{"uprn":null,"ward":"WOOD END 2022","epc_number":null,"description":"Erection of a new two storey dwelling with associated garden space, car parking and cycle parking, following the demolition of the existing garages.","centroid_easting":508563.0,"decision_date":"28/07/2026","street_name":"HAYES","locality":null,"status":"Approved","date_building_work_started_under_previous_permission":null,"application_type_full":"Full planning permission","lpa_name":"Hillingdon","decision_target_date":"12/08/2026","lpa_app_no":"40556/APP/2026/1350","title_number":null,"decision":"Approved","last_updated":"2026-10-26T23:00:06.378Z","appeal_start_date":null,"actual_commencement_date":null,"bo_system":"CSV Data Import","secondary_street_name":null,"decision_agency":"Borough","last_date_consultation_comments":"03/07/2026","appeal_decision_date":null,"actual_completion_date":null,"centroid_northing":181253.0,"wgs84_polygon":null,"date_building_work_completed_under_previous_permission":null,"lapsed_date":"28/07/2029","decision_conditions":["The development hereby permitted shall be begun before the expiration of three years from the date of this permission.","REASON","To comply with Section 91 of the Town and Country Planning Act 1990.","The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers","Location Plan","2079-P-01 Rev C","2079-P-02","2079-P-11","and shall thereafter be retained/maintained for as long as the development remains in existence.","REASON","To ensure the development complies with the provisions Hillingdon Local Plan Parts 1 (November 2012) and 2 (January 2020) and the London Plan (2021).","Notwithstanding the approved drawings, no development shall take place until details of all materials and external surfaces, have been submitted to and approved in writing by the Local Planning Authority. Thereafter the development shall be constructed in accordance with the approved details and be retained as such.","Details should include information relating to make, product/type, colour and photographs/images.","REASON","To ensure that the development presents a satisfactory appearance in accordance with Policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020).","No development shall take place until a landscape scheme has been submitted to and approved in writing by the Local Planning Authority. The scheme shall include: -","1.    Details of Soft Landscaping","1.a  Planting plans (at not less than a scale of 1:100),","1.b  Written specification of planting and cultivation works to be undertaken,","1.c  Schedule of plants giving species, plant sizes, and proposed numbers/densities where appropriate","2. Details of Hard Landscaping","2.a Refuse Storage","2.b Cycle Storage (2 spaces, secure and covered)","2.c Car Parking Layout (Including 7KW EVCP)","2.d Means of enclosure/boundary treatments","2.e Hard Surfacing Materials","2.f External Lighting","2.g Other structures (such as play equipment and furniture)","3. Details of Landscape Maintenance","3.a Landscape Maintenance Schedule for a minimum period of 5 years.","3.b Proposals for the replacement of any tree, shrub, or area of surfing/seeding within the landscaping scheme which dies or in the opinion of the Local Planni","During the construction phase of the development, adequate measures shall be employed to control and minimise the emission of noise, vibration, dust and other pollutants, and to prevent obstruction of the public highway by construction vehicles, plant, equipment or materials.","REASON","To protect the amenities of neighbouring occupiers and to safeguard highway and pedestrian safety in accordance with Policies D14 and T7 of the London Plan (2021), Policy DMT 2 and DMHB 11 of the Hillingdon Local Plan: Part 2 (2020) and Policy EM8 of the Hillingdon Local Plan: Part 1 (2012","Prior to above ground level works, (excluding demolition and site clearance) a scheme for the provision of sustainable water management shall be submitted to, and approved in writing by the Local Planning Authority. The scheme shall clearly demonstrate how the approved development will incorporate sustainable urban drainage (SuDs) in accordance with the hierarchy set out in Policy 5.13 of the London Plan and will:","i. provide information on all SuDs features including the method employed to delay and control the surface water discharged from the site and:","ii. provide a management and maintenance plan for the lifetime of the development of arrangements to secure the operation of the scheme throughout its lifetime. Including appropriate details of Inspection regimes, appropriate performance specification.","The scheme shall also demonstrate the use of methods to minimise the