{"postcode":null,"status":"Approved","decision_agency":"Borough","subdivision_of_building":null,"appeal_start_date":null,"cil_liability":false,"decision_conditions":["The development hereby permitted shall be completed in full accordance with the approved plans listed in Condition 2 within 3 months of the date of this permission. The development shall thereafter be retained and maintained in accordance with the approved plans for as long as the development remains in existence.","REASON","To ensure the timely completion of the development in accordance with the approved plans, to safeguard the character and appearance of the area and the amenities of neighbouring occupiers, and to ensure compliance with the Hillingdon Local Plan Parts 1 (November 2012) and 2 (January 2020) and the London Plan (2021).","The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers:","905UR-P-0001 - Site Location Plan","905UR-P-0002 - Block Plan","905UR-P-0100 - Existing Ground Floor Plan","905UR-P-0101 - Existing Roof Plan","905UR-P-0200 - Existing North Elevation","905UR-P-0201 - Existing East Elevation","905UR-P-0202 - Existing South Elevation","905UR-P-0203 - Existing West Elevation","905UR-P-0300 - Existing Section AA","905UR-P-0110 - Proposed Ground Floor Plan","905UR-P-0101 - Proposed Roof Plan","905UR-P-0200 - Proposed North Elevation","905UR-P-0201 - Proposed East Elevation","905UR-P-0202 - Proposed South Elevation","905UR-P-0203 - Proposed West Elevation","S04 - Steel Beam / Steel Column / Footing Connection Details","and shall thereafter be retained/maintained for as long as the development remains in existence.","REASON","To ensure the development complies with the provisions Hillingdon Local Plan Parts 1 (November 2012) and 2 (January 2020) an","Unless otherwise stated on the approved drawings, the materials to be used in the construction of the external surfaces of the development hereby permitted shall be as shown on the approved plans listed in Condition 2 and shall thereafter be retained as such.","REASON","To safeguard the visual amenities of the area and to ensure that the proposed development does not have an adverse effect upon the appearance of the existing building in accordance with Policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020).","The Equality Act 2010 aims to safeguard individuals accessing goods, facilities, and services from discrimination based on a 'protected characteristic', including disability. In accordance with the Act, service providers must enhance access to and within their premises, especially when reasonable adjustments are feasible and straightforward to implement. The Act mandates that service providers proactively identify and eliminate barriers hindering disabled people.","The decision to GRANT planning permission has been taken having regard to all relevant planning legislation, regulations, guidance, circulars and Council policies, including The Human Rights Act (1998) (HRA 1998) which makes it unlawful for the Council to act incompatibly with Convention rights, specifically Article 6 (right to a fair hearing); Article 8 (right to respect for private and family life); Article 1 of the First Protocol (protection of property) and Article 14 (prohibition of discrimination).","The decision to GRANT planning permission has been taken having regard to the policies and proposals in the Hillingdon Local Plan Part 1 (2012) and Part 2 (2020) set out below, including Supplementary Planning Guidance, and to all relevant material considerations, including The London Plan (2021) and national guidance.","Nuisance from demolition and construction works is subject to control under The Control of Pollution Act 1974, the Clean Air Acts and other related legislation. In particular, you should ensure that the following are complied with:-","A. Demolition and construction works which are audible at the site boundary shall only be carried out between the hours of 08.00 and 18.00 hours Monday to Friday and between the hours of 08.00 hours and 13.00 hours on Saturday. No works shall be carried out on Sundays, Bank or Public Holidays.","B. All noise generated during such works shall be controlled in compliance with British Standard Code of Practice BS 5228:2009.","C. Dust emissions shall be controlled in compliance with the Mayor of London's Best Practice Guidance' The Control of dust and emissions from construction and demolition.","D. No bonfires that create dark smoke or nuisance to local residents.","You are advised to consult the Council's Environmental Protection Unit (www.hillingdon.gov.uk/nois","The Council will recover from the applicant the cost of highway and footway repairs, including