{"postcode":"HA6 1BN","status":"Approved","decision_agency":"Borough","subdivision_of_building":null,"appeal_start_date":null,"cil_liability":true,"decision_conditions":["The development hereby permitted shall be begun before the expiration of three years from the date of this permission.","REASON","To comply with Section 91 of the Town and Country Planning Act 1990.","The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted drawings:-","AGL175852","NW 02F","NW 04A","NW 05A","NW 06","and shall thereafter be retained/maintained for as long as the development remains in existence.","REASON","To ensure the development complies with the provisions of the Hillingdon Local Plan Part 1 (2012), Part 2 (2020) and the London Plan (2021).","The residential units hereby approved shall be used only as dwellings within Use Class C3 of the Town and Country Planning (Use Classes) Order 1987 (as amended), and for no other purpose within the Schedule to that Order or any provision equivalent to that Class in any statutory instrument revoking and re-enacting that Order.","REASON","To ensure the development is used for residential purposes only and to allow the Local Planning Authority to retain control over any future change of use in the interests of residential amenity, in accordance with Policy DMHB 11 of the Local Plan Part 2 (2020).","Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no additional windows, doors or other openings shall be constructed in the walls or roof slopes of the development hereby approved.","REASON","To prevent overlooking to adjoining properties in accordance with Policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020).","The window facing west (labelled W4 serving Bedroom 2 on drawing reference NW02 F) shall be glazed with permanently obscured glass to at least scale 4 on the Pilkington scale and be non-opening below a height of 1.8 metres taken from internal finished floor level for so long as the development remains in existence.","REASON","To prevent overlooking to adjoining properties in accordance with policies DMHB 11 and DMHD 1-2 of the Hillingdon Local Plan Part 2 (2020).","The dwelling hereby approved shall be designed and constructed to achieve a maximum water consumption of 105 litres per person per day, in accordance with the optional technical standard set out in the Building Regulations (Part G).","REASON","To ensure water efficiency in accordance with Policy SI 5 of the London Plan (2021) and Policy DMEI 2 of the Local Plan Part 2 (2020).","Prior to development commencing, a demolition and Construction Management Plan shall be submitted to and approved in writing by the Local Planning Authority. The plan shall detail:","(i) The phasing of development works.","(ii) The hours during which development works will occur (please refer to informative I15 for maximum permitted working hours).","(iii) Measures to prevent mud and dirt tracking onto footways and adjoining roads (including wheel washing facilities).","(iv) Traffic management and access arrangements (vehicular and pedestrian) and parking provisions for contractors during the development process (including measures to reduce the numbers of construction vehicles accessing the site during peak hours).","(v) Measures to reduce the impact of the development on local air quality and dust through minimising emissions throughout the demolition and construction process.","(vi) The storage of demolition/construction materials on site.","The approved details shall be implemented and maintai","Prior to the commencement of above-ground works, a Fire Statement, produced by a suitably qualified third-party assessor, shall be submitted to and approved in writing by the Local Planning Authority. The Statement shall demonstrate compliance with Policy D12(B) of the London Plan (2021) and shall include:","a) means of escape and evacuation strategy;","b) fire detection and alarm systems;","c) external fire spread and materials;","d) access for firefighting and equipment; and","e) how the design accounts for the mixed-use nature of the building and the communal terrace.","The development shall be carried out in accordance with the approved Fire Statement and retained thereafter.","REASON","To ensure the development achieves the highest standards of fire safety in accordance with Policy D12 of the London Plan (2021).","Prior to first occupation of the development hereby approved, details of secure and accessible cycle parking provision (a suitable space saving cycle wall rack would be acceptable) for a minimum of 1 cycle space shall be submitted to and approved in writing by the Local Planning Authority.","The cycle parking shall thereafter be installed in accordance with the approved details and retained for the lifetime of the development.","REASON","To ensure the provision of adequate facilities for cyclists and to promote sustainable modes of transport in accordance with Policies DMT 5 of the Hillingdon Local Plan: Part 2 (2020) and Policy T5 of the London Plan (2021).","In dealing with the application the Council has implemented the requirement in the National Planning Policy Framework to work with the applicant in a positive and proactive way. We have made available detailed advice in the form of our statutory policies from Local Plan Part 1, Local Plan Part 2, Supplementary Planning Documents, Planning Briefs and other informal written guidance, as well as offering a full