{"postcode":"","status":"Commenced","decision_agency":"Borough","subdivision_of_building":"Only refers to the current single storey side extension.","appeal_start_date":null,"cil_liability":false,"decision_conditions":["The development hereby permitted shall be begun before the expiration of three years from the date of this permission.","REASON","To comply with Section 91 of the Town and Country Planning Act 1990.","The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers:","- Location plan","- PL - 01","- PL - 03","- PL - 07","- 0242-PR-01 A","- 0242-PR-10 A","- 0242-PR-11 A","- 0242-PR-12 A","and shall thereafter be retained/maintained for as long as the development remains in existence.","REASON","To ensure the development complies with the provisions of the Hillingdon Local Plan Part 1 (2012), Part 2 (2020) and the London Plan (2021).","Notwithstanding the approved plans, development shall take place until a landscape scheme has been submitted to and approved in writing by the Local Planning Authority. The scheme shall include: -","1.    Details of Soft Landscaping","1.a  Planting plans (at not less than a scale of 1:100),","1.b  Written specification of planting and cultivation works to be undertaken,","1.c  Schedule of plants giving species, plant sizes, and proposed numbers/densities where appropriate","2. Details of Hard Landscaping","2.a Cycle Storage (2 no. spaces)","2.b Means of enclosure/boundary treatments","2.c Car Parking Layout (including the provision of 1 active 7kW electrical charging point)","2.d Hard Surfacing Materials","2.e Refuse storage","2.f External Lighting","3. Details of Landscape Maintenance","3a Landscape Maintenance Schedule for a minimum period of 5 years.","3.b Proposals for the replacement of any tree, shrub, or area of surfing/seeding within the landscaping scheme which dies or in the opinion of the Local Pla","The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building and shall thereafter be retained as such.","REASON","To safeguard the visual amenities of the area and to ensure that the proposed development does not have an adverse effect upon the appearance of the existing building in accordance with Policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020).","Access to the flat roof over the extension hereby approved shall be for maintenance or emergency purposes only and the flat roof shall not be used as a roof garden, terrace, balcony, patio or similar amenity area.","REASON","To prevent overlooking to adjoining properties in accordance with Policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020).","Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (as amended) (or any order revoking and re-enacting that Order with or without modification), no additional windows, doors or other openings shall be constructed in the walls or roof slopes of the development hereby approved.","REASON","To prevent overlooking to adjoining properties in accordance with Policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020).","Prior to occupation of the development hereby permitted, step free access shall be provided to the dwelling in accordance with approved drawing number 0242-PR-01 A. Such provision shall remain in place for the lifetime of the development.","REASON","To ensure housing of an inclusive design is achieved and maintained in accordance with Policies D5 and D7 of the London Plan (2021).","The dwelling hereby approved shall accord with the requirements of Policy D7 of the London Plan and shall not be occupied until certification of compliance with the technical specifications for an M4(2) dwelling, as set out in Approved Document M to the Building Regulations (2010) 2015, has been submitted to, and approved in writing, by the Local Planning Authority. All such provisions must remain in place for the life of the building.","REASON","To not only allow the Building Control body to require the development to comply with the optional Building Regulations standards, but to also ensure the appropriate quantity and standard of accessible and adaptable housing is constructed and maintained in accordance with Policy D7 of the London Plan (2021).","You are advised that if any part of the development hereby permitted encroaches by either its roof, walls, eaves, gutters, or foundations, then a new planning application may have to be submitted. The validity of this planning permission may be challengeable by third parties if the development results in any form of encroachment onto land outside the applicant's control for which the appropriate Notice under Article 13 of the Town and Country Planning (Development Management Procedure) (England) Order 2015 has not been served.","Nuisance from demolition and construction works is subject to control under The Control of Pollution Act 1974, the