{"borough":"Hillingdon","application_type":"All Other","decision":"Approved","decision_conditions":["The development hereby permitted shall be begun before the expiration of three years from the date of this permission.","REASON","To comply with Section 91 of the Town and Country Planning Act 1990.","The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers:","3190.PLN.101 REV B","and shall thereafter be retained/maintained for as long as the development remains in existence.","REASON","To ensure the development complies with the provisions Hillingdon Local Plan Parts 1 (November 2012) and 2 (January 2020) and the London Plan (2021).","The development hereby permitted shall not be occupied until the following has been completed in accordance with the specified supporting plans and/or documents:","Daylight and Sunlight Report (V2)_Dec25","Flood Risk Assessment","Thereafter the development shall be retained/maintained in accordance with these details for as long as the development remains in existence.","REASON","To ensure the development complies with the provisions Hillingdon Local Plan Parts 1 (November 2012) and 2 (January 2020) and the London Plan (2021).","The materials to be used in the construction of the external balcony structures, including all pillars, posts, railings and associated detailing, shall match the appearance, colour and finish of the existing balcony structures on the other elevations of the building, as shown on the approved drawings. The development shall thereafter be retained in accordance with these details.","REASON","To safeguard the visual amenities of the area and to ensure that the proposed development does not have an adverse effect upon the appearance of the existing building or the character and appearance of the surrounding Conservation Area, in accordance with Policy DMHD 4 and DMHB 11 of the Hillingdon Local Plan Part 2 (2020).","The applicant shall carry out a photographic/ visual survey of the embankment 6 months after the completion of the works to ensure there is no slumping in the embankment caused as a direct result of the application implementation. The applicant shall provide the Local Planning Authority (LPA) with a copy of the survey within 1 month of the survey date. Any defects identified shall be made good at the applicant's expense and to the LPA's satisfaction within a timeframe agreed with the LPA, in conjunction with the Environment Agency.","REASON","To ensure there are no adverse effects to the structural integrity of the natural bank during the construction and for the lifetime of the development. This condition is in line with paragraph 181 of the National Planning Policy Framework and Hillingdon Local Plan policy DMEI 9: Management of Flood Risk.","The decision to GRANT planning permission has been taken having regard to all relevant planning legislation, regulations, guidance, circulars and Council policies, including The Human Rights Act (1998) (HRA 1998) which makes it unlawful for the Council to act incompatibly with Convention rights, specifically Article 6 (right to a fair hearing); Article 8 (right to respect for private and family life); Article 1 of the First Protocol (protection of property) and Article 14 (prohibition of discrimination).","The decision to GRANT planning permission has been taken having regard to the policies and proposals in the Hillingdon Local Plan Part 1 (2012) and Part 2 (2020) set out below, including Supplementary Planning Guidance, and to all relevant material considerations, including The London Plan (2021) and national guidance.","The applicant/developer is advised to contact the Canal & River Trust's Works Engineering Team on 0303 040 4040 or email enquiries.TPWSouth@canalrivertrust.org.uk in order to ensure that any necessary consents are obtained and that the works comply with the Canal & River Trust \"Code of Practice for Works affecting the Canal & River Trust.","Flood Risk Activity Permit","The Environmental Permitting (England and Wales) Regulations 2016 require a permit or exemption to be obtained for any of the following activities:","· erecting any temporary or permanent structure in, over or under a main river, such as a culvert, outfall, weir, dam, pipe crossing, erosion protection, scaffolding or bridge","· altering, repairing or maintaining any temporary or permanent structure in, over or under a main river, where the work could affect the flow of water in the river or affect any drainage work","· building or altering any permanent or temporary structure designed to contain or divert flood waters from a main river","· dredging, raising or removing any material from a main river, including when you are intending to improve flow in the river or use the materials removed","· diverting or impounding the flow of water or changing the level of water in a main river","· quarrying or excavation within 16 metres of any main river, flood defence (including a","Asset liability","The Environment Agency would like to remind the applicant that, in the absence of an alternative agreement or special transference of liability or contract, the owner of the asset remains responsible for the asset. The risk remains with the asset owner, and this response does not remove any of this liability from the owner or contractually responsible party.","In dealing with the application the Council has implemented the requirement in the National Planning Policy Framework to work with the applicant in a positive and proactive way. We have made available detailed advice in the form of our statutory policies from Local Plan Part 1, Local Plan Part 2, Supplementary Planning