{"actual_commencement_date":null,"date_building_work_completed_under_previous_permission":null,"lpa_name":"Hillingdon","subdivision_of_building":null,"appeal_decision":null,"lapsed_date":"04/08/2029","appeal_decision_date":null,"last_updated_by":"CSV Data Import","reference_no_of_permission_being_relied_on":null,"epc_number":null,"last_updated":"2026-11-02T23:00:08.167Z","url_planning_app":"http://planning.hillingdon.gov.uk/OcellaWeb/planningDetails?reference=6410/APP/2026/515","street_name":"NORTHWOOD","parking_details":null,"ward":"NORTHWOOD 2022","bo_system":"CSV Data Import","site_name":"17 DENE ROAD","site_number":17,"application_details":{"existing_uprns":null},"uprn":null,"locality":null,"date_building_work_started_under_previous_permission":null,"postcode":null,"valid_date":"27/02/2026","cil_liability":false,"actual_completion_date":null,"centroid":{"lat":51.613437,"lon":-0.428094},"centroid_easting":508936.0,"application_type_full":"Removal/Variation of a condition","pp_id":"14741049","lpa_app_no":"6410/APP/2026/515","polygon":null,"id":"Hillingdon-6410_APP_2026_515","appeal_status":null,"appeal_start_date":null,"description":"Variation of Condition 2 (approved drawings) of planning permission reference 73243/APP/2025/1523, dated 18-11-2025 (Variation of Condition 2 (approved drawings) of planning permission reference 73243/APP/2022/2535, dated 20-11-2024, for the 'Erection of 6 dwellings with new access to Foxdell and erection of 3 dwellings with new access to Dene Road with associated landscaping and parking'. Amendment seeks to vary the design of Plots 3-6, including repositioning of the building southwards, reduction in depth, increase in width, lowering the finished slab level by 700mm, addition of habitable attic accommodation with front-facing dormers and sky lights and increase in height, changes to fenestration and position of chimney stack and addition of solar panels to flat roof area.) to amend the design and scale of Plots 7-9 to increase the number of bedrooms from 2-bedroom to 3-bedroom dwellings, including increases to the footprint and height of the dwellings, installation of photovoltaic (PV) panels and rooflights, and associated amendments to private / shared amenity space and parking layout.","development_type":null,"decision_conditions":["The development hereby permitted shall be begun before the expiration of three years from the date of the original planning permission that was granted on 20th November 2024.","REASON","To comply with Section 91 of the Town and Country Planning Act 1990.","The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers:","22 GEDR SL1 A (Site Location Plan)","26 GEDR SP20E (Site Proposals to amend plots 7-9)","26 GEDR SP21C (Site Proposals with existing levels)","26 GEDR SP22C (Context Site Plan)","26 GEDR P7-9A (Plots 7-9 Plans and Elevations)","22GEDR P1 (Proposed Elevations and Floorplans Plot 1)","22GEDR P2 (Proposed Elevations and Floorplans Plot 2)","25 GEDR P3-6 Rev F (Proposed Elevations and Floorplans Plots 3-6)","22GEDR G1 Rev A (Proposed Garage Plot 1)","22GEDR G2 Rev A (Proposed Garage Plot 2)","22 GEDR SD1Rev A (Bin and Bike Store Plots 2-6 and Gates)","1192:L010 Dated 19 May 2026 (Landscape Plan)","22.31-001 Rev A (Swept Paths - Fire Appliances and 7.5 Tonne Box Van)","and shall thereafter be retained/maintained for as long as the development remains in existence.","REASON","To ensure the development complies with the provisions of The London Plan (2021) and the Hillingd","The development shall be carried out in accordance with the construction management plan details approved under the discharge of condition application reference 73243/APP/2024/3179, 03-11-25.","REASON","To safeguard the amenity of surrounding areas in accordance with Policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020).","The development hereby approved shall be carried out in accordance with the levels details approved under application ref. 73243/APP/2026/476 insofar as they relate to Plots 1-6.","Notwithstanding the above, prior to above ground construction of Plots 7-9, details of existing and proposed ground levels and finished floor levels for Plots 7-9 shall be submitted to and approved in writing by the Local Planning Authority. The submitted details shall demonstrate the relationship of the development to adjoining land levels, neighbouring properties and the wider site. Such levels shall be shown in relation to a fixed and know datum point. Thereafter the development shall not be carried out other than in accordance with the approved details.","REASON","To ensure that the development relates satisfactorily to adjoining properties in accordance with Policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020).","The development hereby approved shall be carried out in accordance with the materials approved under application