{"borough":"Hillingdon","application_type":"Householder","decision":"Approved","decision_conditions":["The development hereby permitted shall be begun before the expiration of three years from the date of this permission.","REASON","To comply with Section 91 of the Town and Country Planning Act 1990.","The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans:","Site Location Plan","21MC/02 (Block Plan)","21MC /10 (Proposed Floor Plans)","21MC /11 (Proposed Roof Plans)","21MC /14 (Proposed Elevations)","21MC /15 (Proposed Sections)","REASON","To ensure the development complies with the provisions of the Hillingdon Local Plan Part 1 (2012) and Part 2 (2020), and the London Plan (2021).","Access to the flat roof over the extension hereby approved shall be for maintenance or emergency purposes only and the flat roof shall not be used as a roof garden, terrace, balcony, patio or similar amenity area.","REASON","To prevent overlooking to adjoining properties in accordance with policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020).","The site lies in a Critical Drainage Area (CDA) as identified in the Surface Water Management Plan (SWMP) for Hillingdon. A CDA is the catchment area from which surface water drains and contributes to drainage problems. All developments in this area must contribute to managing the risk of flooding from surface water by reducing surface water runoff from the site. Therefore the applicant should minimise the water from your site entering the sewers. No drainage to support the extension should be connected to any existing surface water sewer, other than as an overflow. Water run off from any roof or hard paving associated with  e development should be directed to a soakaway, or tank or made permeable. This includes any work to front gardens not part of the planning application, which must be permeable or be collected and directed to a permeable area, otherwise it would need an additional permission. A water butt should be incorporated."],"last_synced":"2026-04-16T02:48:17.765Z","centroid_northing":187428.0,"url_planning_app":"http://planning.hillingdon.gov.uk/OcellaWeb/planningDetails?reference=43889/APP/2025/2693","lpa_app_no":"43889/APP/2025/2693","site_number":null,"ward":"RUISLIP 2022","locality":null,"last_date_consultation_comments":"14/11/2025","date_building_work_started_under_previous_permission":null,"description":"Erection of a rear conservatory.","parking_details":null,"postcode":"HA4 8ER","appeal_status":null,"cil_liability":false,"date_building_work_completed_under_previous_permission":null,"pp_id":"14418233","status":"Approved","last_updated_by":"CSV Data Import","polygon":{"coordinates":[[[509430.129,187399.939],[509430.277,187400.394],[509435.846,187403.271],[509439.1,187405.15],[509437.93,187408.235],[509436.966,187410.777],[509429.523,187430.404],[509428.386,187433.403],[509419.4,187457.1],[509416.1,187456.45],[509410.75,187455.2],[509408.25,187454.5],[509405.2,187453.5],[509407.75,187446.25],[509408.963,187442.736],[509409.173,187442.128],[509409.7,187440.6],[509411.3,187436.1],[509411.173,187436.042],[509412.403,187432.93],[509419.6,187412.25],[509421.4,187409.8],[509427.05,187402.2],[509429.2,187399.4],[509430.129,187399.939]]],"type":"Polygon"},"wgs84_polygon":null,"appeal_decision_date":null,"secondary_street_name":null,"lapsed_date":"15/01/2029","bo_system":"CSV Data Import","decision_date":"15/01/2026","centroid_easting":509422.0,"actual_commencement_date":null,"id":"Hillingdon-43889_APP_2025_2693","lpa_name":"Hillingdon","decision_target_date":"20/01/2026","valid_date":"22/10/2025","development_type":null,"last_updated":"2026-04-15T22:00:06.932Z","subdivision_of_building":null,"reference_no_of_permission_being_relied_on":null,"centroid":{"lat":51.575108,"lon":-0.422403},"decision_process":"Delegated","application_type_full":"Householder planning permission","decision_agency":"Borough","street_name":"RUISLIP","appeal_decision":null,"title_number":null,"site_name":"21 MIDCROFT","appeal_start_date":null,"application_details":{"total_gia_gained":20,"intended_commencement_date":"01/2026","no_additional_bedrooms":0,"intended_completion_date":"03/2026","existing_uprns":null,"no_additional_bathrooms":0,"site_area":0.085},"epc_number":null,"uprn":null,"actual_completion_date":null}