{"postcode":null,"status":"Approved","decision_agency":"Borough","subdivision_of_building":null,"appeal_start_date":null,"cil_liability":true,"decision_conditions":["The development hereby permitted shall be begun before the expiration of three years from the date of this permission.","REASON","To comply with Section 91 of the Town and Country Planning Act 1990","The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers:","2125-2D","2125-E1AB","and shall thereafter be retained/maintained for as long as the development remains in existence.","REASON","To ensure the development complies with the provisions of the Hillingdon Local Plan Part 1 (2012), Part 2 (2020) and the London Plan (2021).","The construction works of the development hereby approved shall be carried out in accordance with the tree protection measures detailed in the Arboricultural Method Statement by SJ Stephens Associates dated17-11-2025.","REASON","To ensure that trees and other vegetation can and will be retained on site and not damaged during construction work and to ensure that the development conforms with policy DMHB 14 of the Hillingdon Local Plan Part  2 (2020)","Trees, hedges and shrubs shown to be retained on the approved plan(s) shall not be damaged, uprooted, felled, lopped or topped without the prior written consent of the Local Planning Authority. If any retained tree, hedge or shrub is removed or severely damaged during (or after) construction, or is found to be seriously diseased or dying, another tree, hedge or shrub shall be planted at the same place or, if planting in the same place would leave the new tree, hedge or shrub susceptible to disease, then the planting should be in a position to be first agreed in writing with the Local Planning Authority and shall be of a size and species to be agreed in writing by the Local Planning Authority and shall be planted in the first planting season following the completion of the development or the occupation of the buildings, whichever is the earlier. Where damage is less severe, a schedule of remedial works necessary to ameliorate the effect of damage by tree surgery, feeding or groundwork s","Notwithstanding the details specified on the approved drawings, the first floor side elevation windows facing numbers 18 Kewferry Drive shall be glazed with permanently obscured glass to at least scale 4 on the Pilkington scale and be non-opening below a height of 1.8 metres taken from internal finished floor level for so long as the development remains in existence.","REASON","To prevent overlooking to adjoining properties in accordance with policies DMHB 11 of the Hillingdon Local Plan Part 2 (2020).","Access to the single storey flat roof serving the rear extension area as detailed on the drawings above shall be for maintenance or emergency purposes only and the flat roof shall not be used as a roof garden, terrace, balcony, patio or similar amenity area.","REASON","To prevent overlooking to adjoining properties in accordance with policy policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020).","Notwithstanding the provisions of the Town and Country Planning (General Permitted Development)(England)Order 2015 (or any order revoking and re-enacting that Order with or without modification), no additional windows, doors or other openings shall be constructed in the walls or roof slopes of the development hereby approved.","REASON","To prevent overlooking to adjoining properties in accordance with policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020).","In dealing with the application the Council has implemented the requirement in the National Planning Policy Framework to work with the applicant in a positive and proactive way. We have made available detailed advice in the form of our statutory policies from Local Plan Part 1, Local Plan Part 2, Supplementary Planning Documents, Planning Briefs and other informal written guidance, as well as offering a full pre-application advice service, in order to ensure that the applicant has been given every opportunity to submit an application which is likely to be considered favourably.","Under the terms of the Planning Act 2008 (as amended) and Community Infrastructure Levy Regulations 2010 (as amended), this development is liable to pay the London Borough of Hillingdon Community Infrastructure Levy (CIL) and the Mayor of London's Community Infrastructure Levy (CIL). This will be calculated in accordance with the London Borough of Hillingdon CIL Charging Schedule 2014 and the Mayor of London's CIL Charging Schedule 2012. Before commencement of works the development parties must notify the London Borough of Hillingdon of the commencement date for the construction works (by submitting a Commencement Notice) and assume liability to pay CIL (by submitting an Assumption of Liability Notice) to the Council at planning@hillingdon.gov.uk. The Council will then issue a Demand Notice setting out the date and the amount of CIL that is payable. Failure to submit a valid Assumption of Liability Notice and Commencement Notice prior to commencement of the development may result in su","The decision to GRANT planning permission has been taken having regard to all relevant planning legislation, regulations, guidance, circulars and Council policies, including The Human Rights Act (1998) (HRA 1998) which makes it unlawful for the Council to act incompatibly with Convention rights, specifically Article 6 (right to a fair hearing); Article 8 (right to respect for private and family life); Article 1 of the First Protocol (protection of