{"decision":"Approved","last_date_consultation_comments":"20/02/2026","wgs84_polygon":null,"date_building_work_started_under_previous_permission":"15/03/2025","ward":"NORTHWOOD 2022","site_number":null,"polygon":null,"appeal_status":null,"application_type_full":"Full planning permission","borough":"Hillingdon","lpa_name":"Hillingdon","postcode":null,"appeal_start_date":null,"appeal_decision_date":null,"status":"Approved","valid_date":"02/12/2025","site_name":"132 HALLOWELL ROAD","decision_date":"20/03/2026","pp_id":"14510037","actual_completion_date":null,"url_planning_app":"http://planning.hillingdon.gov.uk/OcellaWeb/planningDetails?reference=43682/APP/2025/2962","application_details":{"surface_water_discharge_percentage_reduction":1,"site_area":0.0014,"existing_uprns":null,"projected_cost_of_works":"Up to £2m","scheme_phasing":true,"garden_land_lost":false,"infrastructure_details":{"fire_suppression_system_proposed":false,"green_roof_area":0,"waste_provision":true,"percentage_demolition_construction_material_recycling":0,"ghg_reduction_over_building_regulations":false,"no_homes_to_have_electrical_heating":0,"no_resi_units_to_have_full_fibre":1,"total_annual_pm_emissions":0,"total_annual_nox_emissions":0,"no_homes_passive_cooling":0,"no_new_water_connections_required":0,"no_new_gas_connections_required":0,"no_non_resi_units_to_have_full_fibre":0,"mobile_network_operators_consultation":false},"internal_resi_water_usage":0,"ownership_status":"Private","non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_lost":0,"total_gia_gained":5,"total_gia_existing":10},"existing_proposed_floorspace_details":[{"gia_existing":10,"use_class":"C3","gia_gained":5,"gia_lost":0}],"green_suds":false,"phasing_details":[{"phase_detail":"Completed","intended_completion_date":"11/2025","intended_commencement_date":"03/2025"}],"total_gia_gained":5,"total_gia_existing":10,"affordable_housing_fast_track":false,"grey_water_reuse":false,"total_gia_lost":0,"rain_water_harvesting":false},"development_type":null,"centroid_easting":509562.0,"decision_target_date":"20/03/2026","decision_agency":"Borough","actual_commencement_date":null,"lpa_app_no":"43682/APP/2025/2962","decision_process":"Delegated","lapsed_date":"20/03/2029","uprn":null,"bo_system":"CSV Data Import","cil_liability":false,"street_name":"NORTHWOOD","locality":null,"application_type":"All Other","epc_number":null,"decision_conditions":["The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans:","PME-17613-001 (Site Location Plan)","PME-17613-002 (Block Plan)","PME-17613-019 (Existing Site Plan)","PME-17613-022 (Existing Front Elevation)","PME-17613-024 (Existing Side Elevation)","PME-17613-025 (Existing Outbuilding Elevations)","REASON","To ensure the development complies with the provisions of the Hillingdon Local Plan Part 1 (2012) and Part 2 (2020), and the London Plan (2021).","The materials of the external surfaces of the development hereby permitted shall retained as stated on Planning statement ref. PME-17613, including timber cladding to the external walls.","REASON","To safeguard the visual amenities of the area and to ensure that the proposed development does not have an adverse effect upon the appearance of the existing building in accordance with Policy DMHB 5 and DMHB 11 of the Hillingdon Local Plan Part 2 (2020).","The outbuilding hereby approved shall not be used for purposes such as a living room, bedroom, kitchen, as a separate unit of accommodation.","REASON","To avoid any future fragmentation of the curtilage or the creation of a separate residential or business use, so as to protect the amenity of adjoining residential properties in accordance with Policies DMH 4, DMHB 11, DMHB 16, DMHB 18 and DMT 6 of the Hillingdon Local Plan: Part Two - Development Management Policies (January 2020).","The decision to GRANT planning permission has been taken having regard to all relevant planning legislation, regulations, guidance, circulars and Council policies, including The Human Rights Act (1998) (HRA 1998) which makes it unlawful for the Council to act incompatibly with Convention rights, specifically Article 6 (right to a fair hearing); Article 8 (right to respect for private and family life); Article 1 of the First Protocol (protection of property) and Article 14 (prohibition of discrimination).","The decision to GRANT planning permission has been taken having regard to the policies and proposals in the Hillingdon Local Plan Part 1 (2012) and Part 2 (2020) set out below, including Supplementary Planning Guidance, and to all relevant material considerations, including The London Plan - The Spatial Development Strategy for London consolidated with alterations since 2011 (2016) and national guidance.","In dealing with the application the Council has implemented the requirement in the National Planning Policy Framework to work with the applicant in a positive and proactive way. We have made available detailed advice in the form of our statutory policies from Local Plan Part 1, Local Plan Part 2, Supplementary Planning Documents, Planning Briefs and other informal written guidance, as well as offering a full pre-application advice service, in order to ensure that the applicant has been given every opportunity to submit an application which is likely to be considered favourably.","The site lies in a Critical Drainage Area (CDA) as identified in the Surface Water Management Plan (SWMP) for Hillingdon. A CDA is the catchment area from which surface water drains and contributes to drainage problems. All developments in this area must contribute to managing the risk of flooding from surface water by reducing surface water runoff from the site. Therefore the applicant should minimise the water from your site entering the sewers. No drainage to support the extension should be connected to any existing surface water sewer, other than as an overflow. Water run off from any roof or hard paving associated with  e development should be directed to a soakaway, or tank or made permeable. This includes any work to front gardens not part of the planning application, which must be permeable or be collected and directed to a permeable area, otherwise it would need an additional permission. A water butt should be incorporated."],"reference_no_of_permission_being_relied_on":null,"secondary_street_name":null,"centroid_northing":190880.0,"last_updated":"2026-05-27T22:00:07.366Z","centroid":{"lon":-0.419307,"lat":51.606107},"subdivision_of_building":"The structure replaces a previous shed on the same concrete base, measures approx. 3m × 5.18m × 2.5m high, and has no impact on neighbours in terms of privacy, daylight, or overshadowing. The outbuilding is domestic in scale, well screened by boundary fences, and in keeping with similar garden structures in the area.","last_synced":"2026-06-02T09:55:37.406Z","last_updated_by":"CSV Data Import","title_number":null,"appeal_decision":null,"date_building_work_completed_under_previous_permission":"01/11/2025","id":"Hillingdon-43682_APP_2025_2962","parking_details":{"no_proposed_car":2,"no_existing_car":2,"net_car":0},"description":"Retention of an outbuilding (Retrospective Application)."}