{"site_name":"395 SIPSON ROAD","site_number":395,"decision_process":"Delegated","subdivision_of_building":null,"decision_date":"03/07/2026","last_date_consultation_comments":"23/04/2026","street_name":"WEST DRAYTON","lpa_name":"Hillingdon","date_building_work_started_under_previous_permission":null,"last_updated_by":"CSV Data Import","postcode":"UB7 0HU","appeal_decision_date":null,"reference_no_of_permission_being_relied_on":null,"bo_system":"CSV Data Import","decision_conditions":["The development hereby permitted shall be begun before the expiration of three years from the date of this permission.","REASON","To comply with Section 91 of the Town and Country Planning Act 1990.","The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers","015/PL/210 - Rev B; 015/PL/211 - Rev B; 015/PL/212 - Rev A; 015/PL/213 - Rev A; 015/PL/214 - Rev A; 015/DC/258 - Rev A; 015/PL/217","and shall thereafter be retained/maintained for as long as the development remains in existence.","REASON","To ensure the development complies with the provisions Hillingdon Local Plan Parts 1 (November 2012) and 2 (January 2020) and the London Plan (2021).","The development hereby permitted shall not be occupied until the following has been completed in accordance with the specified supporting plans and/or documents:","CG/Z2 Planning, Design & Access Statement (including transport statement)","31382.NIA.01 - Rev. A Noise Impact Assessment Report - 08/03/2026","1747 Archaeological Impact Assessment - 24th February 2026","10583r1 Air Quality Assessment - 13th February 2026","RC / 20069 Land contamination assessment - Land Gas Investigation - 23rd February 2026","20069 Land contamination assessment - Geotechnical Report - 5th February 2026","25229/00 Energy Statement - 03rd February 2026","P26013-DGC-Z1-GF-REP-C-0001-P04 Surface Water Drainage Strategy & Maintenance Report - 11/03/2026","DEV250811-1338 Rev02 Arboricultural Appraisal Report - 21/01/2026","MWA TPP 02 Tree Survey Plan","DEV250811-1338 Tree Survey Schedule","26004 Construction Logistics Plan - 02 February 2026","Daylight/Sunlight Report 19th January 2026","Preliminary Ecological Appraisal & Biodiversity -","The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those stated on  \"015/PL/217 Proposed Materials\" and shall thereafter be retained as such.","REASON","To safeguard the visual amenities of the area and to ensure that the proposed development does not have an adverse effect upon the appearance of the existing building in accordance with Policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020)","Notwithstanding the approved plans, no development shall commence until details of secure and covered cycle parking facilities have been submitted to and approved in writing by the Local Planning Authority, in consultation with the Highway Authority.","The cycle parking shall be designed to be conveniently accessed from the public highway and shall be served by an access route with a minimum clear width of 1.2 metres.","The approved cycle parking facilities shall be provided prior to first occupation of the development and thereafter permanently retained for use.","REASON","To ensure the provision of safe, convenient and accessible cycle parking and to promote sustainable modes of transport, in accordance with London Plan Policy T5 and the London Cycling Design Standards, as implemented by the London Borough of Hillingdon.","No development shall take place until a landscape scheme has been submitted to and approved in writing by the Local Planning Authority. The scheme shall include: -","1. Details of Soft Landscaping","1.a Planting plans (at not less than a scale of 1:100),","1.b Written specification of planting and cultivation works to be undertaken,","1.c Schedule of plants giving species, plant sizes, and proposed numbers/densities where appropriate","2. Details of Hard Landscaping","2.a Refuse Storage","2.b Cycle Storage","2.c Means of enclosure/boundary treatments","2.d Car Parking Layouts","2.e Hard Surfacing Materials","2.f External Lighting","3. Details of Landscape Maintenance","3a Landscape Maintenance Schedule for a minimum period of 5 years.","3.b Proposals for the replacement of any tree, shrub, or area of surfing/seeding within the landscaping scheme which dies or in the opinion of the Local Planning Authority becomes seriously damaged or diseased.","4. Schedule for Implementation","Thereafter the development shall b","Prior to development commencing, the applicant shall submit a demolition and construction management plan to the Local Planning Authority for its approval.  