{"postcode":null,"status":"Approved","decision_agency":"Borough","subdivision_of_building":null,"appeal_start_date":null,"cil_liability":false,"decision_conditions":["The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted drawing numbers:","LP Rev A","100 Rev E","101 Rev A","5740/A101 Rev. I","5740 /A102 Rev G","5740 /A103 Rev K","5740 /A104 Rev H","5740/ A108","Tree Survey and Arboricultural Impact Assessment ref. GHA/DS/222160:24 dated 05-08-2024 prepared by GHA Trees","Tree Protection Plan Rev D dated August 2024","and shall thereafter be retained/maintained for as long as the development remains in existence.","REASON","To ensure the development complies with the provisions of the Hillingdon Local Plan Part 1 (2012), Part 2 (2020) and the London Plan (2021).","The development hereby permitted shall be carried out in strict accordance with the materials and external surfaces approved pursuant to application ref. 38787/APP/2023/1403, and shall thereafter be retained as such for the lifetime of the development.","REASON","To ensure that the development presents a satisfactory appearance in accordance with Policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020).","The development hereby permitted shall be carried out in strict accordance with the Demolition and Construction Management Plan approved pursuant to application ref. 38787/APP/2023/1403.","The approved details shall be implemented and maintained throughout the duration of the demolition and construction process.","REASON","To safeguard the amenity of surrounding areas in accordance with Policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020) and to ensure that trees and other vegetation can and will be retained on site and not damaged during construction work and to ensure that the development conforms with policy DMHB 14 of the Hillingdon Local Plan Part  2 (2020).","The development hereby permitted shall be carried out in strict accordance with the Basement Impact Assessment approved pursuant to application ref. 38787/APP/2023/1403, and all mitigation and monitoring measures contained therein shall be implemented for the duration of the construction works.","REASON","To ensure the development provides satisfactory means of drainage on site and to reduce the risk of localised flooding, and to safeguard the appearance and structural stability of neighbouring buildings and the character of the immediate area in compliance with Policies DMHB 11 and DMHD 3 of the Hillingdon Local Plan Part 2 (2020).","The development hereby permitted shall be carried out in strict accordance with the sustainable water management and water efficiency scheme approved pursuant to application ref. 38787/APP/2023/1403. The approved measures shall thereafter be retained, maintained and operated for the lifetime of the development.","REASON","To ensure the development does not increase the risk of flooding in accordance with Policy DMEI 10 of the Hillingdon Local Plan Part 2 (2020) and Policies SI2 and SI 13 of the London Plan (2021).","The development hereby permitted shall be carried out in strict accordance with the step-free access details approved pursuant to application ref. 38787/APP/2023/1403, and such provision shall be retained for the lifetime of the development.","REASON","To ensure housing of an inclusive design is achieved and maintained in accordance with Policies D5 and D7 of the London Plan (2021).","The development hereby permitted shall be carried out in strict accordance with the landscaping scheme approved pursuant to application ref. 38787/APP/2023/1880, and the approved soft and hard landscaping, planting, boundary treatments and maintenance measures shall be implemented and thereafter retained and maintained in accordance with the approved details.","REASON","To ensure that the proposed development will preserve and enhance the visual amenities of the locality and provide adequate facilities in compliance with policies DMHB 11, DMHB 12, DMHB 14 and DMT 2 of the Hillingdon Local Plan Part 2 (2020) and Policy G5 of the London Plan (2021).","Trees, hedges and shrubs shown to be retained on the approved plan(s) shall not be damaged, uprooted, felled, lopped or topped without the prior written consent of the Local Planning Authority. If any retained tree, hedge or shrub is removed or severely damaged during (or after) construction, or is found to be seriously diseased or dying, another tree, hedge or shrub shall be planted at the same place or, if planting in the same place would leave the new tree, hedge or shrub susceptible to disease, then the planting should be in a position to be first agreed in writing with the Local Planning Authority and shall be of a size and species to be agreed in writing by the Local Planning Authority and shall be planted in the first planting season following the completion of the development or the occupation of the buildings, whichever is the earlier.","Where damage is less severe, a schedule of remedial works necessary to ameliorate the effect of damage by tree surgery, feeding or groundwork","The development hereby permitted shall be carried out in strict accordance with the tree protection measures, method statement and protective fencing details approved pursuant to application ref. 38787/APP/2023/1880. The approved measures shall be implemented and