Documents, Planning Briefs and other informal written guidance, as well as offering a full pre-application advice service, in order to ensure that the applicant has been given every opportunity to submit an application which is likely to be considered favourably.","Nuisance from demolition and construction works is subject to control under The Control of Pollution Act 1974, the Clean Air Acts and other related legislation. In particular, you should ensure that the following are complied with:-","A. Demolition and construction works which are audible at the site boundary shall only be carried out between the hours of 08.00 and 18.00 hours Monday to Friday and between the hours of 08.00 hours and 13.00 hours on Saturday. No works shall be carried out on Sundays, Bank or Public Holidays.","B. All noise generated during such works shall be controlled in compliance with British Standard Code of Practice BS 5228:2009.","C. Dust emissions shall be controlled in compliance with the Mayor of London's Best Practice Guidance' The Control of dust and emissions from construction and demolition.","D. No bonfires that create dark smoke or nuisance to local residents.","You are advised to consult the Council's Environmental Protection Unit (www.hillingdon.gov.uk/nois","The Council will recover from the applicant the cost of highway and footway repairs, including damage to grass verges.","Care should be taken during the building works hereby approved to ensure no damage occurs to the verge or footpaths during construction. Vehicles delivering materials to this development shall not override or cause damage to the public footway. Any damage will require to be made good to the satisfaction of the Council and at the applicant's expense.","For further information and advice contact - Highways Maintenance Operations, Central Depot - Block K, Harlington Road Depot, 128 Harlington Road, Hillingdon, Middlesex, UB3 3EU (Tel: 01895 277524).","For Private Roads: Care should be taken during the building works hereby approved to ensure no damage occurs to the verge of footpaths on private roads during construction. Vehicles delivering materials to this development shall not override or cause damage to a private road and where possible alternative routes should be ta"],"last_synced":"2026-05-12T02:38:16.849Z","centroid_northing":191247.0,"url_planning_app":"http://planning.hillingdon.gov.uk/OcellaWeb/planningDetails?reference=43159/APP/2025/2811","lpa_app_no":"43159/APP/2025/2811","site_number":null,"ward":"HARE/D VILLAGES 2022","locality":null,"last_date_consultation_comments":"05/01/2026","date_building_work_started_under_previous_permission":null,"description":"Erection of external pillar balcony to rear elevation.","parking_details":null,"postcode":"UB9 6FG","appeal_status":null,"cil_liability":false,"date_building_work_completed_under_previous_permission":null,"pp_id":"14448801","status":"Approved","last_updated_by":"CSV Data Import","polygon":{"coordinates":[[[504066.13,191231.47],[504067.37,191232.11],[504071.172,191234.072],[504072.41,191234.71],[504075.87,191235.77],[504084.957,191237.143],[504086.92,191237.44],[504087.01,191237.45],[504088.284,191237.616],[504090,191237.84],[504090.098,191239.616],[504090.111,191241.829],[504090.126,191244.459],[504090.194,191256.492],[504090.201,191257.671],[504090.203,191258.006],[504090.181,191258.006],[504089.122,191258.012],[504089.172,191260.751],[504089.395,191272.968],[504089.449,191275.897],[504088.904,191276.487],[504088.133,191277.32],[504087.17,191278.361],[504087.829,191311.747],[504078.42,191277.17],[504078.15,191270.7],[504072.45,191267.92],[504072.45,191266.57],[504072.94,191262.7],[504073.15,191262.17],[504066.13,191231.47]]],"type":"Polygon"},"wgs84_polygon":null,"appeal_decision_date":null,"secondary_street_name":"Harefield","lapsed_date":"10/02/2029","bo_system":"CSV Data Import","decision_date":"10/02/2026","centroid_easting":504080.0,"actual_commencement_date":null,"id":"Hillingdon-43159_APP_2025_2811","lpa_name":"Hillingdon","decision_target_date":"11/02/2026","valid_date":"06/11/2025","development_type":null,"last_updated":"2026-05-11T22:00:07.509Z","subdivision_of_building":null,"reference_no_of_permission_being_relied_on":null,"centroid":{"lat":51.610445,"lon":-0.498329},"decision_process":"Delegated","application_type_full":"Full planning permission","decision_agency":"Borough","street_name":"32 Royal Quay","appeal_decision":null,"title_number":null,"site_name":"4 & 6 Island Apartments","appeal_start_date":null,"application_details":{"existing_uprns":null,"site_area":0.02,"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"Entire Development","intended_commencement_date":"02/2026","intended_completion_date":"03/2026"}],"total_gia_gained":0,"total_gia_existing":0,"total_gia_lost":0,"projected_cost_of_works":"Up to £2m","scheme_phasing":true,"rain_water_harvesting":false,"grey_water_reuse":false,"green_suds":false,"surface_water_discharge_percentage_reduction":0,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":0,"total_gia_existing":0,"total_gia_lost":0},"garden_land_lost":false,"internal_resi_water_usage":0,"infrastructure_details":{"total_annual_pm_emissions":0,"green_roof_area":0,"no_resi_units_to_have_full_fibre":0,"no_new_water_connections_required":0,"no_homes_passive_cooling":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"waste_provision":true,"percentage_demolition_construction_material_recycling":0,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"ghg_reduction_over_building_regulations":false},"ownership_status":"Private"},"epc_number":null,"uprn":null,"actual_completion_date":null}