{"postcode":null,"status":"Approved","decision_agency":"Borough","subdivision_of_building":null,"appeal_start_date":null,"cil_liability":false,"decision_conditions":["Condition 1 of planning consent reference 585/APP/2016/4504 is amended as follows:","The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers:","400101-BDP-16-00-DR-A-0010 Rev B","4985 001 Rev F","400101-BDP-16-00-DR-A-0011 Rev B","400101-BDP-16-XX-DR-A-0609 Rev B","400101-BDP-16-XX-DR-A-0701 Rev B","400101-BDP-16-XX-DR-A-0702 Rev B","400101-BDP-16-XX-DR-A-0703 Rev B","400101-BDP-16-XX-DR-A-0704 Rev B","400101-BDP-16-XX-DR-A-0705 Rev B","400101-BDP-16-XX-DR-A-0706 Rev A","400101-BDP-16-XX-DR-A-0707 Rev A","400101-BDP-16-XX-DR-A-0708 Rev A","400101-BDP-16-00-DR-A-0118 Rev C","400101-BDP-16-01-DR-A-0119 Rev C","400101-BDP-16-02-DR-A-0120 Rev C","400101-BDP-16-ELE-DR-A-0457","R9110-FBM-25-ZZ-DR-A-9628 Rev P1","R9110-FBM-23-ZZ-DR-A-9680 P2","R9110-FBM-23-ZZ-DR-A-9681 P2","R9110-FBM-23-ZZ-DR-A-9682 P2","R9110-FBM-23-ZZ-DR-A-9683 P2","R9110-FBM-23-ZZ-DR-A-9684 P2","R9110-FBM-23-ZZ-DR-A-9685 P2","400101-BDP-16-ELE-DR-A-0430 Rev B","R9110-FBM-23-ZZ-SH-A-9292","Condition 2 of planning consent reference 585/APP/2016/4504 is amended as follows:","The development hereby permitted shall not be occupied until the following has been completed in accordance with the specified supporting plans and/or documents:","Design and Access Statement Rev B 03.01.18","Planning Statement STMQ3006 - Rev 1","Planning Statement Addendum July 2021","Fire Engineering Planning Principles (Fire Strategy) F10314 Version 02 11/06/21","Internal Daylight and Sunlight Report P2777 V1 June2021","Landscape Management Specification 2683-MP-01 December 2016","Soft Landscape Specification 2683-SP-01 December 2016","Transport Statement December 2016","Transport Statement Spine Road June 2023","Transport Statement Addendum 2025","Thereafter the development shall be retained/maintained in accordance with these details for as long as the development remains in existence","REASON","To ensure the development complies with the provisions Hillingdon Local Plan Parts 1 (November 2012) and 2 (January 2020) and t"],"actual_commencement_date":null,"pp_id":"14551588","decision_target_date":"15/01/2026","valid_date":"18/12/2025","lpa_app_no":"585/APP/2025/3158","locality":null,"appeal_decision_date":null,"parking_details":null,"decision_process":"Delegated","street_name":"HILLINGDON ROAD","last_synced":"2026-04-10T02:50:21.671Z","site_number":null,"centroid_easting":506119.0,"polygon":null,"ward":"HILLINGDON WEST 2022","centroid_northing":183781.0,"application_type":"All Other","uprn":null,"lapsed_date":"09/01/2029","actual_completion_date":null,"decision":"Approved","site_name":"ST ANDREWS PARK","borough":"Hillingdon","last_date_consultation_comments":null,"application_type_full":"Non-Material Amendment","url_planning_app":"http://planning.hillingdon.gov.uk/OcellaWeb/planningDetails?reference=585/APP/2025/3158","decision_date":"09/01/2026","bo_system":"CSV Data Import","development_type":null,"appeal_status":null,"date_building_work_completed_under_previous_permission":null,"description":"Non-Material Amendment to planning permission reference 585/APP/2016/4504 dated 18/03/2022 to include the installation of a transformer associated with the Energy Centre in the basement of Block 1.","appeal_decision":null,"date_building_work_started_under_previous_permission":null,"epc_number":null,"last_updated":"2026-04-09T22:00:09.139Z","centroid":{"lon":-0.471147,"lat":51.542959},"lpa_name":"Hillingdon","secondary_street_name":"UXBRIDGE","application_details":{"existing_uprns":null},"wgs84_polygon":null,"id":"Hillingdon-585_APP_2025_3158","reference_no_of_permission_being_relied_on":null,"title_number":null,"last_updated_by":"CSV Data Import"}