maintained throughout the duration of construction works.","The approved tree protection fencing shall be retained in position for the duration of construction works, and the protected areas shall remain undisturbed in accordance with the approved details.","REASON","To ensure that trees and other vegetation can and will be retained on site and not damaged during construction work and to ensure that the development conforms with policy DMHB 14 of the Hillingdon Local Plan Part  2 (2020).","The access for the proposed car parking shall be provided with those parts of 2.4m x 2.4m pedestrian visibility splays which can be accommodated within the site in both directions and shall be maintained free of all obstacles to the visibility between heights of 0.6m and 2.0m above the level of the adjoining highway.","REASON","In the interests of highway and pedestrian safety in accordance with policy DMT 2 of the Hillingdon Local Plan Part 2 (2020).","The dwelling hereby approved shall be constructed to meet the standards for a Category 2 M4(2) dwelling, as set out in Approved Document M to the Building Regulations (2010) 2015, and all such provisions shall remain in place for the life of the building.","REASON","To ensure housing of an inclusive design is achieved and maintained in accordance with Policies D5 and D7 of the London Plan (2021).","The dwelling hereby approved shall not be occupied until it has achieved an energy efficiency standard of a minimum 10% CO2 improvement over Building Regulations requirements Part L 2013 (TER Baseline).","REASON","In the interest of energy conservation and to comply with SI 2 of the London Plan (2021).","The first floor side elevation windows shall be glazed with permanently obscured glass to at least scale 4 on the Pilkington scale and be non-opening below a height of 1.8 metres taken from internal finished floor level (of the room served by the relevant window) for so long as the development remains in existence.","REASON","To prevent overlooking to adjoining properties in accordance with policies DMHB 11 and DMHD 1-2 of the Hillingdon Local Plan Part 2 (2020).","Notwithstanding the provisions of the Town and Country Planning (General Permitted Development)(England)Order 2015 (or any order revoking and re-enacting that Order with or without modification), no additional windows, doors or other openings shall be constructed in the walls or roof slopes of the development hereby approved.","REASON","To prevent overlooking to adjoining properties in accordance with policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020).","Notwithstanding the provisions of the Town and Country Planning (General Permitted Development)(England) Order 2015 (or any order revoking and re-enacting that Order with or without modification); no garage(s), shed(s) or other outbuilding(s), nor any extension or roof alteration to the  dwellinghouse shall be erected without the grant of further specific permission from the Local Planning Authority.","REASON","To protect the character and appearance of the area and amenity of residential occupiers in accordance with policies DMHB 11 and DMHD 2 of the Hillingdon Local Plan Part 2 (2020).","No floodlighting shall be installed.","REASON","To safeguard the amenity of surrounding properties in accordance with policies DMHB 11 of the Hillingdon Local Plan Part 2 (2020); and","To protect the ecological value of the area in accordance with Policy DMEI 7 (delete as appropriate).","The garden outbuilding hereby approved, as shown on drawing no. 101 Rev. A, shall be used solely for purposes incidental to the residential use of the main dwelling at 25 Linksway, and shall only be used for the purposes stated on the approved drawings, namely as a store room, cupboard and WC. The outbuilding hereby approved shall not be used or occupied as a separate or independent unit of accommodation.","REASON","To avoid any future fragmentation of the curtilage or the creation of a separate residential or business use, so as to protect the amenity of adjoining residential properties in accordance with Policies DMHB 11, DMHB 18, DMHD 2 and DMT 6 of the Hillingdon Local Plan Part 2 (2020).","Nuisance from demolition and construction works is subject to control under The Control of Pollution Act 1974, the Clean Air Acts and other related legislation. In particular, you should ensure that the following are complied with:-","A. Demolition and construction works which are audible at the site boundary shall only be carried out between the hours of 08.00 and 18.00 hours Monday to Friday and between the hours of 08.00 hours and 13.00 hours on Saturday. No works shall be carried out on Sundays, Bank or Public Holidays.","B. All noise generated during such works shall be controlled in compliance with British Standard Code of Practice BS 5228:2009.","C. Dust emissions shall be controlled in compliance with the Mayor of London's Best Practice Guidance' The Control of dust and emissions from construction and demolition.","D. No bonfires that create dark smoke or nuisance to local residents.","You are advised to consult the Council's Environmental Protection Unit (www.hillingdon.gov.uk/nois","The decision to GRANT planning permission has been taken having regard to all relevant planning legislation, regulations, guidance, circulars and Council policies, including The Human Rights Act (1998) (HRA 1998) which makes it unlawful for the Council to act incompatibly with Convention rights, specifically Article 6 (right to a fair hearing); Article 8 (right to respect for private and family life); Article 1 of the First Protocol (protection of property) and Article 14 (prohibition of discrimination).","The decision to GRANT planning permission has been taken having regard to the policies and proposals in the Hillingdon Local Plan Part 1 (2012) and Part 2 (2020) set out below, including Supplementary Planning Guidance, and to all relevant material considerations, including The London Plan (2021) and national guidance.","The development requires the formation of a vehicular crossover, which will be constructed by the Council.  