use of potable water through water collection, reuse and recycling and will:","iii. provide details of water collectio","The development hereby approved shall incorporate step-free access at all points of entry and exit to the building(s) and shall be retained as such for the lifetime of the development.","REASON","To ensure that housing of an inclusive design is provided and maintained in accordance with Policies D5 (Inclusive Design) and D7 (Accessible Housing) of the London Plan (2021).","The dwellings hereby approved shall accord with the requirements of Policy D7 of the London Plan and shall not be occupied until certification of compliance with the technical specifications for an M4(2) dwelling, as set out in Approved Document M to the Building Regulations (2010) 2015, has been submitted to, and approved in writing, by the Local Planning Authority.  All such provisions must remain in place for the life of the building.","REASON:","To not only allow the Building Control body to require the development to comply with the optional Building Regulations standards, but to also ensure the appropriate quantity and standard of accessible and adaptable housing is constructed and maintained in accordance with policy D7 of the London Plan.","The upper floor side window facing Number 86 Tudor Road shall be glazed with permanently obscured glass to at least scale 4 on the Pilkington scale and be non-opening below a height of 1.8 metres taken from internal finished floor level for so long as the development remains in existence.","REASON","To prevent overlooking to adjoining properties in accordance with policies DMHB 11 and DMHD 1-2 of the Hillingdon Local Plan Part 2 (2020).","Notwithstanding the provisions of the Town and Country Planning (General Permitted Development)(England) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no additional windows, doors or other openings shall be constructed in the walls or roof slopes of the development hereby approved facing the host dwelling which is No.84 Tudor Road and No.86 Tudor Road.","REASON","To prevent overlooking to adjoining properties in accordance with policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020).","The development hereby approved includes the carrying out of alterations to a vehicular access.  Prior to undertaking work on the adopted highway you will require a Section 184 licence from the Highway Authority. The works shall be to the specification and constructed to the satisfaction of the Highway Authority. Fees are payable for the approval of the highway details, and inspection of the works. Further information and an application form are available on the London Borough of Hillingdon website https://www.hillingdon.gov.uk/dropped-kerb-form","The effect of paragraph 13 of Schedule 7A to the Town and Country Planning Act 1990 is that planning permission granted for development of land in England is deemed to have been granted subject to the condition (biodiversity gain condition) that development may not begin unless:","(a) a Biodiversity Gain Plan has been submitted to the planning authority, and","(b) the planning authority has approved the plan.","The planning authority, for the purposes of determining whether to approve a Biodiversity Gain Plan, if one is required in respect of this permission would be the London Borough of Hillingdon.","There are statutory exemptions and transitional arrangements which mean that the biodiversity gain condition does not always apply. These are listed below.","Based on the information available this permission is considered to be one which will not require the approval of a biodiversity gain plan before development is begun because one or more of the statutory exemptions or transitional arrangeme","The decision to GRANT planning permission has been taken having regard to all relevant planning legislation, regulations, guidance, circulars and Council policies, including The Human Rights Act (1998) (HRA 1998) which makes it unlawful for the Council to act incompatibly with Convention rights, specifically Article 6 (right to a fair hearing); Article 8 (right to respect for private and family life); Article 1 of the First Protocol (protection of property) and Article 14 (prohibition of discrimination).","The decision to GRANT planning permission has been taken having regard to the policies and proposals in the Hillingdon Local Plan Part 1 (2012) and Part 2 (2020) set out below, including Supplementary Planning Guidance, and to all relevant material considerations, including The London Plan and national guidance.","On this decision notice policies from the Councils Local Plan: Part 1 - Strategic Policies appear