Clean Air Acts and other related legislation. In particular, you should ensure that the following are complied with:-","A. Demolition and construction works which are audible at the site boundary shall only be carried out between the hours of 08.00 and 18.00 hours Monday to Friday and between the hours of 08.00 hours and 13.00 hours on Saturday. No works shall be carried out on Sundays, Bank or Public Holidays.","B. All noise generated during such works shall be controlled in compliance with British Standard Code of Practice BS 5228:2009.","C. Dust emissions shall be controlled in compliance with the Mayor of London's Best Practice Guidance' The Control of dust and emissions from construction and demolition.","D. No bonfires that create dark smoke or nuisance to local residents.","You are advised to consult the Council's Environmental Protection Unit (www.hillingdon.gov.uk/nois","The Council will recover from the applicant the cost of highway and footway repairs, including damage to grass verges.","Care should be taken during the building works hereby approved to ensure no damage occurs to the verge or footpaths during construction. Vehicles delivering materials to this development shall not override or cause damage to the public footway. Any damage will require to be made good to the satisfaction of the Council and at the applicant's expense.","For further information and advice contact - Highways Maintenance Operations, Central Depot - Block K, Harlington Road Depot, 128 Harlington Road, Hillingdon, Middlesex, UB3 3EU (Tel: 01895 277524).","For Private Roads: Care should be taken during the building works hereby approved to ensure no damage occurs to the verge of footpaths on private roads during construction. Vehicles delivering materials to this development shall not override or cause damage to a private road and where possible alternative routes should be ta","The decision to GRANT planning permission has been taken having regard to all relevant planning legislation, regulations, guidance, circulars and Council policies, including The Human Rights Act (1998) (HRA 1998) which makes it unlawful for the Council to act incompatibly with Convention rights, specifically Article 6 (right to a fair hearing); Article 8 (right to respect for private and family life); Article 1 of the First Protocol (protection of property) and Article 14 (prohibition of discrimination).","The decision to GRANT planning permission has been taken having regard to the policies and proposals in the Hillingdon Local Plan Part 1 (2012) and Part 2 (2020) set out below, including Supplementary Planning Guidance, and to all relevant material considerations, including The London Plan (2021) and national guidance.","Under the terms of the Planning Act 2008 (as amended) and Community Infrastructure Levy Regulations 2010 (as amended), this development is liable to pay the London Borough of Hillingdon Community Infrastructure Levy (CIL) and the Mayor of London's Community Infrastructure Levy (CIL). This will be calculated in accordance with the London Borough of Hillingdon CIL Charging Schedule 2014 and the Mayor of London's CIL Charging Schedule 2012. Before commencement of works the development parties must notify the London Borough of Hillingdon of the commencement date for the construction works (by submitting a Commencement Notice) and assume liability to pay CIL (by submitting an Assumption of Liability Notice) to the Council at planning@hillingdon.gov.uk. The Council will then issue a Demand Notice setting out the date and the amount of CIL that is payable. Failure to submit a valid Assumption of Liability Notice and Commencement Notice prior to commencement of the development may result in su"],"actual_commencement_date":"27/04/2026","pp_id":"14339595","decision_target_date":"18/03/2026","valid_date":"25/11/2025","lpa_app_no":"46679/APP/2025/2424","locality":null,"appeal_decision_date":null,"parking_details":null,"decision_process":"Delegated","street_name":"YIEWSLEY","last_synced":"2026-07-31T02:03:46.275Z","site_number":null,"centroid_easting":506200.0,"polygon":{"type":"geometrycollection"},"ward":"YIEWSLEY 2022","centroid_northing":180726.0,"application_type":"All Other","uprn":null,"lapsed_date":"18/03/2029","actual_completion_date":null,"decision":"Approved","site_name":"67 OTTERFIELD ROAD","borough":"Hillingdon","last_date_consultation_comments":"06/03/2026","application_type_full":"Full planning permission","url_planning_app":"http://planning.hillingdon.gov.uk/OcellaWeb/planningDetails?reference=46679/APP/2025/2424","decision_date":"18/03/2026","bo_system":"Portal","development_type":null,"appeal_status":null,"date_building_work_completed_under_previous_permission":null,"description":"Erection of a 2 bed new dwelling with associated parking & bin