damage to grass verges.","Care should be taken during the building works hereby approved to ensure no damage occurs to the verge or footpaths during construction. Vehicles delivering materials to this development shall not override or cause damage to the public footway. Any damage will require to be made good to the satisfaction of the Council and at the applicant's expense.","For further information and advice contact - Highways Maintenance Operations, Central Depot - Block K, Harlington Road Depot, 128 Harlington Road, Hillingdon, Middlesex, UB3 3EU (Tel: 01895 277524).","For Private Roads: Care should be taken during the building works hereby approved to ensure no damage occurs to the verge of footpaths on private roads during construction. Vehicles delivering materials to this development shall not override or cause damage to a private road and where possible alternative routes should be ta","The Party Wall Act 1996 requires a building owner to notify, and obtain formal agreement from, any adjoining owner, where the building owner purposes to:","- carry out work to an existing party wall:","- build on the boundary with a neighbouring property;","- in some circumstances, carry out groundworks within 6 metres of an adjoining building.","Notification and agreements under this Act are the responsibility of the building owner and are quite separate from Building Regulations, or Planning Controls.  The Building Control Service will assume that an applicant has obtained any necessary agreements with the adjoining owner, and nothing said or implied by the Council should be taken as removing the necessity for the building owner to comply fully with the Party Wall Act.  Further information and advice is to be found in 'The Party Walls etc. Act - 1996 - Explanatory Booklet' published by the Department for Communities and Local Government."],"actual_commencement_date":null,"pp_id":"14566314","decision_target_date":"03/07/2026","valid_date":"22/12/2025","lpa_app_no":"16028/APP/2025/3216","locality":null,"appeal_decision_date":null,"parking_details":{"no_existing_car":0,"net_car":2,"no_proposed_car":2},"decision_process":"Delegated","street_name":"HILLINGDON","last_synced":"2026-09-29T02:45:16.144Z","site_number":null,"centroid_easting":508344.0,"polygon":null,"ward":"COLHAM & COWLEY","centroid_northing":182013.0,"application_type":"All Other","uprn":null,"lapsed_date":"30/06/2029","actual_completion_date":null,"decision":"Approved","site_name":"905 UXBRIDGE ROAD","borough":"Hillingdon","last_date_consultation_comments":"27/01/2026","application_type_full":"Full planning permission","url_planning_app":"http://planning.hillingdon.gov.uk/OcellaWeb/planningDetails?reference=16028/APP/2025/3216","decision_date":"30/06/2026","bo_system":"CSV Data Import","development_type":null,"appeal_status":null,"date_building_work_completed_under_previous_permission":null,"description":"Alterations to the existing building including erection of a new steel-framed roof structure, installation of external cladding, retention/rebuilding of sections of perimeter wall, and associated works.","appeal_decision":null,"date_building_work_started_under_previous_permission":"01/12/2025","epc_number":null,"last_updated":"2026-09-28T22:00:02.572Z","centroid":{"lon":-0.439618,"lat":51.526646},"lpa_name":"Hillingdon","secondary_street_name":null,"application_details":{"existing_uprns":null,"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"Phase1","intended_completion_date":"02/2026","intended_commencement_date":"12/2025"}],"total_gia_gained":0,"site_area":0.02,"total_gia_existing":200,"total_gia_lost":0,"existing_proposed_floorspace_details":[{"gia_existing":200,"gia_gained":0,"use_class":"B2","gia_lost":0}],"projected_cost_of_works":"Up to £2m","scheme_phasing":true,"rain_water_harvesting":false,"grey_water_reuse":false,"green_suds":false,"surface_water_discharge_percentage_reduction":0,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":0,"total_gia_existing":200,"total_gia_lost":0},"garden_land_lost":false,"internal_resi_water_usage":0,"infrastructure_details":{"total_annual_pm_emissions":0,"green_roof_area":0,"no_resi_units_to_have_full_fibre":0,"no_new_water_connections_required":0,"no_homes_passive_cooling":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"waste_provision":true,"percentage_demolition_construction_material_recycling":0,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"ghg_reduction_over_building_regulations":false},"ownership_status":"Private"},"wgs84_polygon":null,"id":"Hillingdon-16028_APP_2025_3216","reference_no_of_permission_being_relied_on":null,"title_number":null,"last_updated_by":"CSV Data Import"}