{"decision":"Approved","postcode":"UB10 9AG","decision_agency":"Borough","last_date_consultation_comments":"03/02/2026","centroid_easting":508200.0,"decision_target_date":"23/04/2026","parking_details":{"no_existing_car":4,"net_car":0,"no_proposed_car":4},"actual_completion_date":null,"epc_number":null,"appeal_decision_date":null,"site_name":"LAND FORMING PART OF","application_type_full":"Full planning permission","description":"Erection of 1no. semi detached dwellinghouse including landscaping, parking, bin and cycle storage, and the erection of a part single part two storey rear extension and rear dormer to No. 155 Granville Road, Uxbridge.","appeal_status":null,"application_type":"All Other","ward":"HILLINGDON EAST 2022","pp_id":"14193182","appeal_decision":null,"uprn":null,"last_synced":"2026-07-21T02:27:04.862Z","centroid":{"lat":51.54936,"lon":-0.440918},"appeal_start_date":null,"date_building_work_started_under_previous_permission":null,"locality":null,"lapsed_date":"21/04/2029","bo_system":"CSV Data Import","secondary_street_name":"HILLINGDON","subdivision_of_building":"Rear extension to ground and first floor, loft conversion to existing dwelling house. The existing dwelling house remains and the land has been divided as part of the proposal.","last_updated_by":"CSV Data Import","status":"Approved","url_planning_app":"http://planning.hillingdon.gov.uk/OcellaWeb/planningDetails?reference=71395/APP/2025/1999","lpa_app_no":"71395/APP/2025/1999","valid_date":"13/01/2026","application_details":{"existing_uprns":null,"site_area":0.03655,"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"1","intended_completion_date":"01/2027","intended_commencement_date":"01/2026"}],"total_gia_gained":158,"total_gia_lost":0,"total_gia_existing":110.6,"existing_proposed_floorspace_details":[{"gia_existing":110.6,"use_class":"C3","gia_gained":158,"gia_lost":0}],"projected_cost_of_works":"Up to £2m","occupation_status":"Occupied","scheme_phasing":true,"rain_water_harvesting":true,"grey_water_reuse":false,"green_suds":true,"surface_water_discharge_percentage_reduction":50,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":158,"total_gia_lost":0,"total_gia_existing":110.6},"garden_land_lost":true,"residential_details":{"total_no_proposed_residential_units_shared_equity":0,"total_no_proposed_bedrooms":3,"total_no_proposed_residential_units":1,"total_no_proposed_residential_units_london_living_rent":0,"total_no_proposed_residential_affordable_units":1,"total_no_existing_residential_units":0,"total_no_proposed_residential_units_affordable_rent":0,"total_no_proposed_residential_units_discount_market_sale":0,"total_no_proposed_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_existing_residential_units_london_living_rent":0,"total_no_existing_residential_units_shared_equity":0,"total_no_existing_residential_units_market_for_sale":0,"total_no_existing_residential_units_intermediate":0,"total_no_proposed_residential_units_market_for_rent":0,"total_no_existing_residential_units_social_rent":0,"total_no_proposed_residential_units_self_build_and_custom_build":1,"total_no_existing_residential_units_discount_market_rent":0,"total_no_proposed_residential_units_market_for_sale":0,"total_no_existing_residential_affordable_units":0,"total_no_existing_residential_units_affordable_rent":0,"habitable_rooms_density":null,"total_no_existing_residential_units_london_shared_ownership":0,"total_gia_gained":126.5,"total_no_proposed_residential_units_social_rent":0,"total_no_existing_residential_units_london_affordable_rent":0,"dwelling_density":0,"total_no_proposed_residential_units_london_affordable_rent":0,"total_no_existing_residential_units_discount_market_sale":0,"total_no_proposed_residential_units_starter_homes":0,"total_no_existing_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_existing_residential_units_starter_homes":0,"total_no_proposed_residential_units_discount_market_rent":0,"total_no_proposed_residential_units_intermediate":0,"affordable_percentage":100.0,"total_no_proposed_residential_units_london_shared_ownership":0,"residential_units":[{"m43_2b_compliant":false,"m43_2a_compliant":false,"m42_compliant":true,"change_type":"Gain","garden_land":false,"sheltered_accommodation":false,"unit_type":"Terraced Home","no_habitable_rooms":5,"provider":"Self-Build","no_bedrooms":3,"provision_for_older_persons":false,"tenure":"Self-Build and Custom