store.","appeal_decision":null,"date_building_work_started_under_previous_permission":null,"epc_number":null,"last_updated":"2026-07-30T15:09:18.907Z","centroid":{"lon":-0.4709,"lat":51.515485},"lpa_name":"Hillingdon","secondary_street_name":null,"application_details":{"existing_uprns":[],"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"1 (full)","intended_commencement_date":"12/2025","intended_completion_date":"08/2026"}],"total_gia_gained":81.43,"site_area":0.054145,"total_gia_existing":172.73,"total_gia_lost":46.62,"existing_proposed_floorspace_details":[{"gia_existing":172.73,"use_class":"C4","gia_gained":0.0,"actual_commencement_date":"27/04/2026","gia_lost":46.62},{"gia_existing":0.0,"use_class":"C3","gia_gained":81.43,"actual_commencement_date":"27/04/2026","gia_lost":0.0}],"projected_cost_of_works":"Up to £2m","scheme_phasing":false,"rain_water_harvesting":false,"grey_water_reuse":false,"green_suds":false,"surface_water_discharge_percentage_reduction":0.0,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":81.43,"total_gia_existing":172.73,"total_gia_lost":46.62,"site_area":0.054145},"garden_land_lost":false,"residential_details":{"total_no_proposed_residential_units_shared_equity":0,"total_no_proposed_bedrooms":2.0,"total_no_proposed_residential_units":1,"total_no_proposed_residential_units_london_living_rent":0,"total_no_proposed_residential_affordable_units":0,"total_no_proposed_residential_units_affordable_rent":0,"total_no_existing_residential_units":0,"total_no_proposed_residential_units_discount_market_sale":0,"total_no_proposed_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_existing_residential_units_london_living_rent":0,"total_no_existing_residential_units_shared_equity":0,"total_no_existing_residential_units_market_for_sale":0,"total_no_existing_residential_units_intermediate":0,"total_no_proposed_residential_units_market_for_rent":0,"total_no_existing_residential_units_social_rent":0,"total_no_proposed_residential_units_self_build_and_custom_build":0,"total_no_existing_residential_units_discount_market_rent":0,"total_no_proposed_residential_units_market_for_sale":1,"total_no_existing_residential_affordable_units":0,"total_no_existing_residential_units_affordable_rent":0,"habitable_rooms_density":73.87570412780497,"total_no_existing_residential_units_london_shared_ownership":0,"total_gia_gained":81.43,"total_no_proposed_residential_units_social_rent":0,"total_no_existing_residential_units_london_affordable_rent":0,"dwelling_density":18.46892603195124,"total_no_existing_residential_units_discount_market_sale":0,"total_no_proposed_residential_units_starter_homes":0,"total_no_proposed_residential_units_london_affordable_rent":0,"total_gia_lost":0.0,"total_no_existing_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_existing_residential_units_starter_homes":0,"total_no_proposed_residential_units_discount_market_rent":0,"total_no_proposed_residential_units_intermediate":0,"affordable_percentage":0.0,"total_no_proposed_residential_units_london_shared_ownership":0,"residential_units":[{"description":null,"change_type":"Gain","unit_type":"Terraced Home","unit_development_type":"New Build","provider":"Private","no_habitable_rooms":4.0,"phase_detail":null,"unit_no":null,"actual_commencement_date":"27/04/2026","no_bedrooms":2.0,"provision_for_older_persons":false,"tenure":"Market for sale","gia":81.43}],"total_no_existing_residential_units_market_for_rent":0,"total_no_existing_residential_units_self_build_and_custom_build":0,"site_area":0.054145},"internal_resi_water_usage":0.0,"infrastructure_details":{"total_annual_pm_emissions":0.0,"green_roof_area":0.0,"no_resi_units_to_have_full_fibre":1.0,"no_new_water_connections_required":1.0,"no_homes_passive_cooling":0.0,"no_passive_fast_ev_charging_points":0.0,"no_non_resi_units_to_have_full_fibre":0.0,"total_annual_nox_emissions":0.0,"waste_provision":false,"percentage_demolition_construction_material_recycling":0.0,"no_active_fast_ev_charging_points":1.0,"no_homes_to_have_electrical_heating":0.0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":1.0,"ghg_reduction_over_building_regulations":false},"ownership_status":"Private","s106_agreement":false,"viability_assessment":false,"air_quality_assessment":false,"mayoral_cil_liability_notice_issued":false,"circular_economy_statement":false,"commencement_notice_received":false,"other_residential_accommodation_details":{"site_area":0.054145},"3d_model":false,"borough_cil_liability_notice_issued":false,"transport_impact_assessment":false},"wgs84_polygon":{"coordinates":[[[-0.470878,51.515498],[-0.470878,51.515471],[-0.470922,51.515472],[-0.470921,51.515499],[-0.470878,51.515498]]],"type":"Polygon"},"id":"Hillingdon-46679_APP_2025_2424","reference_no_of_permission_being_relied_on":null,"title_number":[],"last_updated_by":"Portal"}