holidays.","B. All noise generated during such works shall be controlled in compliance with British Standard Code of Practice BS 5228:2009.","C. Dust emissions shall be controlled in compliance with the Mayor of London's Best Practice Guidance' The Control of dust and emissions from construction and demolition.","D. No bonfires that create dark smoke or nuisance to local residents.","You are advised to consult the Council's Environmental Protection Unit (www.hillingdon.gov.uk/nois","On this decision notice policies from the Councils Local Plan: Part 1 - Strategic Policies appear first, then relevant Local Plan Part 2 (2020), then London Plan Policies (2016). Hillingdon's Full Council adopted the Hillingdon Local Plan: Part 1 - Strategic Policies on 8 November 2012 and the Hillingdon Local Plan Part 2 on 16 January 2020.","In dealing with the application the Council has implemented the requirement in the National Planning Policy Framework to work with the applicant in a positive and proactive way. We have made available detailed advice in the form of our statutory policies from Local Plan Part 1, Local Plan Part 2, Supplementary Planning Documents, Planning Briefs and other informal written guidance, as well as offering a full pre-application advice service, in order to ensure that the applicant has been given every opportunity to submit an application which is likely to be considered favourably.","Under the terms of the Planning Act 2008 (as amended) and Community Infrastructure Levy Regulations 2010 (as amended), this development is liable to pay the London Borough of Hillingdon Community Infrastructure Levy (CIL) and the Mayor of London's Community Infrastructure Levy (CIL). This will be calculated in accordance with the London Borough of Hillingdon CIL Charging Schedule 2014 and the Mayor of London's CIL Charging Schedule 2012. Before commencement of works the development parties must notify the London Borough of Hillingdon of the commencement date for the construction works (by submitting a Commencement Notice) and assume liability to pay CIL (by submitting an Assumption of Liability Notice) to the Council at planning@hillingdon.gov.uk. The Council will then issue a Demand Notice setting out the date and the amount of CIL that is payable. Failure to submit a valid Assumption of Liability Notice and Commencement Notice prior to commencement of the development may result in su","The decision to GRANT planning permission has been taken having regard to all relevant planning legislation, regulations, guidance, circulars and Council policies, including The Human Rights Act (1998) (HRA 1998) which makes it unlawful for the Council to act incompatibly with Convention rights, specifically Article 6 (right to a fair hearing); Article 8 (right to respect for private and family life); Article 1 of the First Protocol (protection of property) and Article 14 (prohibition of discrimination).","Nuisance from demolition and construction works is subject to control under The Control of Pollution Act 1974, the Clean Air Acts and other related legislation. In particular, you should ensure that the following are complied with:-","A. Demolition and construction works which are audible at the site boundary shall only be carried out between the hours of 08.00 and 18.00 hours Monday to Friday and between the hours of 08.00 hours and 13.00 hours on Saturday. No works shall be carried out on Sundays, Bank or Public Holidays.","B. All noise generated during such works shall be controlled in compliance with British Standard Code of Practice BS 5228:2009.","C. Dust emissions shall be controlled in compliance with the Mayor of London's Best Practice Guidance' The Control of dust and emissions from construction and demolition.","D. No bonfires that create dark smoke or nuisance to local residents.","You are advised to consult the Council's Environmental Protection Unit (www.hillingdon.gov.uk/nois"],"reference_no_of_permission_being_relied_on":null,"secondary_street_name":null,"centroid_northing":186185.0,"last_updated":"2026-07-19T22:00:02.070Z","centroid":{"lon":-0.463226,"lat":51.564473},"subdivision_of_building":null,"last_synced":"2026-07-20T02:21:02.019Z","last_updated_by":"CSV Data Import","title_number":null,"appeal_decision":null,"date_building_work_completed_under_previous_permission":null,"id":"Hillingdon-13583_APP_2026_360","parking_details":null,"description":"Variation of Condition 2 (Approved Plans) of planning permission ref. 13583/APP/2025/344, dated 03-06-2025 (Erection of new dwelling with associated parking and landscaping following demolition of the existing dwelling). The variation involve an increase in the width, height and alterations to the overall design"}