{"uprn":null,"ward":"HAYES TOWN 2022","epc_number":"3020-9201-0836-9095-2773","description":"Alterations to service yard and car parking area to remove concrete ramps and create an enlarged Service Yard with associated external alterations to warehouse building, to include updated facades, new loading doors and associated works.","centroid_easting":508503.0,"decision_date":"31/07/2026","street_name":"SWALLOWFIELD WAY","locality":null,"status":"Approved","date_building_work_started_under_previous_permission":null,"application_type_full":"Full planning permission","lpa_name":"Hillingdon","decision_target_date":"31/07/2026","lpa_app_no":"44104/APP/2026/1274","title_number":null,"decision":"Approved","last_updated":"2026-10-29T23:00:05.978Z","appeal_start_date":null,"actual_commencement_date":null,"bo_system":"CSV Data Import","secondary_street_name":"HAYES","decision_agency":"Borough","last_date_consultation_comments":"24/06/2026","appeal_decision_date":null,"actual_completion_date":null,"centroid_northing":179751.0,"wgs84_polygon":null,"date_building_work_completed_under_previous_permission":null,"lapsed_date":"31/07/2029","decision_conditions":["The development hereby permitted shall be begun before the expiration of three years from the date of this permission.","REASON","To comply with Section 91 of the Town and Country Planning Act 1990.","The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers:","- 2602_PL_001 Location Plan","- 2602_PL_002 Block Plan","- 2602_PL_006 A Ground Floor Plan Proposed","- 2602_SK_05 Elevation 01 Proposed","- 2602_SK_06 Elevation 01 Proposed Large scale","- 2602_PL_007 A First Floor Proposed","- 2602_PL_008 B Roof Plan Proposed","- 2602_PL_011 A Elevations 01 & 02 Proposed","- 2602_PL_012 Elevations 03 & 04 Proposed","- 2602_PL_014 C Site Proposed Plan","- 2602_PL_015 A Cycle Parking Area","- 2602_PL_016 Entrance elevation proposal","- 02001 P1 Proposed Drainage Sheet 1 of 2","- 02002 P1 Proposed Drainage Sheet 2 of 2","- 02401 P1 Proposed Levels Sheet 1 of 2","- 02402 P1 Proposed Levels Sheet 2 of 2","- 2602_PL_015 A Cycle Parking Area","- JN01209-MEP-001 T1 External Layout for Planning","Thereafter the development shall be retained/maintained in accordance with these details for as long as the development remains in existence","REASON","To ens","The development hereby permitted shall not be occupied until the following has been completed in accordance with the specified documents:","- Biodiversity Net Gain (BNG) Assessment, Ellendale Environmental","- Construction Environmental Management Plan, Rev. 00, 22nd May-26, JLL","- Design and access statement, Rev. C, May 2026","- Flood Risk Assessment, 13-05-2026, Argyll Environmental","- Fire Strategy Review, Revision 1, 30th April 2026, Priority Risk","- Phase One Planning, 14-05-2026, Argyll Environmental","- Plant Noise Assessment Report 2AAE.RP.1.1 // 13 May 2026, Suono","- Transport Statement, 15 May 2026, i-Transport LLP","- Mitsubishi Electric: R2 Series VRF","- Hercules LED, Diva Lighting","- MYTI, Diva LIghting","- Pteros 2, Diva Lighting","- Solar PV Proposal, March 2026, Perfect Sense Energy","- Your PV system from Perfect Sense Energy, 26/02/2026, Perfect Sense Energy","Thereafter the development shall be retained/maintained in accordance with these details for as long as the development remains i","Notwithstanding the approved plans, no development (excluding demolition and works below slab level) shall be commenced until a scheme for the provision of sustainable water management has been submitted to and approved in writing by the Local Planning Authority.  The scheme shall clearly demonstrate that sustainable drainage systems (SUDS) have been incorporated into the designs of the development in accordance with the drainage hierarchy set out in accordance with Policy SI 13 of the London Plan and will:","i. provide information about the design storm period and intensity, the method employed to delay and control the surface water discharged from the site and the measures taken to prevent pollution of the receiving groundwater and/or surface waters;","ii. include a timetable for its implementation; and","iii. provide a management and maintenance plan for the lifetime of the development which shall include the arrangements for adoption by any public authority or statutory undertaker a","In the event that contamination is found at any time when carrying out the approved development that was not previously identified it must be reported in writing immediately to the Local Planning Authority. An investigation and risk assessment must be undertaken using a Watching Brief and Discovery Strategy, and where remediation is necessary, a remediation scheme must be prepared subject to the approval in writing of