pre-application advice service, in order to ensure that the applicant has been given every opportunity to submit an application which is likely to be considered favourably.","Under the terms of the Planning Act 2008 (as amended) and Community Infrastructure Levy Regulations 2010 (as amended), this development is liable to pay the London Borough of Hillingdon Community Infrastructure Levy (CIL) and the Mayor of London's Community Infrastructure Levy (CIL). This will be calculated in accordance with the London Borough of Hillingdon CIL Charging Schedule 2014 and the Mayor of London's CIL Charging Schedule 2012. Before commencement of works the development parties must notify the London Borough of Hillingdon of the commencement date for the construction works (by submitting a Commencement Notice) and assume liability to pay CIL (by submitting an Assumption of Liability Notice) to the Council at planning@hillingdon.gov.uk. The Council will then issue a Demand Notice setting out the date and the amount of CIL that is payable. Failure to submit a valid Assumption of Liability Notice and Commencement Notice prior to commencement of the development may result in su","The decision to GRANT planning permission has been taken having regard to all relevant planning legislation, regulations, guidance, circulars and Council policies, including The Human Rights Act (1998) (HRA 1998) which makes it unlawful for the Council to act incompatibly with Convention rights, specifically Article 6 (right to a fair hearing); Article 8 (right to respect for private and family life); Article 1 of the First Protocol (protection of property) and Article 14 (prohibition of discrimination).","The decision to GRANT planning permission has been taken having regard to the policies and proposals in the Hillingdon Local Plan Part 1 (2012) and Part 2 (2020) set out below, including Supplementary Planning Guidance, and to all relevant material considerations, including The London Plan (2021) and national guidance.","Nuisance from demolition and construction works is subject to control under The Control of Pollution Act 1974, the Clean Air Acts and other related legislation. In particular, you should ensure that the following are complied with:-","A. Demolition and construction works which are audible at the site boundary shall only be carried out between the hours of 08.00 and 18.00 hours Monday to Friday and between the hours of 08.00 hours and 13.00 hours on Saturday. No works shall be carried out on Sundays, Bank or Public Holidays.","B. All noise generated during such works shall be controlled in compliance with British Standard Code of Practice BS 5228:2009.","C. Dust emissions shall be controlled in compliance with the Mayor of London's Best Practice Guidance' The Control of dust and emissions from construction and demolition.","D. No bonfires that create dark smoke or nuisance to local residents.","You are advised to consult the Council's Environmental Protection Unit (www.hillingdon.gov.uk/nois","You are advised that if any part of the development hereby permitted encroaches by either its roof, walls, eaves, gutters, or foundations, then a new planning application may have to be submitted. The validity of this planning permission may be challengeable by third parties if the development results in any form of encroachment onto land outside the applicant's control for which the appropriate Notice under Article 13 of the Town and Country Planning (Development Management Procedure) (England) Order 2015 has not been served.","The Council will recover from the applicant the cost of highway and footway repairs, including damage to grass verges.","Care should be taken during the building works hereby approved to ensure no damage occurs to the verge or footpaths during construction. Vehicles delivering materials to this development shall not override or cause damage to the public footway. Any damage will require to be made good to the satisfaction of the Council and at the applicant's expense.","For further information and advice contact - Highways Maintenance Operations, Central Depot - Block K, Harlington Road Depot, 128 Harlington Road, Hillingdon, Middlesex, UB3 3EU (Tel: 01895 277524).","For Private Roads: Care should be taken during the building works hereby approved to ensure no damage occurs to the verge of footpaths on private roads during construction. Vehicles delivering materials to this development shall not override or cause damage to a private road and where possible alternative routes should be ta","Your attention is drawn to the fact that the planning permission does not override property rights and any ancient rights of light that may exist. This permission does not empower you to enter onto land not in your ownership without the specific consent of the owner. If you require further information or advice, you should consult a solicitor.","Wildlife and Countryside Act 1981:  Note that it is an offence under this act to disturb roosting bats, nesting birds or any other protected species.  