{"site_name":"8 WARREN ROAD","site_number":8,"decision_process":"Delegated","subdivision_of_building":null,"decision_date":"12/05/2026","last_date_consultation_comments":"08/05/2026","street_name":"ICKENHAM","lpa_name":"Hillingdon","date_building_work_started_under_previous_permission":null,"last_updated_by":"CSV Data Import","postcode":null,"appeal_decision_date":null,"reference_no_of_permission_being_relied_on":null,"bo_system":"CSV Data Import","decision_conditions":["AMENDED CONDITION","The development hereby permitted shall be begun before 20 August 2028 which is three years from the date of the planning permission ref. 23271/APP/2025/1515.","REASON","To comply with Section 91 of the Town and Country Planning Act 1990","AMENDED CONDITION","The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers:","23/3569/51 - Rev C","23/3569/54 - Rev C","23/3569/55 - Rev B","and shall thereafter be retained/maintained for as long as the development remains in existence.","REASON","To ensure the development complies with the provisions of the Hillingdon Local Plan Part 1 (2012), Part 2 (2020) and the London Plan (2021).","The materials and external surfaces shall be constructed in accordance with the details shown on schedule titled 'Material Schedule'. Thereafter the development shall be constructed in accordance with the approved details and be retained as such.","REASON","To ensure that the development presents a satisfactory appearance in accordance with Policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020).","The one active electric vehicle charging points as indicated on the approved plans shall be implemented and brought into operation prior to first occupation. The remaining parking space shall be installed with passive electric vehicle charging provision prior to first occupation. Thereafter the electric vehicle charging points shall be permanently retained and available for use for the lifetime of the development.","REASON","To ensure construction of a satisfactory development and to promote sustainable development in accordance with Policy DMT6 of the Hillingdon Local Plan Part 2 (2020) and Policy T6.1 of the London Plan (2021).","No site clearance or construction work shall take place until the details have been submitted to, and approved in writing by, the Local Planning Authority with respect to:","1. A method statement outlining the sequence of development on the site including demolition, building works and tree protection measures.","2. Detailed drawings showing the position and type of fencing to protect the entire root areas/crown spread of trees, hedges and other vegetation to be retained shall be submitted to the Local Planning Authority for approval. No site clearance works or development shall be commenced until these drawings have been approved and the fencing has been erected in accordance with the details approved. Unless otherwise agreed in writing by the Local Planning Authority. Such fencing should be a minimum height of 1.5 metres.","Thereafter, the development shall be implemented in accordance with the approved details.","The fencing shall be retained in position until development is completed.","Notwithstanding the approved details and prior to any works on site above damp proof course level, a landscape scheme shall","be submitted to and approved in writing by the Local Planning Authority. The scheme shall include: -","1. Details of Soft Landscaping","1.a Planting plans (at not less than a scale of 1:100),","1.b Written specification of planting and cultivation works to be undertaken,","1.c Schedule of plants giving species, plant sizes, and proposed numbers/densities where appropriate","2. Details of Hard Landscaping","2.a Means of enclosure/boundary treatments","2.b Details of secured and covered cycles stand for at least two bicycles (noted it is to be provided within garage)","2.c Hard Surfacing Materials","3. Details of Landscape Maintenance","3.a Landscape Maintenance Schedule for a minimum period of 5 years.","3.b Proposals for the replacement of any tree, shrub, or area of surfing/seeding within the landscaping scheme which dies or in the opinion of the Local Planning Authority becomes s","No development shall take place on any part of the site until a Biodiversity Gain Plan for the site, demonstrating compliance with the 10% biodiversity net gain requirement in accordance with the Environment Act 2021, has been submitted to and approved in writing by the Local Planning Authority. The Biodiversity Gain Plan should include:","i. Baseline Biodiversity Assessment: Using the latest Defra Biodiversity Metric, a report of the site's pre-development biodiversity value; and","ii.On-Site Enhancement and 30-year Habitat Management Plan (HMP) detailing measures to achieve BNG on-site, including species protection, habitat creation, and ongoing management strategies to maintain gains for a minimum of 30 years. The HMP should, as a minimum, include:","a) Description and evaluation of the features to be managed.","b) Aims, objectives and targets for management.","c) Description of the management operations necessary to achieving aims and objectives.","d) Prescriptions for management actions.","e)","Access to the flat roof hereby approved shall be for maintenance or emergency purposes only and the flat roof shall not be used as a roof garden, terrace, balcony, patio or similar amenity area.","REASON","To prevent overlooking to adjoining properties in accordance with policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020).","Prior to development commencing, the applicant shall submit a demolition and construction management plan to the Local Planning Authority for its approval.  The plan shall detail:","(i)  The phasing of development works","(ii) The hours during which development works will occur (please refer to informative I15 for maximum permitted working hours).","(iii) A programme to demonstrate that the most valuable or potentially contaminating materials and fittings can be removed safely and intact for later re-use or processing.","(iv)Measures to prevent mud and dirt tracking onto footways and adjoining roads (including wheel washing facilities).","(v) Traffic management and access arrangements (vehicular and pedestrian) and parking provisions for contractors during the development process (including measures to reduce the numbers of construction vehicles accessing the site during peak hours).","(vi) Measures to reduce the impact of the development on local air quality and dust through minimising emissions","No development approved by this permission shall be commenced until a scheme for the provision of sustainable water management has been submitted to and approved in writing by the Local Planning Authority.  