Build","gia":126.5}],"total_no_existing_residential_units_market_for_rent":0,"total_no_existing_residential_units_self_build_and_custom_build":0},"infrastructure_details":{"total_annual_pm_emissions":4,"no_resi_units_to_have_full_fibre":2,"green_roof_area":0,"urban_greening_factor_score":0.47,"no_homes_passive_cooling":0,"no_new_water_connections_required":1,"no_passive_fast_ev_charging_points":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":4,"waste_provision":true,"percentage_demolition_construction_material_recycling":40,"no_active_fast_ev_charging_points":4,"no_homes_to_have_electrical_heating":2,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"ghg_reduction_over_building_regulations":true},"internal_resi_water_usage":110,"ownership_status":"Private"},"decision_process":"Delegated","lpa_name":"Hillingdon","id":"Hillingdon-71395_APP_2025_1999","polygon":{"coordinates":[[[508192.7,184531.85],[508190.7,184525.3],[508199.911,184522.451],[508200.4,184522.3],[508203.55,184524.1],[508207.25,184537.35],[508208.6,184542.3],[508209.75,184546.4],[508210.8,184550.2],[508205.888,184551.262],[508205.214,184551.408],[508204.971,184551.46],[508201.208,184552.357],[508200.583,184552.506],[508200.75,184553.1],[508201.9,184557.2],[508200.7,184557.55],[508198.301,184549.792],[508196.116,184542.768],[508195.662,184541.256],[508195.346,184540.251],[508192.7,184531.85]]],"type":"Polygon"},"cil_liability":true,"last_updated":"2026-07-20T22:00:11.903Z","wgs84_polygon":{"coordinates":[[[-0.442744,51.549748],[-0.442745,51.549721],[-0.442788,51.549722],[-0.442787,51.549749],[-0.442744,51.549748]]],"type":"Polygon"},"street_name":"155 GRANVILLE ROAD","decision_date":"21/04/2026","date_building_work_completed_under_previous_permission":null,"decision_conditions":["The development hereby permitted shall be begun before the expiration of three years from the date of this permission.","REASON","To comply with Section 91 of the Town and Country Planning Act 1990.","The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers:","- 25/027_S0 A","- 25/027_P0 A","- 25/027_P0L A","- 25/027_P1 A","- 25/027_P2 A","- 25/027_P3 A","- 25/027_P4 A","- 25/027_P5 A","and shall thereafter be retained/maintained for as long as the development remains in existence.","REASON","To ensure the development complies with the provisions of the Hillingdon Local Plan Part 1 (2012), Part 2 (2020) and the London Plan (2021).","Notwithstanding the provisions of the Town and Country Planning (General Permitted Development)(England) Order 2015 (or any order revoking and re-enacting that Order with or without modification); no garage(s), shed(s) or other outbuilding(s), nor extension or roof alteration to any dwellinghouse(s) shall be erected without the grant of further specific permission from the Local Planning Authority.","REASON","To protect the character and appearance of the area and amenity of residential occupiers and ensure the retention of adequate private amenity space in accordance with Policies DMHB 11 and DMHD 2 of the Hillingdon Local Plan Part 2 (2020)","Notwithstanding the approved plans, the materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building (155 Granville Road) and shall thereafter be retained as such.","REASON","To safeguard the visual amenities of the area and to ensure that the proposed development does not have an adverse effect upon the appearance of the existing building in accordance with Policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020)","Notwithstanding the approved plans, no development shall take place until a landscape scheme has been submitted to and approved in writing by the Local Planning Authority. The scheme shall include: -","1.    Details of Soft Landscaping","1.a  Planting plans (at not less than a scale of 1:100),","1.b  Written specification of planting and cultivation works to be undertaken,","1.c  Schedule of plants giving species, plant sizes, and proposed numbers/densities where appropriate","2. Details of Hard Landscaping","2.a Cycle Storage (2 no. secure and accessible spaces for the new dwelling)","2.b Means of enclosure/boundary treatments","2.c Car Parking Layouts (including the provision of 1 active 7kW electrical charging point for the new dwelling)","2.d Hard Surfacing Materials","2.e Refuse storage","2.f External Lighting","3. Details of Landscape Maintenance","3.a Landscape Maintenance Schedule for a minimum period of 5 years.","3.b Proposals for the replacement of any tree, shrub, or area of surfing/seeding within","Prior to first occupation of the new residential units, the fencing enclosing the private amenity spaces and the associated gates, as shown on the approved plans, shall be erected and thereafter permanently retained. Any new fencing should not be greater than 2metres in height.","REASON","To safeguard the privacy of adjoining residents in accordance with Policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020)","Except for demolition, no development shall take place above slab level until a demolition and construction management plan has been submitted to and approved in writing by the Local Planning Authority. The plan shall detail:","(i)  The phasing of development works","(ii) The hours during which development works will occur (please refer to informative I15 for maximum permitted working hours).","(iii) A programme to demonstrate that the most valuable or potentially contaminating materials and fittings can be removed safely and intact for later re-use or processing.","(iv) Measures to prevent mud and dirt tracking onto footways and adjoining roads (including wheel washing facilities).","(v) Traffic management and access arrangements (vehicular and pedestrian) and