first, then relevant Local Plan Part 2 (2020), then London Plan Policies (2016). Hillingdon's Full Council adopted the Hillingdon Local Plan: Part 1 - Strategic Policies on 8 November 2012 and the Hillingdon Local Plan Part 2 on 16 January 2020.","Under the terms of the Planning Act 2008 (as amended) and Community Infrastructure Levy Regulations 2010 (as amended), this development is liable to pay the London Borough of Hillingdon Community Infrastructure Levy (CIL) and the Mayor of London's Community Infrastructure Levy (CIL). This will be calculated in accordance with the London Borough of Hillingdon CIL Charging Schedule 2014 and the Mayor of London's CIL Charging Schedule 2012. Before commencement of works the development parties must notify the London Borough of Hillingdon of the commencement date for the construction works (by submitting a Commencement Notice) and assume liability to pay CIL (by submitting an Assumption of Liability Notice) to the Council at planning@hillingdon.gov.uk. The Council will then issue a Demand Notice setting out the date and the amount of CIL that is payable. Failure to submit a valid Assumption of Liability Notice and Commencement Notice prior to commencement of the development may result in su","You are advised that if any part of the development hereby permitted encroaches by either its roof, walls, eaves, gutters, or foundations, then a new planning application may have to be submitted. The validity of this planning permission may be challengeable by third parties if the development results in any form of encroachment onto land outside the applicant's control for which the appropriate Notice under Article 13 of the Town and Country Planning (Development Management Procedure) (England) Order 2015 has not been served.","The Party Wall Act 1996 requires a building owner to notify, and obtain formal agreement from, any adjoining owner, where the building owner purposes to:","- carry out work to an existing party wall:","- build on the boundary with a neighbouring property;","- in some circumstances, carry out groundworks within 6 metres of an adjoining building.","Notification and agreements under this Act are the responsibility of the building owner and are quite separate from Building Regulations, or Planning Controls.  The Building Control Service will assume that an applicant has obtained any necessary agreements with the adjoining owner, and nothing said or implied by the Council should be taken as removing the necessity for the building owner to comply fully with the Party Wall Act.  Further information and advice is to be found in 'The Party Walls etc. Act - 1996 - Explanatory Booklet' published by the Department for Communities and Local Government.","Nuisance from demolition and construction works is subject to control under The Control of Pollution Act 1974, the Clean Air Acts and other related legislation. In particular, you should ensure that the following are complied with:-","A. Demolition and construction works which are audible at the site boundary shall only be carried out between the hours of 08.00 and 18.00 hours Monday to Friday and between the hours of 08.00 hours and 13.00 hours on Saturday. No works shall be carried out on Sundays, Bank or Public Holidays.","B. All noise generated during such works shall be controlled in compliance with British Standard Code of Practice BS 5228:2009.","C. Dust emissions shall be controlled in compliance with the Mayor of London's Best Practice Guidance' The Control of dust and emissions from construction and demolition.","D. No bonfires that create dark smoke or nuisance to local residents.","You are advised to consult the Council's Environmental Protection Unit (www.hillingdon.gov.uk/nois","The Council will recover from the applicant the cost of highway and footway repairs, including damage to grass verges.","Care should be taken during the building works hereby approved to ensure no damage occurs to the verge or footpaths during construction. Vehicles delivering materials to this development shall not override or cause damage to the public footway. Any damage will require to be made good to the satisfaction of the Council and at the applicant's expense.","For further information and advice contact - Highways Maintenance Operations, Central Depot - Block K, Harlington Road Depot, 128 Harlington Road, Hillingdon, Middlesex, UB3 3EU (Tel: 01895 277524).","For Private Roads: Care should be taken during the building works hereby approved to ensure no damage occurs to the verge of footpaths on private roads during construction. Vehicles delivering materials to this development shall not override or cause damage to a private road