The plan shall detail:","(i)  The phasing of development works","(ii) The hours during which development works will occur (please refer to informative I15 for maximum permitted working hours).","(iii) A programme to demonstrate that the most valuable or potentially contaminating materials and fittings can be removed safely and intact for later re-use or processing.","(iv)Measures to prevent mud and dirt tracking onto footways and adjoining roads (including wheel washing facilities).","(v) Traffic management and access arrangements (vehicular and pedestrian) and parking provisions for contractors during the development process (including measures to reduce the numbers of construction vehicles accessing the site during peak hours).","(vi) Measures to reduce the impact of the development on local air quality and dust through minimising emissions","(i) The development shall not commence until a scheme to deal with contamination has been submitted to and approved by the Local Planning Authority (LPA). All works which form part of any required remediation scheme shall be completed before any part of the development is occupied or brought into use unless the Local Planning Authority dispenses with any such requirement specifically and in writing. The scheme shall include the following measures unless the LPA dispenses with any such requirement specifically and in writing:","a) A desk-top study carried out by a competent person to characterise the site and provide information on the history of the site/surrounding area and to identify and evaluate all potential sources of contamination and impacts on land and water and all other identified receptors relevant to the site:","(b) A site investigation, including where relevant soil, soil gas, surface water, and groundwater sampling, together with the results of analysis and risk assessment","For the lifetime of the development hereby permitted the noise level shall not exceed: 30 dB LAeq 8 hrs between 2300 and 0700; and 35 dB LAeq 16 hrs between 0700 and 2300 measured inside any habitable room of any permitted dwelling whilst achieving acceptable internal living conditions with respect to ventilation and temperature.","REASON","To ensure that occupants of the permitted development would not be exposed to noise that would be likely to cause an adverse effect on their health and quality of life. Informative: This has regard to the guidance set out in 'Guidance on Sound Insulation and Noise Reduction for Buildings' British Standard Institution BS8233: 2014.","No demolition or development shall take place until a written scheme of investigation (WSI) has been submitted to and approved by the local planning authority in writing.  For land that is included within the WSI, no demolition or development shall take place other than in accordance with the agreed WSI, which shall include the statement of significance and research objectives, and","A.\tThe programme and methodology of site investigation and recording and the nomination of a competent person(s) or organisation to undertake the agreed works","B.\tWhere appropriate, details of a programme for delivering related positive public benefits","C.\tThe programme for post-investigation assessment and subsequent analysis, publication & dissemination and deposition of resulting material. This part of the condition shall not be discharged until these elements have been fulfilled in accordance with the programme set out in the WSI","REASON","To safeguard and properly record any archaeological remains on t","The dwellings hereby approved shall accord with the requirements of Policy D7 of the London Plan and shall not be occupied until certification of compliance with the technical specifications for an M4(2) dwelling, as set out in Approved Document M to the Building Regulations (2010) 2015, has been submitted to, and approved in writing, by the Local Planning Authority.  All such provisions must remain in place for the life of the building.","REASON:","To not only allow the Building Control body to require the development to comply with the optional Building Regulations standards, but to also ensure the appropriate quantity and standard of accessible and adaptable housing is constructed and maintained in accordance with policy D7 of the London Plan.","Notwithstanding the provisions of the Town and Country Planning (General Permitted Development)(England) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no additional windows, doors or other openings shall be constructed in the walls or roof slopes of the development hereby approved.","REASON","To prevent overlooking to adjoining properties in accordance with policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020).","The side windows facing north (No. 391 Sipson Road) and south (Nos. 12 and 13 Vincent Close) shall be glazed with permanently obscured glass to at least scale 4 on the Pilkington scale and be non-opening below a height of 1.8 metres taken from internal finished floor level for so long as the development remains in existence.","REASON","To prevent overlooking to adjoining properties in accordance with policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020).","Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 (or any order revoking and re-enacting that Order with or without modification), no extension to any dwellinghouse(s) nor any garage(s), shed(s) or other outbuilding(s) shall be erected without the grant of further specific permission from the Local Planning Authority.","REASON","So that the Local Planning Authority can ensure that any such development would not result in a significant loss of residential amenity in accordance with policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020)..","Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 (or any order revoking and re-enacting that Order with or without modification), no addition to or enlargement of the roof of any dwellinghouse shall be constructed without the grant of further specific permission from the Local Planning Authority.","REASON","To preserve the character and appearance of the development and protect the visual amenity of the area and to ensure that any additions to the roof are in accordance with policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020).","The effect of paragraph 13 of Schedule 7A to the Town and Country Planning Act 1990 is that planning permission granted for the development of land in England is deemed to have been granted subject to the condition \"(the biodiversity gain condition\") that development may not begin unless:","(a) a Biodiversity Gain Plan has been submitted to the planning authority, and","(b) the planning authority has approved the plan.","The planning authority, for the purposes of determining whether to approve a Biodiversity Gain Plan if one is required in respect of this permission would be the London Borough of Hillingdon.","There are statutory exemptions and transitional arrangements which mean that the biodiversity gain condition does not always apply. These are listed below.","Based on the information available this permission is considered to be one which will require the approval of a biodiversity gain plan before development is begun because none of the statutory exemptions or transitional arrangement","The decision to GRANT planning permission has been taken having regard to all relevant planning legislation, regulations, guidance, circulars and Council policies, including The Human Rights Act (1998) (HRA 1998) which makes it unlawful for the Council to act incompatibly with Convention rights, specifically Article 6 (right to a fair hearing); Article 8 (right to respect for private and family life); Article 1 of the First Protocol (protection of property) and Article 14 (prohibition of discrimination).","The decision to GRANT planning permission has been taken having regard to the policies and proposals in the Hillingdon Local Plan Part 1 (2012) and Part 2 (2020) set out below, including Supplementary Planning Guidance, and to all relevant material considerations, including The London Plan - The Spatial Development Strategy for London consolidated with alterations since 2011 (2016) and national guidance.","On this decision notice policies from the Councils Local Plan: Part 1 - Strategic Policies appear first, then relevant Local Plan Part 2 (2020), then London Plan Policies (2016). Hillingdon's Full Council adopted the Hillingdon Local Plan: Part 1 - Strategic Policies on 8 November 2012 and the Hillingdon Local Plan Part 2 on 16 January 2020.","You are advised that if any part of the development hereby permitted encroaches by either its roof, walls, eaves, gutters, or foundations, then the validity of this planning permission may be challengeable by third parties.","The Party Wall Act 1996 requires a building owner to notify, and obtain formal agreement from, any adjoining owner, where the building owner proposes to:","carry out work to an existing party wall;","build on the boundary with a neighbouring property;","in some circumstances, carry out groundworks within 6 metres of an adjoining building.","Notification and agreements under this Act are the responsibility of the building owner and are quite separate from Building Regulations, or Planning Controls. The Building Control Service will assume that an applicant has obtained any necessary agreements with the adjoining owner, and nothing said or implied by the Council should be taken as removing the necessity for the building owner to comply fully with the Party Wall Act. Further information and advice is to be found in \"the Party Walls etc. Act 1996 - explanatory booklet\" published by the ODPM, available free of charge from the Residents Services Reception Desk, Level 3, Civic Centre, Uxbridge, UB8 1","Nuisance from demolition and construction works is subject to control under The Control of Pollution Act 1974, the Clean Air Acts and other related legislation. In particular, you