This work is also subject to the issuing of a separate licence to obstruct or open up the public highway. The footway for any redundant crossover will need to be reinstated at the applicant's expense. For further information and advice contact: - Highways Maintenance Operations, 4W/07, Civic Centre, Uxbridge, UB8 1UW.","Under the terms of the Planning Act 2008 (as amended) and Community Infrastructure Levy Regulations 2010 (as amended), this development is liable to pay the London Borough of Hillingdon Community Infrastructure Levy (CIL) and the Mayor of London's Community Infrastructure Levy (CIL). This will be calculated in accordance with the London Borough of Hillingdon CIL Charging Schedule 2014 and the Mayor of London's CIL Charging Schedule 2019 (MCIL2).","Before commencement of works the development parties must notify the London Borough of Hillingdon of the commencement date for the construction works (by submitting a Commencement Notice) and assume liability to pay CIL (by submitting an Assumption of Liability Notice) to the Council at planning@hillingdon.gov.uk. The Council will then issue a Demand Notice setting out the date and the amount of CIL that is payable. Failure to submit a valid Assumption of Liability Notice and Commencement Notice prior to commencement of the development may re","The Council will recover from the applicant the cost of highway and footway repairs, including damage to grass verges.","Care should be taken during the building works hereby approved to ensure no damage occurs to the verge or footpaths during construction. Vehicles delivering materials to this development shall not override or cause damage to the public footway. Any damage will require to be made good to the satisfaction of the Council and at the applicant's expense.","For further information and advice contact - Highways Maintenance Operations, Central Depot - Block K, Harlington Road Depot, 128 Harlington Road, Hillingdon, Middlesex, UB3 3EU (Tel: 01895 277524).","For Private Roads: Care should be taken during the building works hereby approved to ensure no damage occurs to the verge of footpaths on private roads during construction. Vehicles delivering materials to this development shall not override or cause damage to a private road and where possible alternative routes should be ta","Wildlife and Countryside Act 1981:  Note that it is an offence under this act to disturb roosting bats, nesting birds or any other protected species.  Therefore, if applicable, it is advisable to consult your tree surgeon / consultant to agree an acceptable time for carrying out the approved works."],"actual_commencement_date":null,"pp_id":"14579734","decision_target_date":"16/04/2026","valid_date":"10/02/2026","lpa_app_no":"38787/APP/2025/3215","locality":null,"appeal_decision_date":null,"parking_details":null,"decision_process":"Delegated","street_name":"NORTHWOOD","last_synced":"2026-07-13T02:22:45.958Z","site_number":null,"centroid_easting":508589.0,"polygon":null,"ward":"NORTHWOOD 2022","centroid_northing":190593.0,"application_type":"All Other","uprn":null,"lapsed_date":"13/04/2029","actual_completion_date":null,"decision":"Approved","site_name":"25 LINKSWAY","borough":"Hillingdon","last_date_consultation_comments":"03/03/2026","application_type_full":"Approval of details reserved by a condition (discharge)","url_planning_app":"http://planning.hillingdon.gov.uk/OcellaWeb/planningDetails?reference=38787/APP/2025/3215","decision_date":"13/04/2026","bo_system":"CSV Data Import","development_type":null,"appeal_status":null,"date_building_work_completed_under_previous_permission":null,"description":"Variation of Condition 2 (Approved Drawings) of planning permission ref. 38787/APP/2024/2435, dated 15-11-2024 (Variation of Condition 2 (approved drawings) of planning permission ref. 38787/APP/2022/254 dated 21-04-2022 (Demolition of the existing building and the erection of a 2 storey, 7 bedroom detached dwellinghouse, including the excavation of a basement to provide habitable space and a sunken squash court with associated works) for the construction of a garden building.","appeal_decision":null,"date_building_work_started_under_previous_permission":null,"epc_number":null,"last_updated":"2026-07-12T22:00:07.032Z","centroid":{"lon":-0.43344,"lat":51.603716},"lpa_name":"Hillingdon","secondary_street_name":null,"application_details":{"existing_uprns":null},"wgs84_polygon":null,"id":"Hillingdon-38787_APP_2025_3215","reference_no_of_permission_being_relied_on":null,"title_number":null,"last_updated_by":"CSV Data Import"}