and where possible alternative routes should be ta"],"id":"Hillingdon-40556_APP_2026_1350","application_type":"All Other","pp_id":"14970977","parking_details":{"net_car":1,"no_proposed_car":2,"net_cycle":2,"no_proposed_cycle":4,"no_existing_cycle":2,"no_existing_car":1},"url_planning_app":"http://planning.hillingdon.gov.uk/OcellaWeb/planningDetails?reference=40556/APP/2026/1350","appeal_status":null,"valid_date":"29/05/2026","site_number":null,"application_details":{"non_residential_details":{"total_gia_gained":86.9,"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_gia_lost":0,"total_gia_existing":73.2,"total_non_resi_gross_internal_floor_area_to_be_lost":0},"garden_land_lost":true,"scheme_phasing":true,"residential_details":{"total_no_existing_residential_units_london_affordable_rent":0,"total_no_proposed_residential_units_affordable_rent":0,"total_no_existing_residential_units_discount_market_rent":0,"total_no_proposed_residential_units_shared_equity":0,"total_no_existing_residential_units_intermediate":0,"residential_units":[{"change_type":"Gain","unit_type":"Communal Space","gia":86.9},{"no_habitable_rooms":6,"provider":"Private","change_type":"Gain","garden_land":true,"unit_type":"House or Bungalow","no_bedrooms":3,"gia":86.9,"tenure":"Market for sale"}],"total_no_existing_residential_units_self_build_and_custom_build":0,"total_no_existing_residential_units_market_for_rent":0,"total_no_existing_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_proposed_residential_units_intermediate":0,"total_no_proposed_residential_units_london_living_rent":0,"total_no_existing_residential_units_starter_homes":0,"total_no_existing_residential_units_market_for_sale":0,"total_no_proposed_residential_units_self_build_and_custom_build":0,"total_no_existing_residential_units_london_shared_ownership":0,"total_no_existing_residential_units_social_rent":0,"total_no_existing_residential_units_london_living_rent":0,"total_no_proposed_residential_units_social_rent":0,"total_no_proposed_residential_units_market_for_rent":0,"total_no_existing_residential_units_shared_equity":0,"total_no_proposed_residential_units_london_affordable_rent":0,"total_gia_lost":0,"total_no_proposed_residential_units":2,"total_no_proposed_residential_units_london_shared_ownership":0,"total_no_proposed_residential_units_discount_market_rent":0,"total_no_proposed_bedrooms":3,"dwelling_density":0,"total_no_existing_residential_affordable_units":0,"total_gia_gained":173.8,"total_no_existing_residential_units_affordable_rent":0,"total_no_proposed_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_existing_residential_units":0,"total_no_proposed_residential_affordable_units":0,"habitable_rooms_density":null,"total_no_proposed_residential_units_market_for_sale":1,"total_no_existing_residential_units_discount_market_sale":0,"total_no_proposed_residential_units_discount_market_sale":0,"affordable_percentage":0.0,"total_no_proposed_residential_units_starter_homes":0},"grey_water_reuse":false,"total_gia_existing":73.2,"phasing_details":[{"phase_detail":"all","intended_completion_date":"01/2028","intended_commencement_date":"01/2027"}],"site_area":0.0396,"building_details":[{"no_storeys":2,"max_height":7.65,"building_ref":"House"}],"lead_developer_company_name":"Kream Properties Ltd.","ownership_status":"Private","infrastructure_details":{"total_annual_pm_emissions":0,"no_homes_to_have_electrical_heating":1,"no_homes_passive_cooling":0,"no_non_resi_units_to_have_full_fibre":0,"solar_pv_capacity":50,"total_annual_nox_emissions":0,"ghg_reduction_over_building_regulations":true,"mobile_network_operators_consultation":false,"no_new_gas_connections_required":0,"chp_heat_pumps_capacity":50,"percentage_demolition_construction_material_recycling":25,"waste_provision":true,"no_new_water_connections_required":1,"fire_suppression_system_proposed":false,"green_roof_area":0,"no_resi_units_to_have_full_fibre":1},"total_gia_lost":0,"existing_proposed_floorspace_details":[{"gia_existing":73.2,"use_class":"C3","gia_gained":86.9,"gia_lost":0}],"total_gia_gained":86.9,"affordable_housing_fast_track":false,"scheme_name":"84a Tudor Road","projected_cost_of_works":"Up to £2m","rain_water_harvesting":false,"internal_resi_water_usage":0,"surface_water_discharge_percentage_reduction":0,"green_suds":true},"site_name":"84 TUDOR ROAD","decision_process":"Delegated","postcode":null,"last_updated_by":"CSV Data Import","centroid":{"lat":51.519773,"lon":-0.436697},"polygon":null,"appeal_decision":null,"borough":"Hillingdon","last_synced":"2026-10-27T02:50:15.864Z","cil_liability":true,"subdivision_of_building":null,"development_type":null,"reference_no_of_permission_being_relied_on":null}