{"postcode":"","status":"Approved","decision_agency":"Borough","subdivision_of_building":null,"appeal_start_date":null,"cil_liability":false,"decision_conditions":["The development hereby permitted shall be begun before the expiration of three years from the date of this permission.","REASON","To comply with Section 91 of the Town and Country Planning Act 1990.","The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers:","- Rbl-PLN-0925-01c","- Rbl-PLN-0925-03c","- Rbl-PLN-0925-04b","- Rbl-PLN-0925-05c","- Rbl-PLN-0925-06b","- Rbl-PLN-0925-07","- Rbl-PLN-0925-09b","- Rbl-PLN-0925-10a","and shall thereafter be retained/maintained for as long as the development remains in existence.","REASON","To ensure the development complies with the provisions Hillingdon Local Plan Parts 1 (November 2012) and 2 (January 2020) and the London Plan (2021).","The development hereby permitted shall not be occupied until the following has been completed in accordance with the specified supporting plans and/or documents:","- Energy Statement, Version 2 - 08.12.25,  Building Compliance Assessments","- Flood Risk Assessment, 10 October 2025, Revision: 02, SLR","- Installation Floodlights and Bulkheads, 14.10.2025, DJW Electrical Engineering Ltd","Thereafter the development shall be retained/maintained in accordance with these details for as long as the development remains in existence","REASON","To ensure the development complies with the provisions Hillingdon Local Plan Parts 1 (November 2012) and 2 (January 2020) and the London Plan (2021).","The development hereby permitted, shall not be occupied until the cycle storage has been provided in accordance with the approved plans (drawing reference numbers Rbl-PLN-0925-03c and Rbl-PLN-0925-07). Thereafter, these facilities shall be permanently retained on site and be kept available for the use of cyclists.","REASON","To ensure the provision and retention of facilities for cyclists to the development and hence the availability of sustainable forms of transport to the site in accordance with Policy DMT 5 of the Hillingdon Local Plan Part 2 (2020).","The development hereby permitted shall be used only for purposes ancillary to the main use of the Waste Transfer Station for the maintenance of waste collection vehicles associated with the waste transfer use and shall not be used at any time for any separate use.","REASON","For the avoidance of doubt and to protect the integrity and effectiveness of the strategic industrial location in accordance with Policy DME 1 of the Local Plan Part 2 (2020) and Policy E5 of the London Plan (2021).","Between the hours of 21:00 to 07:00 daily, the exterior lighting shall be switched to a movement sensor-based setting.","REASON","To safeguard the amenity of surrounding areas in accordance with Policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020).","(i) The development shall not commence until a scheme to deal with contamination has been submitted to and approved by the Local Planning Authority (LPA). All works which form part of any required remediation scheme shall be completed before any part of the development is occupied or brought into use unless the Local Planning Authority dispenses with any such requirement specifically and in writing. The scheme shall include the following measures unless the LPA dispenses with any such requirement specifically and in writing:","(a) A site investigation, including where relevant soil, soil gas, surface water, and groundwater sampling, together with the results of analysis and risk assessment shall be carried out by a suitably qualified and accredited consultant/contractor. The report should also clearly identify all risks, limitations, and recommendations for remedial measures to make the site suitable for the proposed use; and","(b) A written method statement providing details of the reme","Notwithstanding the approved plans, prior to development commencing, the applicant shall submit an updated Construction and Environment Management Plan to the Local Planning Authority in consultation with the Canal and River Trust for its approval.  The updated plan shall detail:","(i)  The phasing of development works","(ii) The hours during which development works will occur (please refer to informative 'Control of Environmental Nuisance from Construction Work' for maximum permitted working hours).","(iii) A programme to demonstrate that the most valuable or potentially contaminating materials and fittings can be removed safely and intact for later re-use or processing. (in conjunction with condition 7)","(iv) Measures to prevent mud and dirt tracking onto footways and adjoining roads (including wheel washing facilities).","(v) Traffic management and access arrangements (vehicular and pedestrian) and parking provisions for contractors during the development process (including measures to redu","Nuisance from demolition and construction works is subject to control under The Control of Pollution Act 1974, the Clean Air Acts and other related legislation. In particular, you should ensure that the following are complied with:-","A. Demolition and construction