Therefore, if applicable, it is advisable to consult your tree surgeon / consultant to agree an acceptable time for carrying out the approved works."],"actual_commencement_date":null,"pp_id":"14495204","decision_target_date":"08/04/2026","valid_date":"24/11/2025","lpa_app_no":"39444/APP/2025/2967","locality":"Northwood","appeal_decision_date":null,"parking_details":null,"decision_process":"Delegated","street_name":"High Street","last_synced":"2026-07-17T02:04:01.081Z","site_number":20,"centroid_easting":509745,"polygon":{"geometries":[{"coordinates":[[[509749.2,190849.6],[509744.1,190851.6],[509742.1,190852.4],[509741,190849.55],[509740.5,190848.4],[509747.65,190845.55],[509747.05,190844.05],[509750.75,190842.6],[509751.441,190844.316],[509752.3,190846.45],[509752.95,190848.1],[509749.2,190849.6]]],"type":"Polygon"}],"type":"GeometryCollection"},"ward":"NORTHWOOD 2022","centroid_northing":190848,"application_type":"All Other","uprn":100023037564,"lapsed_date":"07/04/2029","actual_completion_date":null,"decision":"Approved","site_name":"20B HIGH STREET","borough":"Hillingdon","last_date_consultation_comments":"11/03/2026","application_type_full":"Full planning permission","url_planning_app":"http://planning.hillingdon.gov.uk/OcellaWeb/planningDetails?reference=39444/APP/2025/2967","decision_date":"07/04/2026","bo_system":"CSV Data Import","development_type":null,"appeal_status":null,"date_building_work_completed_under_previous_permission":null,"description":"Change of use of existing office building from OFFICE USE to RESIDENTIAL USE.                                                                                                                                                        Removal of existing external fire escape stair.","appeal_decision":null,"date_building_work_started_under_previous_permission":null,"epc_number":null,"last_updated":"2026-07-16T19:04:38.523Z","centroid":{"lon":-0.416675,"lat":51.605784},"lpa_name":"Hillingdon","secondary_street_name":null,"application_details":{"existing_uprns":null,"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"single phase","intended_completion_date":"03/2026","intended_commencement_date":"02/2026"}],"total_gia_gained":0,"site_area":0.0049,"total_gia_existing":80,"total_gia_lost":0,"existing_proposed_floorspace_details":[{"gia_existing":80,"use_class":"C3","gia_gained":0,"gia_lost":0}],"projected_cost_of_works":"Up to £2m","scheme_phasing":true,"rain_water_harvesting":false,"grey_water_reuse":false,"green_suds":false,"surface_water_discharge_percentage_reduction":0,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":0,"total_gia_existing":80,"total_gia_lost":0},"garden_land_lost":false,"residential_details":{"total_no_proposed_residential_units_shared_equity":0,"total_no_proposed_bedrooms":2,"total_no_proposed_residential_units":1,"total_no_proposed_residential_units_london_living_rent":0,"total_no_proposed_residential_affordable_units":0,"total_no_proposed_residential_units_affordable_rent":0,"total_no_existing_residential_units":0,"total_no_proposed_residential_units_discount_market_sale":0,"total_no_proposed_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_existing_residential_units_london_living_rent":0,"total_no_existing_residential_units_shared_equity":0,"total_no_existing_residential_units_market_for_sale":0,"total_no_existing_residential_units_intermediate":0,"total_no_proposed_residential_units_market_for_rent":0,"total_no_existing_residential_units_social_rent":0,"total_no_proposed_residential_units_self_build_and_custom_build":0,"total_no_existing_residential_units_discount_market_rent":0,"total_no_proposed_residential_units_market_for_sale":1,"total_no_existing_residential_affordable_units":0,"total_no_existing_residential_units_affordable_rent":0,"habitable_rooms_density":null,"total_no_existing_residential_units_london_shared_ownership":0,"total_gia_gained":52,"total_no_proposed_residential_units_social_rent":0,"total_no_existing_residential_units_london_affordable_rent":0,"dwelling_density":0,"total_no_existing_residential_units_discount_market_sale":0,"total_no_proposed_residential_units_starter_homes":0,"total_no_proposed_residential_units_london_affordable_rent":0,"total_gia_lost":0,"total_no_existing_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_existing_residential_units_starter_homes":0,"total_no_proposed_residential_units_discount_market_rent":0,"total_no_proposed_residential_units_intermediate":0,"affordable_percentage":0.0,"total_no_proposed_residential_units_london_shared_ownership":0,"residential_units":[{"no_habitable_rooms":4,"provider":"Private","change_type":"Gain","unit_type":"House or Bungalow","no_bedrooms":2,"tenure":"Market for sale","gia":52}],"total_no_existing_residential_units_market_for_rent":0,"total_no_existing_residential_units_self_build_and_custom_build":0},"internal_resi_water_usage":350,"infrastructure_details":{"total_annual_pm_emissions":9,"green_roof_area":0,"no_resi_units_to_have_full_fibre":1,"no_new_water_connections_required":0,"no_homes_passive_cooling":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":40,"waste_provision":true,"percentage_demolition_construction_material_recycling":0,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"ghg_reduction_over_building_regulations":true,"urban_greening_factor_score":0},"ownership_status":"Private","occupation_status":"Vacant"},"wgs84_polygon":{"coordinates":[[[-0.416614,51.605798],[-0.416687,51.605817],[-0.416716,51.605824],[-0.416733,51.605799],[-0.41674,51.605789],[-0.416638,51.605762],[-0.416647,51.605748],[-0.416594,51.605735],[-0.416584,51.60575],[-0.41657,51.605769],[-0.416561,51.605784],[-0.416614,51.605798]]],"type":"Polygon"},"id":"Hillingdon-39444_APP_2025_2967","reference_no_of_permission_being_relied_on":null,"title_number":null,"last_updated_by":"PP overwrite repair"}