The scheme shall clearly demonstrate that sustainable drainage systems (SUDS) have been incorporated into the designs of the development and will:","i. Information about the design storm period and intensity, the method employed to delay and control the surface water discharged from the site and the measures taken to prevent pollution of the receiving groundwater and/or surface waters;","ii. A timetable for its implementation; and","iii. Provide a management and maintenance plan for the lifetime of the development which shall include the arrangements for adoption by any public authority or statutory undertaker and any other arrangements to secure the operation of the scheme throughout its lifetime.","The scheme should also demonstrate the use of methods to minimise the use of potable wa","Prior to works commencing, details of step free access via the principal private entrance shall be submitted to, and approved in writing, by the Local Planning Authority. Such provision shall remain in place for the life of the building.","REASON","To ensure that the dwelling is of an inclusive and accessible design in accordance with Policies D5 and D7 of the London Plan (2021).","The dwelling hereby approved shall be constructed to meet the standards for a Category 2 M4(2) dwelling, as set out in Approved Document M to the Building Regulations (2010) 2015, and all such provisions shall remain in place for the life of the building.","REASON","To ensure that the dwelling is of an inclusive and accessible design in accordance with Policies D5 and D7 of the London Plan (2021).","Notwithstanding the provisions of the Town and Country Planning (General Permitted Development)(England) Order 2015 (or any order revoking and re-enacting that Order with or without modification); no garage(s), shed(s) or other outbuilding(s), nor extension or roof alteration to any dwellinghouse(s) shall be erected without the grant of further specific permission from the Local Planning Authority.","REASON","To protect the character and appearance of the area and amenity of residential occupiers in accordance with policies DMHB 11 and DMHD 2 of the Hillingdon Local Plan Part 2 (2020).","Notwithstanding the provisions of the Town and Country Planning (General Permitted Development)(England)Order 2015 (or any order revoking and re-enacting that Order with or without modification), no additional windows, doors or other openings shall be constructed in the walls or roof slopes of the development hereby approved.","REASON","To prevent overlooking to adjoining properties in accordance with policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020).","The proposed first floor flank elevation windows facing Nos. 6 and 10 Warren Road shall be glazed with permanently obscured glass to at least scale 4 on the Pilkington scale and be non-opening below a height of 1.8 metres taken from internal finished floor level for so long as the development remains in existence.","REASON","To prevent overlooking to adjoining properties in accordance with Policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020).","The height of the front boundary wall adjoining the highway shall be maintained at a height no greater than 0.6m to ensure that pedestrian visibility is maintained for vehicles entering and exiting the site.","REASON","In the interests of highway and pedestrian safety in accordance with policy DMT 2 of the Hillingdon Local Plan Part 2 (2020).","The decision to GRANT planning permission has been taken having regard to all relevant planning legislation, regulations, guidance, circulars and Council policies, including The Human Rights Act (1998) (HRA 1998) which makes it unlawful for the Council to act incompatibly with Convention rights, specifically Article 6 (right to a fair hearing); Article 8 (right to respect for private and family life); Article 1 of the First Protocol (protection of property) and Article 14 (prohibition of discrimination).","The decision to GRANT planning permission has been taken having regard to the policies and proposals in the Hillingdon Local Plan Part 1 (2012) and Part 2 (2020) set out below, including Supplementary Planning Guidance, and to all relevant material considerations, including The London Plan 2021 and national guidance.","In dealing with the application the Council has implemented the requirement in the National Planning Policy Framework to work with the applicant in a positive and proactive way. We have made available detailed advice in the form of our statutory policies from Local Plan Part 1, Local Plan Part 2, Supplementary Planning Documents, Planning Briefs and other informal written guidance, as well as offering a full pre-application advice service, in order to ensure that the applicant has been given every opportunity to submit an application which is likely to be considered favourably.","Under the terms of the Planning Act 2008 (as amended) and Community Infrastructure Levy Regulations 2010 (as amended), this development is liable to pay the London Borough of Hillingdon Community Infrastructure Levy (CIL) and the Mayor of London's Community Infrastructure Levy (CIL). This will be calculated in accordance with the London Borough of Hillingdon CIL Charging Schedule 2014 and the Mayor of London's CIL Charging Schedule 2012. Before commencement of works the development parties must notify the London Borough of Hillingdon of the commencement date for the construction works (by submitting a Commencement Notice) and assume liability to pay CIL (by submitting an Assumption of Liability Notice) to the Council at planning@hillingdon.gov.uk. The Council will then issue a Demand Notice setting out the date and the amount of CIL