works which are audible at the site boundary shall only be carried out between the hours of 08.00 and 18.00 hours Monday to Friday and between the hours of 08.00 hours and 13.00 hours on Saturday. No works shall be carried out on Sundays, Bank or Public Holidays.","B. All noise generated during such works shall be controlled in compliance with British Standard Code of Practice BS 5228:2009.","C. Dust emissions shall be controlled in compliance with the Mayor of London's Best Practice Guidance' The Control of dust and emissions from construction and demolition.","D. No bonfires that create dark smoke or nuisance to local residents.","You are advised to consult the Council's Environmental Protection Unit (www.hillingdon.gov.uk/nois","The applicant is advised that any surface water discharge to the waterway will require prior consent from  the Canal & River Trust. As the Trust is not a land drainage authority, such discharges are not granted as of right-where they are granted, they will usually be subject to completion of a commercial agreement. Please contact utilitiesenqiry@canalrivertrust.org.uk with any queries","The Equality Act 2010 aims to safeguard individuals accessing goods, facilities, and services from discrimination based on a 'protected characteristic', including disability. In accordance with the Act, service providers must enhance access to and within their premises, especially when reasonable adjustments are feasible and straightforward to implement. The Act mandates that service providers proactively identify and eliminate barriers hindering disabled people.","Soakaways / attenuation ponds / septic tanks etc, as a means of storm/surface water disposal must not be constructed near/within 5 metres of Network Rail's boundary or at any point which could adversely affect the stability of Network Rail's property/infrastructure. Storm/surface water must not be discharged onto Network Rail's property or into Network Rail's culverts or drains. Network Rail's drainage system(s) are not to be compromised by any work(s). Suitable drainage or other works must be provided and maintained by the Developer to prevent surface water flows or run-off onto Network Rail's property / infrastructure. Ground levels - if altered, to be such that water flows away from the railway. Drainage does not show up on Buried service checks.","The developers should be made aware that Network Rail needs to be consulted on any alterations to ground levels. No excavations should be carried out near railway embankments, retaining walls or bridges.","Network Rail offers no right of support to the development. Where foundation works penetrate Network Rail's support zone or ground displacement techniques are used the works will require specific approval and careful monitoring by Network Rail. There should be no additional loading placed on the cutting and no deep continuous excavations parallel to the boundary without prior approval.","The design and siting of buildings should take into account the possible effects of noise and vibration and the generation of airborne dust resulting from the operation of the railway.","Under the terms of the Planning Act 2008 (as amended) and Community Infrastructure Levy Regulations 2010 (as amended), this development is liable to pay the London Borough of Hillingdon Community Infrastructure Levy (CIL) and the Mayor of London's Community Infrastructure Levy (CIL). This will be calculated in accordance with the London Borough of Hillingdon CIL Charging Schedule 2014 and the Mayor of London's CIL Charging Schedule 2012. Before commencement of works the development parties must notify the London Borough of Hillingdon of the commencement date for the construction works (by submitting a Commencement Notice) and assume liability to pay CIL (by submitting an Assumption of Liability Notice) to the Council at planning@hillingdon.gov.uk. The Council will then issue a Demand Notice setting out the date and the amount of CIL that is payable. Failure to submit a valid Assumption of Liability Notice and Commencement Notice prior to commencement of the development may result in su"],"actual_commencement_date":null,"pp_id":"14285318","decision_target_date":"09/01/2026","valid_date":"13/11/2025","lpa_app_no":"643/APP/2025/2809","locality":null,"appeal_decision_date":null,"parking_details":null,"decision_process":"Delegated","street_name":"RIGBY LANE","last_synced":"2026-05-13T03:18:34.643Z","site_number":null,"centroid_easting":508221.0,"polygon":{"type":"geometrycollection"},"ward":"HAYES TOWN 2022","centroid_northing":179757.0,"application_type":"All Other","uprn":null,"lapsed_date":"09/01/2029","actual_completion_date":null,"decision":"Approved","site_name":"SUEZ Waste Transfer Station - land to south of","borough":"Hillingdon","last_date_consultation_comments":"09/12/2025","application_type_full":"Full planning permission","url_planning_app":"http://planning.hillingdon.gov.uk/OcellaWeb/planningDetails?reference=643/APP/2025/2809","decision_date":"09/01/2026","bo_system":"Portal","development_type":null,"appeal_status":null,"date_building_work_completed_under_previous_permission":null,"description":"Addition