ref. 73243/APP/2025/772 insofar as they relate to Plots 1 and 2, and the materials approved under application ref. 73243/APP/2026/476 insofar as they relate to Plots 3-6.","Notwithstanding the above, and prior to above ground construction of Plots 7-9, details and samples of all external materials and finishes for Plots 7-9 shall be submitted to and approved in writing by the Local Planning Authority. Details shall include manufacturer/supplier information, product type/code and RAL colour where relevant. Samples shall be made available on site for inspection. Such details shall include, but not be limited to:","a. Brickwork (including details on bond, pointing, mortar mix)","b. Cladding and elevational treatments","c. Roof tiles","d. Windows and Doors (including details on materials, form and glazing)","e. Soffit/ fascias","f. Guttering and downpipes","g. Photovoltaic panels.","The develo","The development shall be carried out in accordance with the contamination details approved under the partial discharge of Condition 6(i)(a-c) pursuant to application reference 73243/APP/2025/813.","Prior to the commencement of development of Plots 7-9, a report shall be submitted to and approved in writing by the Local Planning Authority demonstrating whether any land affected by the revised footprints of Plots 7-9 has been previously investigated for contamination. Where any part of the revised development area has not been previously investigated, additional site investigation works shall be undertaken and the results submitted to the Local Planning Authority. Where necessary, an updated remediation strategy shall also be submitted to and approved in writing by the Local Planning Authority.","No deviation shall be made from the approved remediation scheme without the prior written approval of the Local Planning Authority.","(ii) If during remedial or development works, contamination not","The development hereby approved shall be carried out strictly in accordance with the  sustainable water management and drainage details specified in the Drainage Strategy, dated August 2022, Reference 221526/DS/JR/RS/01, Rev A by Lanmor Consulting.","REASON","To ensure the development does not increase the risk of flooding in accordance with Policies SI 12 and SI 13 of The London Plan (2021) and Policies DMEI 9 and DMEI 10 of the Hillingdon Local Plan Part 2 (2020).","The development hereby approved shall be implemented in accordance with the following water efficiency standards. The dwellings labelled Units 3 to 6 shall achieve water efficiency standards of no more than 105 litres per person per day maximum water consumption. The dwellings at plots 1, 2, 7, 8 and 9 shall achieve water efficiency standards of no more than 110 litres per person per day maximum water consumption (to include a fixed factor of water for outdoor use of 5 litres per person per day in accordance with the operational requirement defined within Approved Document G of the Building Regulations).","REASON","In the interest of water efficiency in accordance with Policy DMEI 10 of the Hillingdon Local Plan Part 2 (2020).","Notwithstanding the approved drawings and prior to any works on site above damp proof course level, a full landscape scheme and details shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall take into account the sensitive heritage nature of the site and include:","1.    Details of Soft Landscaping","1.a  Planting plans at not less than a scale of 1:100 (including details of location, specimen and size of at least 85 proposed replacement trees, and shall include high carbon-absorbing varieties)","1.b  Written specification of planting and cultivation works to be undertaken,","1.c  Schedule of plants giving species, plant sizes, and proposed numbers/densities where appropriate","2. Details of Hard Landscaping","2.a Refuse Storage","2.b Cycle Storage (including long and short stay spaces in compliance with Policy T5 of the London Plan)","2.c Means of enclosure/boundary treatments","2.d Car Parking Layouts (including 2 active and 11 passive electric vehicle charg","Prior to commencement of superstructure works, a scheme for the enhancement of ecology shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall set out how the development will contribute positively to ecological value through the use of features and measures within the landscaping (i.e. nectar rich and diverse planting including living walls and/or roofs) and the fabric of the new built form (i.e. bat and bird boxes). The scheme shall include a plan with the features annotated and the development must be built and operated in accordance with the approved scheme.","REASON","To ensure the development contributes positively to the ecological value of the area in accordance with Policies G6 and G7 of The London Plan (2021), Policy EM7 of the Hillingdon Local Plan: Part 