should ensure that the following are complied with:-","A. Demolition and construction works which are audible at the site boundary shall only be carried out between the hours of 08.00 and 18.00 hours Monday to Friday and between the hours of 08.00 hours and 13.00 hours on Saturday. No works shall be carried out on Sundays, Bank or Public Holidays.","B. All noise generated during such works shall be controlled in compliance with British Standard Code of Practice BS 5228:2009.","C. Dust emissions shall be controlled in compliance with the Mayor of London's Best Practice Guidance' The Control of dust and emissions from construction and demolition.","D. No bonfires that create dark smoke or nuisance to local residents.","You are advised to consult the Council's Environmental Protection Unit (www.hillingdon.gov.uk/nois","The Council will recover from the applicant the cost of highway and footway repairs, including damage to grass verges.","Care should be taken during the building works hereby approved to ensure no damage occurs to the verge or footpaths during construction. Vehicles delivering materials to this development shall not override or cause damage to the public footway. Any damage will require to be made good to the satisfaction of the Council and at the applicant's expense.","For further information and advice contact - Highways Maintenance Operations, Central Depot - Block K, Harlington Road Depot, 128 Harlington Road, Hillingdon, Middlesex, UB3 3EU (Tel: 01895 277524).","For Private Roads: Care should be taken during the building works hereby approved to ensure no damage occurs to the verge of footpaths on private roads during construction. Vehicles delivering materials to this development shall not override or cause damage to a private road and where possible alternative routes should be ta","The applicant is advised that the storage of materials associated with the construction of this development should be provided within the site on land which is not public highway, and the use of such areas must not interfere with the public highway.","It is an offence under section 137 of the Highways Act 1980 for any person, without lawful authority or excuse, in any way to wilfully obstruct the free passage along a highway or public right of way. If this development is likely to result in the public highway or public right of way network becoming routinely blocked (fully or partly) the applicant must contact the Highway Authority to obtain their permission and requirements before construction works commence.","It is an offence under section 148 of the Highways Act 1980 to deposit mud or other debris on the public highway, and section 149 of the same Act gives the Highway Authority powers to remove such material at the expense of the party responsible.  Therefore, best practical means shall be taken at all times to ensure that all vehicles leaving the site during construction of the development are in a condition such as not to emit dust or deposit mud, slurry or other debris on the highway.","Where works are required within the public highway to facilitate a new or amended vehicular access, the Highway Authority require the construction of such works to be undertaken to their satisfaction and specification, and by a contractor who is authorised to work in the public highway. If any of the works associated with the construction of the access affects or requires the removal and/or the relocation of any equipment, apparatus or structures (e.g. street name plates, bus stop signs or shelters, statutory authority equipment etc.) the applicant will be required to bear the cost of such removal or alteration. Before works commence the applicant will need to apply to the Highway Authority to obtain their permission, requirements and for the work to be carried out on the applicant's behalf.","The applicant is advised that the Highway Authority has powers under section 163 of the Highways Act 1980, to take appropriate steps where deemed necessary (serving notice to the occupier of premises adjoining a highway) to prevent water from the roof or other part of the premises falling upon persons using the highway, or to prevent so far as is reasonably practicable, surface water from the premises flowing on to, or over the footway of the highway.","The written scheme of investigation will need to be prepared and implemented by a suitably professionally accredited archaeological practice in accordance with Historic England's Guidelines for Archaeological Projects in Greater London. This condition is exempt from deemed discharge under schedule 6 of The Town and Country Planning (Development Management Procedure) (England) Order 