that is payable. Failure to submit a valid Assumption of Liability Notice and Commencement Notice prior to commencement of the development may result in su","Nuisance from demolition and construction works is subject to control under The Control of Pollution Act 1974, the Clean Air Acts and other related legislation. In particular, you should ensure that the following are complied with:-","A. Demolition and construction works which are audible at the site boundary shall only be carried out between the hours of 08.00 and 18.00 hours Monday to Friday and between the hours of 08.00 hours and 13.00 hours on Saturday. No works shall be carried out on Sundays, Bank or Public Holidays.","B. All noise generated during such works shall be controlled in compliance with British Standard Code of Practice BS 5228:2009.","C. Dust emissions shall be controlled in compliance with the Mayor of London's Best Practice Guidance' The Control of dust and emissions from construction and demolition.","D. No bonfires that create dark smoke or nuisance to local residents.","You are advised to consult the Council's Environmental Protection Unit (www.hillingdon.gov.uk/nois","You are advised that if any part of the development hereby permitted encroaches by either its roof, walls, eaves, gutters, or foundations, then a new planning application may have to be submitted. The validity of this planning permission may be challengeable by third parties if the development results in any form of encroachment onto land outside the applicant's control for which the appropriate Notice under Article 13 of the Town and Country Planning (Development Management Procedure) (England) Order 2015 has not been served.","Your attention is drawn to the fact that the planning permission does not override property rights and any ancient rights of light that may exist. This permission does not empower you to enter onto land not in your ownership without the specific consent of the owner. If you require further information or advice, you should consult a solicitor.","The Council will recover from the applicant the cost of highway and footway repairs, including damage to grass verges.","Care should be taken during the building works hereby approved to ensure no damage occurs to the verge or footpaths during construction. Vehicles delivering materials to this development shall not override or cause damage to the public footway. Any damage will require to be made good to the satisfaction of the Council and at the applicant's expense.","For further information and advice contact - Highways Maintenance Operations, Central Depot - Block K, Harlington Road Depot, 128 Harlington Road, Hillingdon, Middlesex, UB3 3EU (Tel: 01895 277524).","For Private Roads: Care should be taken during the building works hereby approved to ensure no damage occurs to the verge of footpaths on private roads during construction. Vehicles delivering materials to this development shall not override or cause damage to a private road and where possible alternative routes should be ta","The effect of paragraph 13 of Schedule 7A to the Town and Country Planning Act 1990 is that planning permission granted for the development of land in England is deemed to have been granted subject to the condition \"(the biodiversity gain condition\") that development may not begin unless:","(a) a Biodiversity Gain Plan has been submitted to the planning authority, and","(b) the planning authority has approved the plan.","The planning authority, for the purposes of determining whether to approve a Biodiversity Gain Plan if one is required in respect of this permission would be the London Borough of Hillingdon.","There are statutory exemptions and transitional arrangements which mean that the biodiversity gain condition does not always apply. These are listed below.","Based on the information available this permission is considered to be one which will require the approval of a biodiversity gain plan before development is begun because none of the statutory exemptions or transitional arrangement","The applicant is advised that where conditions requiring submissions of details have been discharged in connection with the original permission, the Local Planning Authority will not require these details to be resubmitted as part of this new planning permission where details remain the same.","The following plans are SUPERSEDED by this planning permission:","23/3569/51 - Rev A","23/3569/54 - Rev A","23/3569/55","The following plans are APPROVED by this planning permission:","23/3569/51 - Rev C","23/3569/54 - Rev C","23/3569/55 - Rev B"],"wgs84_polygon":{"coordinates":[[[-0.465563,51.559122],[-0.465564,51.559095],[-0.465607,51.559095],[-0.465606,51.559122],[-0.465563,51.559122]]],"type":"Polygon"},"centroid_easting":506472.0,"url_planning_app":"http://planning.hillingdon.gov.uk/OcellaWeb/planningDetails?reference=23271/APP/2026/647","appeal_decision":null,"date_building_work_completed_under_previous_permission":null,"actual_commencement_date":null,"cil_liability":true,"epc_number":null,"locality":null,"ward":"ICK/HAM & S HF/D 22","appeal_start_date":null,"secondary_street_name":null,"centroid":{"lat":51.559027,"lon":-0.465516},"title_number":null,"decision_target_date":"12/05/2026","decision":"Approved","uprn":null,"application_type":"All Other","appeal_status":null,"polygon":null,"decision_agency":"Borough","actual_completion_date":null,"pp_id":"14778911","lpa_app_no":"23271/APP/2026/647","last_synced":"2026-08-11T02:50:57.239Z","centroid_northing":185576.0,"application_details":{"existing_uprns":null},"status":"Approved","parking_details":null,"description":"Variation of Condition 2 (Approved Plans) of planning permission ref. 23271/APP/2025/1515, dated 20-08-2025 (Demolition of existing two storey detached dwelling house and erection of two storey detached dwelling house with habitable rooms in loft space.) to increase depth and height of rear projection with amendments to fenestration, removal of rear dormer.","lapsed_date":"12/05/2029","application_type_full":"Removal/Variation of a condition","borough":"Hillingdon","last_updated":"2026-08-10T22:00:05.019Z","development_type":null,"id":"Hillingdon-23271_APP_2026_647","valid_date":"13/03/2026"}