the Local Planning Authority. Following completion of measures identified in the approved remediation scheme, a verification report must be prepared, which is subject to the approval in writing of the Local Planning Authority.","You are advised this development is on a former potentially contaminated land use identified as Works (Various), Depot (Various), Infilled/Possibly infilled as well as within 250m of landfill buffer. The above advice is therefore provided on the grounds of Health and Safety of the workers on site and to ensure the appropriate restoration of the sit","Nuisance from demolition and construction works is subject to control under The Control of Pollution Act 1974, the Clean Air Acts and other related legislation. In particular, you should ensure that the following are complied with:-","A. Demolition and construction works which are audible at the site boundary shall only be carried out between the hours of 08.00 and 18.00 hours Monday to Friday and between the hours of 08.00 hours and 13.00 hours on Saturday. No works shall be carried out on Sundays, Bank or Public Holidays.","B. All noise generated during such works shall be controlled in compliance with British Standard Code of Practice BS 5228:2009.","C. Dust emissions shall be controlled in compliance with the Mayor of London's Best Practice Guidance' The Control of dust and emissions from construction and demolition.","D. No bonfires that create dark smoke or nuisance to local residents.","You are advised to consult the Council's Environmental Protection Unit (www.hillingdon.gov.uk/nois","The decision to GRANT planning permission has been taken having regard to all relevant planning legislation, regulations, guidance, circulars and Council policies, including The Human Rights Act (1998) (HRA 1998) which makes it unlawful for the Council to act incompatibly with Convention rights, specifically Article 6 (right to a fair hearing); Article 8 (right to respect for private and family life); Article 1 of the First Protocol (protection of property) and Article 14 (prohibition of discrimination).","On this decision notice policies from the Councils Local Plan: Part 1 - Strategic Policies appear first, then relevant Local Plan Part 2 (2020), then London Plan Policies (2021). Hillingdon's Full Council adopted the Hillingdon Local Plan: Part 1 - Strategic Policies on 8 November 2012 and the Hillingdon Local Plan Part 2 on 16 January 2020."],"id":"Hillingdon-44104_APP_2026_1274","application_type":"All Other","pp_id":"14929973","parking_details":{"net_car":-53,"no_proposed_car":33,"net_cycle":0,"no_proposed_cycle":5,"no_existing_cycle":5,"no_existing_car":86},"url_planning_app":"http://planning.hillingdon.gov.uk/OcellaWeb/planningDetails?reference=44104/APP/2026/1274","appeal_status":null,"valid_date":"21/05/2026","site_number":null,"application_details":{"non_residential_details":{"total_gia_gained":0,"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_gia_lost":0,"total_gia_existing":4384,"total_non_resi_gross_internal_floor_area_to_be_lost":0},"garden_land_lost":false,"ownership_status":"Private","infrastructure_details":{"no_passive_fast_ev_charging_points":0,"total_annual_pm_emissions":0,"no_homes_to_have_electrical_heating":0,"no_homes_passive_cooling":0,"no_non_resi_units_to_have_full_fibre":0,"no_active_fast_ev_charging_points":5,"solar_pv_capacity":0.1,"total_annual_nox_emissions":0,"ghg_reduction_over_building_regulations":true,"mobile_network_operators_consultation":false,"no_new_gas_connections_required":0,"chp_heat_pumps_capacity":0.03,"percentage_demolition_construction_material_recycling":0,"waste_provision":true,"no_new_water_connections_required":0,"fire_suppression_system_proposed":false,"green_roof_area":0,"no_resi_units_to_have_full_fibre":0},"total_gia_lost":0,"scheme_phasing":true,"existing_proposed_floorspace_details":[{"gia_existing":4384,"use_class":"SpecifiedOther","gia_gained":0,"gia_lost":0}],"grey_water_reuse":false,"total_gia_existing":4384,"total_gia_gained":0,"phasing_details":[{"phase_detail":"Phase 1","intended_commencement_date":"07/2026","intended_completion_date":"12/2026"}],"affordable_housing_fast_track":false,"site_area":0.9400000000000001,"projected_cost_of_works":"Between £2m and £100m","rain_water_harvesting":false,"internal_resi_water_usage":0,"surface_water_discharge_percentage_reduction":0,"green_suds":false},"site_name":"UNIT 5","decision_process":"Delegated","postcode":null,"last_updated_by":"CSV Data Import","centroid":{"lat":51.506285,"lon":-0.438023},"polygon":null,"appeal_decision":null,"borough":"Hillingdon","last_synced":"2026-10-30T02:50:46.535Z","cil_liability":false,"subdivision_of_building":null,"development_type":null,"reference_no_of_permission_being_relied_on":null}