2015."],"wgs84_polygon":{"coordinates":[[[-0.455974,51.488686],[-0.455975,51.488659],[-0.456018,51.48866],[-0.456017,51.488687],[-0.455974,51.488686]]],"type":"Polygon"},"centroid_easting":507322.0,"url_planning_app":"http://planning.hillingdon.gov.uk/OcellaWeb/planningDetails?reference=2221/APP/2026/674","appeal_decision":null,"date_building_work_completed_under_previous_permission":null,"actual_commencement_date":null,"cil_liability":true,"epc_number":null,"locality":null,"ward":"H/ROW VILLAGES 2022","appeal_start_date":null,"secondary_street_name":null,"centroid":{"lat":51.48874,"lon":-0.455633},"title_number":null,"decision_target_date":"03/07/2026","decision":"Approved","uprn":null,"application_type":"All Other","appeal_status":null,"polygon":null,"decision_agency":"Borough","actual_completion_date":null,"pp_id":"14717944","lpa_app_no":"2221/APP/2026/674","last_synced":"2026-10-02T02:33:32.683Z","centroid_northing":177774.0,"application_details":{"existing_uprns":null,"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"Phase 1","intended_completion_date":"12/2026","intended_commencement_date":"08/2026"}],"total_gia_gained":0,"site_area":0.07980000000000001,"total_gia_lost":0,"total_gia_existing":0,"projected_cost_of_works":"Up to £2m","occupation_status":"Vacant","scheme_phasing":true,"rain_water_harvesting":false,"building_details":[{"no_storeys":2,"max_height":8,"building_ref":"Units 1&2"}],"grey_water_reuse":false,"green_suds":true,"surface_water_discharge_percentage_reduction":92,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":0,"total_gia_lost":0,"total_gia_existing":0},"garden_land_lost":false,"residential_details":{"total_no_proposed_residential_units_shared_equity":0,"total_no_proposed_bedrooms":6,"total_no_proposed_residential_units":2,"total_no_proposed_residential_units_london_living_rent":0,"total_no_proposed_residential_affordable_units":0,"total_no_existing_residential_units":0,"total_no_proposed_residential_units_affordable_rent":0,"total_no_proposed_residential_units_discount_market_sale":0,"total_no_proposed_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_existing_residential_units_london_living_rent":0,"total_no_existing_residential_units_shared_equity":0,"total_no_existing_residential_units_market_for_sale":0,"total_no_existing_residential_units_intermediate":0,"total_no_proposed_residential_units_market_for_rent":0,"total_no_existing_residential_units_social_rent":0,"total_no_proposed_residential_units_self_build_and_custom_build":0,"total_no_existing_residential_units_discount_market_rent":0,"total_no_proposed_residential_units_market_for_sale":2,"total_no_existing_residential_affordable_units":0,"total_no_existing_residential_units_affordable_rent":0,"habitable_rooms_density":null,"total_no_existing_residential_units_london_shared_ownership":0,"total_gia_gained":180,"total_no_proposed_residential_units_social_rent":0,"total_no_existing_residential_units_london_affordable_rent":0,"dwelling_density":0,"total_no_proposed_residential_units_london_affordable_rent":0,"total_no_existing_residential_units_discount_market_sale":0,"total_no_proposed_residential_units_starter_homes":0,"total_no_existing_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_existing_residential_units_starter_homes":0,"total_no_proposed_residential_units_discount_market_rent":0,"total_no_proposed_residential_units_intermediate":0,"affordable_percentage":0.0,"total_no_proposed_residential_units_london_shared_ownership":0,"residential_units":[{"no_habitable_rooms":4,"provider":"Private","change_type":"Gain","no_bedrooms":3,"unit_type":"Semi Detached Home","gia":90,"tenure":"Market for sale"},{"no_habitable_rooms":4,"provider":"Private","change_type":"Gain","no_bedrooms":3,"unit_type":"Semi Detached Home","gia":90,"tenure":"Market for sale"}],"total_no_existing_residential_units_market_for_rent":0,"total_no_existing_residential_units_self_build_and_custom_build":0,"total_gia_lost":0},"infrastructure_details":{"total_annual_pm_emissions":0,"no_resi_units_to_have_full_fibre":2,"green_roof_area":0,"urban_greening_factor_score":0,"solar_pv_capacity":0,"no_homes_passive_cooling":0,"no_new_water_connections_required":2,"no_passive_fast_ev_charging_points":3,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0.2,"waste_provision":true,"percentage_demolition_construction_material_recycling":0,"no_active_fast_ev_charging_points":1,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":2,"ghg_reduction_over_building_regulations":false},"internal_resi_water_usage":105,"ownership_status":"Private"},"status":"Approved","parking_details":{"no_existing_car":20,"net_car":-16,"no_proposed_car":4},"description":"Erection of 2no. semi-detached dwellinghouses on former car park, with associated landscaping, PV solar panels and car parking.","lapsed_date":"03/07/2029","application_type_full":"Full planning permission","borough":"Hillingdon","last_updated":"2026-10-01T22:00:03.764Z","development_type":null,"id":"Hillingdon-2221_APP_2026_674","valid_date":"23/03/2026"}