1 (2012), and Policy DMEI 7 of the Hillingdon Local Plan Part 2 (2020).","The development hereby approved shall be carried out in accordance with: the arboricultural details approved under discharge of condition application reference 73243/APP/2025/290; and the Phase II Arboricultural Impact Assessment (Ref. 101190a, revised 21/05/2026) prepared by Arbol EuroConsulting, including the revised Tree Protection Plan and Arboricultural Method Statement.","All tree protection measures, including protective fencing and construction exclusion zones, shall be installed prior to the commencement of development and retained for the duration of construction works in accordance with the approved details.","REASON","To ensure that trees and other vegetation are retained and adequately protected during construction works and to ensure that the development accords with Policy G7 of the London Plan (2021) and Policy DMHB 14 of the Hillingdon Local Plan: Part Two - Development Management Policies (2020).","Trees, hedges and shrubs shown to be retained on the approved plan(s) shall not be damaged, uprooted, felled, lopped or topped without the prior written consent of the Local Planning Authority. If any retained tree, hedge or shrub is removed or severely damaged during (or after) construction, or is found to be seriously diseased or dying, another tree, hedge or shrub shall be planted at the same place or, if planting in the same place would leave the new tree, hedge or shrub susceptible to disease, then the planting should be in a position and shall be of a size and species to be agreed in writing by the Local Planning Authority and shall be planted in the first planting season following the completion of the development or the occupation of the buildings, whichever is the earlier.","Where damage is less severe, a schedule of remedial works necessary to ameliorate the effect of damage by tree surgery, feeding or groundwork shall be agreed in writing with the Local Planning Authority. N","For the lifetime of the development hereby permitted the rating level of noise caused by the operation of the ground source heat pumps and air source heat pumps shall be below 35 dB(A) measured 1 metre outside of any window of any dwelling, or similarly noise sensitive premises, determined in accordance with the procedures set out in British Standard BS4142:2014.","REASON","In order to safeguard the amenities of adjoining residential occupiers in accordance with Policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020).","The residential units hereby approved shall not be occupied until a parking allocation scheme in relation to proposed dwellings titled as Units 3 to 9 on the approved drawings has been submitted to, and approved in writing by, the Local Planning Authority. The parking allocation scheme shall, as a minimum, include a requirement that all on-site car parking shall be allocated and dedicated for the use of each of the residential units hereby approved and shall remain allocated and dedicated in such a manner for the life-time of the development.","REASON","To ensure that an appropriate level of car parking provision is provided on site in accordance with Policy T6 of The London Plan (2021) and Policy DMT 6 of the Hillingdon Local Plan Part Two 2 (2020).","The vehicle access from Dene Road shall conform to the dimensions specified in the council's 'Domestic Vehicle Footway Crossover' (2022). Specifically, the crossover shall have a maximum width of 5m at the back of footway and 6.2m at the edge of kerb.","REASON","In the interests of highway and pedestrian safety in accordance with Policy DMT 2 of the Hillingdon Local Plan Part 2 (2020).","Prior to first occupation of the development hereby approved, a refuse management collection plan shall be submitted to the local planning authority for approval in writing. This shall include refuse collection area/s on site and arrangements/commitment for refuse and recycling to be deposited at the collection area on the collection day. The development shall be carried out in accordance with the approved refuse management plan.","REASON","To ensure that appropriate waste management collection arrangements is accommodated on site in accordance with Policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020).","The development shall be carried out in accordance with the step-free access details approved under application reference 73243/APP/2026/476 insofar as they relate to Plots 3-6.","Prior to above ground construction of Plots 1-2 and Plots 7-9, details demonstrating step-free access to the principal entrance of each dwelling shall be submitted to and approved in writing by the Local Planning Authority. The approved details shall ensure that the dwellings are accessible to all users and shall be implemented prior to first occupation of the respective dwellings