of an ancillary workshop and associated infrastructure for the maintenance of waste collection vehicles.","appeal_decision":null,"date_building_work_started_under_previous_permission":null,"epc_number":null,"last_updated":"2026-05-12T09:18:08.231Z","centroid":{"lon":-0.442083,"lat":51.506392},"lpa_name":"Hillingdon","secondary_street_name":"HAYES","application_details":{"existing_uprns":[],"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"Entire Development","intended_commencement_date":"02/2026","intended_completion_date":"07/2026"}],"total_gia_gained":482.4,"site_area":0.0565,"total_gia_existing":0.0,"total_gia_lost":0.0,"existing_proposed_floorspace_details":[{"gia_existing":0.0,"use_class":"B2","gia_gained":482.4,"gia_lost":0.0}],"projected_cost_of_works":"Up to £2m","scheme_phasing":false,"rain_water_harvesting":false,"grey_water_reuse":false,"building_details":[{"no_storeys":2.0,"max_height":9.2,"building_ref":"vehicle workshop"}],"green_suds":false,"surface_water_discharge_percentage_reduction":0.0,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":482.4,"total_non_resi_gross_internal_floor_area_to_be_lost":0.0,"total_gia_gained":482.4,"total_gia_existing":0.0,"total_gia_lost":0.0,"site_area":0.0565},"garden_land_lost":false,"internal_resi_water_usage":0.0,"infrastructure_details":{"total_annual_pm_emissions":0.0,"green_roof_area":0.0,"no_resi_units_to_have_full_fibre":0.0,"solar_pv_capacity":0.0,"no_new_water_connections_required":0.0,"no_homes_passive_cooling":0.0,"no_non_resi_units_to_have_full_fibre":1.0,"total_annual_nox_emissions":0.0,"waste_provision":false,"percentage_demolition_construction_material_recycling":0.0,"no_homes_to_have_electrical_heating":0.0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0.0,"ghg_reduction_over_building_regulations":false,"chp_heat_pumps_capacity":0.01,"waste_details":[{"external_dry_recycling":false,"external_food_waste":false,"unit_reference":"workshop","external_residual_waste":false,"reason_for_no_provision":"waste/refuse arrangements would be carried out in conjunction with existing arrangement for the wider site. This has been confirmed as acceptable by Hillingdon Council planners as part of the pre-application process ","internal_residual_waste":true,"internal_food_waste":true,"internal_dry_recycling":true}]},"ownership_status":"Private","lead_developer_company_name":"SUEZ Recycling and Recovery UK Ltd","s106_agreement":false,"viability_assessment":false,"air_quality_assessment":false,"mayoral_cil_liability_notice_issued":false,"commencement_notice_received":false,"circular_economy_statement":false,"other_residential_accommodation_details":{"site_area":0.0565},"3d_model":false,"borough_cil_liability_notice_issued":false,"transport_impact_assessment":false,"residential_details":{"total_no_proposed_residential_units_shared_equity":0,"total_no_proposed_bedrooms":0,"total_no_proposed_residential_units_london_living_rent":0,"total_no_proposed_residential_units":0,"total_no_existing_residential_units":0,"total_no_proposed_residential_units_affordable_rent":0,"total_no_proposed_residential_affordable_units":0,"total_no_proposed_residential_units_discount_market_sale":0,"total_no_proposed_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_existing_residential_units_london_living_rent":0,"total_no_existing_residential_units_market_for_sale":0,"total_no_existing_residential_units_shared_equity":0,"total_no_existing_residential_units_intermediate":0,"total_no_proposed_residential_units_market_for_rent":0,"total_no_existing_residential_units_social_rent":0,"total_no_proposed_residential_units_self_build_and_custom_build":0,"total_no_existing_residential_units_discount_market_rent":0,"total_no_proposed_residential_units_market_for_sale":0,"total_no_existing_residential_affordable_units":0,"habitable_rooms_density":0,"total_no_existing_residential_units_affordable_rent":0,"total_no_existing_residential_units_london_shared_ownership":0,"total_gia_gained":482.4,"total_no_proposed_residential_units_social_rent":0,"total_no_existing_residential_units_london_affordable_rent":0,"dwelling_density":0,"site_area":0.0565,"total_no_proposed_residential_units_starter_homes":0,"total_gia_lost":0.0,"total_no_proposed_residential_units_london_affordable_rent":0,"total_no_existing_residential_units_discount_market_sale":0,"total_no_existing_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_existing_residential_units_starter_homes":0,"total_no_proposed_residential_units_discount_market_rent":0,"total_no_proposed_residential_units_intermediate":0,"affordable_percentage":0,"total_no_proposed_residential_units_london_shared_ownership":0,"total_no_existing_residential_units_market_for_rent":0,"total_no_existing_residential_units_self_build_and_custom_build":0}},"wgs84_polygon":{"coordinates":[[[-0.442061,51.506406],[-0.442062,51.506379],[-0.442105,51.506379],[-0.442104,51.506406],[-0.442061,51.506406]]],"type":"Polygon"},"id":"Hillingdon-643_APP_2025_2809","reference_no_of_permission_being_relied_on":null,"title_number":[],"last_updated_by":"Portal"}