property) and Article 14 (prohibition of discrimination).","The decision to GRANT planning permission has been taken having regard to the policies and proposals in the Hillingdon Local Plan Part 1 (2012) and Part 2 (2020) set out below, including Supplementary Planning Guidance, and to all relevant material considerations, including The London Plan - The Spatial Development Strategy for London consolidated with alterations since 2011 (2016) and national guidance.","Nuisance from demolition and construction works is subject to control under The Control of Pollution Act 1974, the Clean Air Acts and other related legislation. In particular, you should ensure that the following are complied with:-","A. Demolition and construction works which are audible at the site boundary shall only be carried out between the hours of 08.00 and 18.00 hours Monday to Friday and between the hours of 08.00 hours and 13.00 hours on Saturday. No works shall be carried out on Sundays, Bank or Public Holidays.","B. All noise generated during such works shall be controlled in compliance with British Standard Code of Practice BS 5228:2009.","C. Dust emissions shall be controlled in compliance with the Mayor of London's Best Practice Guidance' The Control of dust and emissions from construction and demolition.","D. No bonfires that create dark smoke or nuisance to local residents.","You are advised to consult the Council's Environmental Protection Unit (www.hillingdon.gov.uk/nois","The Council will recover from the applicant the cost of highway and footway repairs, including damage to grass verges.","Care should be taken during the building works hereby approved to ensure no damage occurs to the verge or footpaths during construction. Vehicles delivering materials to this development shall not override or cause damage to the public footway. Any damage will require to be made good to the satisfaction of the Council and at the applicant's expense.","For further information and advice contact - Highways Maintenance Operations, Central Depot - Block K, Harlington Road Depot, 128 Harlington Road, Hillingdon, Middlesex, UB3 3EU (Tel: 01895 277524).","For Private Roads: Care should be taken during the building works hereby approved to ensure no damage occurs to the verge of footpaths on private roads during construction. Vehicles delivering materials to this development shall not override or cause damage to a private road and where possible alternative routes should be ta"],"actual_commencement_date":null,"pp_id":"14521455","decision_target_date":"10/02/2026","valid_date":"28/11/2025","lpa_app_no":"1409/APP/2025/3004","locality":null,"appeal_decision_date":null,"parking_details":{"no_existing_car":5,"net_car":0,"no_proposed_car":5},"decision_process":"Delegated","street_name":"NORTHWOOD","last_synced":"2026-05-12T01:59:40.679Z","site_number":null,"centroid_easting":508270.0,"polygon":null,"ward":"NORTHWOOD 2022","centroid_northing":192112.0,"application_type":"Householder","uprn":null,"lapsed_date":"10/02/2029","actual_completion_date":null,"decision":"Approved","site_name":"16 KEWFERRY DRIVE","borough":"Hillingdon","last_date_consultation_comments":"28/12/2025","application_type_full":"Full planning permission","url_planning_app":"http://planning.hillingdon.gov.uk/OcellaWeb/planningDetails?reference=1409/APP/2025/3004","decision_date":"10/02/2026","bo_system":"CSV Data Import","development_type":null,"appeal_status":null,"date_building_work_completed_under_previous_permission":null,"description":"Erection of double storey extensions to the front, side and rear including balcony to rear, with new roof involving raising of the ridge line and creation of a crown roof.  Amendments to fenestrations including replacement of all windows and doors and installation of new entrance canopy to the front.","appeal_decision":null,"date_building_work_started_under_previous_permission":null,"epc_number":null,"last_updated":"2026-05-11T22:00:02.918Z","centroid":{"lon":-0.437576,"lat":51.61743},"lpa_name":"Hillingdon","secondary_street_name":null,"application_details":{"existing_uprns":null,"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"Entire development","intended_commencement_date":"05/2026","intended_completion_date":"05/2027"}],"total_gia_gained":230.17,"site_area":0.12,"total_gia_existing":219.46,"total_gia_lost":0,"existing_proposed_floorspace_details":[{"gia_existing":219.46,"use_class":"C3","gia_gained":230.17,"gia_lost":0}],"projected_cost_of_works":"Up to £2m","scheme_phasing":true,"rain_water_harvesting":false,"grey_water_reuse":false,"building_details":[{"no_storeys":2,"max_height":9,"building_ref":"Main dwelling house"}],"green_suds":true,"surface_water_discharge_percentage_reduction":0,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":230.17,"total_gia_existing":219.46,"total_gia_lost":0},"garden_land_lost":true,"internal_resi_water_usage":140,"infrastructure_details":{"total_annual_pm_emissions":0,"no_active_slow_ev_charging_points":2,"green_roof_area":0,"no_resi_units_to_have_full_fibre":1,"no_new_water_connections_required":0,"no_homes_passive_cooling":0,"no_passive_slow_ev_charging_points":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"waste_provision":true,"percentage_demolition_construction_material_recycling":10,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"ghg_reduction_over_building_regulations":true},"ownership_status":"Private"},"wgs84_polygon":null,"id":"Hillingdon-1409_APP_2025_3004","reference_no_of_permission_being_relied_on":null,"title_number":null,"last_updated_by":"CSV Data Import"}