and retained thereafter.","REASON","To ensure housing of an inclusive design is achieved and maintained in accordance with Policies D5 and D7 of The London Plan (2021).","The ground floor flat titled Unit 3 on the approved plans shall not be occupied until certification of compliance with the technical specifications for an M4(3) dwelling, as set out in Approved Document M to the Building Regulations (2010) 2015 has been obtained. All such provisions must remain in place for the life of the buildings.","REASON","To not only allow the Building Control body to require the development to comply with the optional Building Regulations standards, but to also ensure the appropriate quantity and standard of accessible and adaptable housing is constructed and maintained in accordance with Policies D5 and  D7 of The London Plan (2021).","The residential dwellings titled Plots/Units 1, 2, 4, 7, 8, and 9 on the approved plans shall not be occupied until certification of compliance with the technical specifications for an M4(2) dwelling, as set out in Approved Document M to the Building Regulations (2010) 2015, has been obtained. All such provisions must remain in place for the life of the buildings.","REASON","To not only allow the Building Control body to require the development to comply with the optional Building Regulations standards, but to also ensure the appropriate quantity and standard of accessible and adaptable housing is constructed and maintained in accordance with Policies D5 and  D7 of The London Plan (2021).","The following first floor side elevation windows and side rooflights shall be glazed with permanently obscured glass to at least scale 4 on the Pilkington scale and be non-opening below a height of 1.8 metres taken from internal finished floor level for so long as the development remains in existence:","- The first floor side elevation windows and side rooflights of the dwelling on Plot 2 facing No. 5C Vantage Mews and 17 Green End;","- The first floor windows and rooflights on the west-facing side elevation of the building serving Units 3-6 facing No. 3 Foxdell;","- The first floor window on the east-facing side elevation of the dwelling on Plot 7 facing 17 Dene Road; and","- The first floor window on the west-facing side elevation of the dwelling on Plot 9 facing No. 1 Foxdell.","REASON","To prevent overlooking to adjoining properties in accordance with Policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020).","The development hereby approved shall achieve 'Secured by Design' accreditation awarded by the Hillingdon Metropolitan Police Crime Prevention Design Adviser (CPDA) on behalf of the Association of Chief Police Officers (ACPO). No dwelling shall be occupied until accreditation has been achieved.","REASON","In pursuance of the Council's duty under section 17 of the Crime and Disorder Act 1998 to consider crime and disorder implications in excising its planning functions; to promote the well being of the area in pursuance of the Council's powers under section 2 of the Local Government Act 2000, to ensure the development provides a safe and secure environment in accordance with Policy DMHB 15 of the Local Plan Part 2 (2020).","Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no additional windows, doors or other openings shall be constructed in the walls or roof slopes of the development hereby approved.","REASON","To prevent overlooking to adjoining properties in accordance with Policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020).","Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (or any order revoking and re-enacting that Order with or without modification); no garage(s), shed(s) or other outbuilding(s), nor extension or roof alteration to any dwellinghouse(s) shall be erected without the grant of further specific permission from the Local Planning Authority.","REASON","To protect the character and appearance of the area and amenity of residential occupiers in accordance with Policies DMHB 11 and DMHD 2 of the Hillingdon Local Plan Part 2 (2020).","Nuisance from demolition and construction works is subject to control under The Control of Pollution Act 1974, the Clean Air Acts and other related legislation. In particular, you should ensure that the following are complied with:-","A. Demolition and construction works which are audible at the site boundary shall only be carried out between the hours of 08.00 and 18.00 hours Monday to Friday and between the hours of 08.00 hours and 13.00 hours on Saturday. No works shall be carried out on Sundays, Bank or Public Holidays.","B. All noise generated during such works shall be controlled in compliance with British Standard Code of Practice BS 5228:2009.","C. Dust emissions shall be controlled in compliance with the Mayor of London's Best Practice Guidance' The Control of dust and emissions from