{"application_details":null,"parking_details":null,"secondary_street_name":"UXBRIDGE","appeal_start_date":null,"lapsed_date":null,"actual_commencement_date":null,"last_updated_by":"CSV Data Import","cil_liability":false,"last_updated":"2026-11-16T23:00:02.278Z","street_name":"HIGH STREET","decision":"Withdrawn","epc_number":null,"decision_date":"22/09/2026","reference_no_of_permission_being_relied_on":null,"actual_completion_date":null,"url_planning_app":"http://planning.hillingdon.gov.uk/OcellaWeb/planningDetails?reference=14805/APP/2025/2848","date_building_work_started_under_previous_permission":null,"status":"Withdrawn","centroid":{"lon":-0.475892,"lat":51.544235},"appeal_status":null,"decision_target_date":"06/01/2026","lpa_app_no":"14805/APP/2025/2848","postcode":null,"application_type_full":"Listed building consent","uprn":null,"title_number":null,"decision_agency":"Borough","subdivision_of_building":null,"appeal_decision_date":null,"borough":"Hillingdon","centroid_northing":183916.0,"description":"Proposed landscaping works to Civic Centre forecourt including the removal and replanting of trees, the relocation of bollards, alterations to stepped access, installation of seating and planters, installation of hard surfacing to match existing and the redesign of the access podium located on the Eastern side of the Civic Centre to accommodate an accessibility ramp with associated railings. (Application for Listed Building Consent).(Revised description and drawings)","appeal_decision":null,"id":"Hillingdon-14805_APP_2025_2848","site_name":"CIVIC CENTRE","development_type":null,"pp_id":"14480645","lpa_name":"Hillingdon","wgs84_polygon":{"coordinates":[[[-0.476833,51.543478],[-0.476834,51.543451],[-0.476877,51.543452],[-0.476876,51.543479],[-0.476833,51.543478]]],"type":"Polygon"},"site_number":null,"last_date_consultation_comments":"06/02/2026","valid_date":"11/11/2025","application_type":"All Other","decision_conditions":null,"bo_system":"CSV Data Import","centroid_easting":505787.0,"locality":null,"ward":"UXBRIDGE 2022","polygon":null,"decision_process":null,"date_building_work_completed_under_previous_permission":null,"last_synced":"2026-11-17T02:16:53.515Z"}