construction and demolition.","D. No bonfires that create dark smoke or nuisance to local residents.","You are advised to consult the Council's Environmental Protection Unit (www.hillingdon.gov.uk/nois","In dealing with the application the Council has implemented the requirement in the National Planning Policy Framework to work with the applicant in a positive and proactive way. We have made available detailed advice in the form of our statutory policies from Local Plan Part 1, Local Plan Part 2, Supplementary Planning Documents, Planning Briefs and other informal written guidance, as well as offering a full pre-application advice service, in order to ensure that the applicant has been given every opportunity to submit an application which is likely to be considered favourably.","Under the terms of the Planning Act 2008 (as amended) and Community Infrastructure Levy Regulations 2010 (as amended), this development is liable to pay the London Borough of Hillingdon Community Infrastructure Levy (CIL) and the Mayor of London's Community Infrastructure Levy (CIL). This will be calculated in accordance with the London Borough of Hillingdon CIL Charging Schedule 2014 and the Mayor of London's CIL Charging Schedule 2012. Before commencement of works the development parties must notify the London Borough of Hillingdon of the commencement date for the construction works (by submitting a Commencement Notice) and assume liability to pay CIL (by submitting an Assumption of Liability Notice) to the Council at planning@hillingdon.gov.uk. The Council will then issue a Demand Notice setting out the date and the amount of CIL that is payable. Failure to submit a valid Assumption of Liability Notice and Commencement Notice prior to commencement of the development may result in su","The decision to GRANT planning permission has been taken having regard to all relevant planning legislation, regulations, guidance, circulars and Council policies, including The Human Rights Act (1998) (HRA 1998) which makes it unlawful for the Council to act incompatibly with Convention rights, specifically Article 6 (right to a fair hearing); Article 8 (right to respect for private and family life); Article 1 of the First Protocol (protection of property) and Article 14 (prohibition of discrimination).","The decision to GRANT planning permission has been taken having regard to the policies and proposals in the Hillingdon Local Plan Part 1 (2012) and Part 2 (2020) set out below, including Supplementary Planning Guidance, and to all relevant material considerations, including The London Plan (2021) and national guidance.","The Council will recover from the applicant the cost of highway and footway repairs, including damage to grass verges.","Care should be taken during the building works hereby approved to ensure no damage occurs to the verge or footpaths during construction. Vehicles delivering materials to this development shall not override or cause damage to the public footway. Any damage will require to be made good to the satisfaction of the Council and at the applicant's expense.","For further information and advice contact - Highways Maintenance Operations, Central Depot - Block K, Harlington Road Depot, 128 Harlington Road, Hillingdon, Middlesex, UB3 3EU (Tel: 01895 277524).","For Private Roads: Care should be taken during the building works hereby approved to ensure no damage occurs to the verge of footpaths on private roads during construction. Vehicles delivering materials to this development shall not override or cause damage to a private road and where possible alternative routes should be ta","Care should be taken during the building works hereby approved to ensure no damage occurs to the verge of footpaths on private roads during construction. Vehicles delivering materials to this development shall not override or cause damage to a private road and where possible alternative routes should be taken to avoid private roads. The applicant may be required to make good any damage caused.","Wildlife and Countryside Act 1981: Note that it is an offence under this act to disturb roosting bats, nesting birds or any other protected species.  Therefore, if applicable, it is advisable to consult your tree surgeon / consultant to agree an acceptable time for carrying out the approved works."],"last_synced":"2026-11-03T02:50:57.197Z","secondary_street_name":null,"title_number":null,"last_date_consultation_comments":"02/06/2026","decision_process":"Delegated","centroid_northing":191682.0,"borough":"Hillingdon","decision":"Approved","application_type":"All Other","wgs84_polygon":{"coordinates":[[[-0.427705,51.613616],[-0.427706,51.613589],[-0.427749,51.61359],[-0.427748,51.613617],[-0.427705,51.613616]]],"type":"Polygon"},"decision_agency":"Borough","decision_target_date":"04/08/2026","status":"Approved","decision_date":"04/08/2026"}