parking provisions for contractors during the development process (including measures to reduce the numbers of construction vehicles accessing the site during peak hours).","(vi) Measures to reduce the impact of the development on local ai","No development shall take place on any part of the site until a Biodiversity Gain Plan for the site, demonstrating compliance with the 10% biodiversity net gain requirement in accordance with the Environment Act 2021, has been submitted to and approved in writing by the Local Planning Authority. The Biodiversity Gain Plan should include:","i. Baseline Biodiversity Assessment: Using the latest Defra Biodiversity Metric, a report of the site's pre-development biodiversity value; and","ii. On-Site Enhancement and 30-year Habitat Management Plan (HMP) detailing measures to achieve BNG on-site, including species protection, habitat creation, and ongoing management strategies to maintain gains for a minimum of 30 years. The HMP should, as a minimum, include:","a) Description and evaluation of the features to be managed.","b) Aims, objectives and targets for management.","c) Description of the management operations necessary to achieving aims and objectives.","d) Prescriptions for management action","Except for demolition, no development shall take place above slab level until a scheme for the provision of sustainable water management has been submitted to and approved in writing by the Local Planning Authority. The scheme shall clearly demonstrate that sustainable drainage systems (SUDS) have been incorporated into the designs of the development in accordance with the drainage hierarchy set out in accordance with the London Plan and will:","i. provide information about the design storm period and intensity, the method employed to delay and control the surface water discharged from the site and the measures taken to prevent pollution of the receiving groundwater and/or surface waters;","ii. include a timetable for its implementation; and","iii. provide a management and maintenance plan for the lifetime of the development which shall include the arrangements for adoption by any public authority or statutory undertaker and any other arrangements to secure the operation of the scheme t","The site lies in a Critical Drainage Area (CDA) as identified in the Surface Water Management Plan (SWMP) for Hillingdon. A CDA is the catchment area from which surface water drains and contributes to drainage problems. All developments in this area must contribute to managing the risk of flooding from surface water by reducing surface water runoff from the site. Therefore the water from the site entering the sewers should be minimised. Hard paving associated with the development should be directed to a soakaway, or tank or made permeable. This includes any work to front gardens not part of the planning application, which must be permeable or be collected and directed to a permeable area, otherwise it would need an additional permission.","You are advised that if any part of the development hereby permitted encroaches by either its roof, walls, eaves, gutters, or foundations, then a new planning application may have to be submitted. The validity of this planning permission may be challengeable by third parties if the development results in any form of encroachment onto land outside the applicant's control for which the appropriate Notice under Article 13 of the Town and Country Planning (Development Management Procedure) (England) Order 2015 has not been served.","Nuisance from demolition and construction works is subject to control under The Control of Pollution Act 1974, the Clean Air Acts and other related legislation. In particular, you should ensure that the following are complied with:-","A. Demolition and construction works which are audible at the site boundary shall only be carried out between the hours of 08.00 and 18.00 hours Monday to Friday and between the hours of 08.00 hours and 13.00 hours on Saturday. No works shall be carried out on Sundays, Bank or Public Holidays.","B. All noise generated during such works shall be controlled in compliance with British Standard Code of Practice BS 5228:2009.","C. Dust emissions shall be controlled in compliance with the Mayor of London's Best Practice Guidance' The Control of dust and emissions from construction and demolition.","D. No bonfires that create dark smoke or nuisance to local residents.","You are advised to consult the Council's Environmental Protection Unit (www.hillingdon.gov.uk/nois","The Council will recover from the applicant the cost of highway and footway repairs, including damage to grass verges.","Care should be taken during the building works hereby approved to ensure no damage occurs to the verge or footpaths during construction. Vehicles delivering materials to this development shall not override or cause damage to the public footway. Any damage will require to be made good to the satisfaction of the Council and at the applicant's expense.","For further information and advice contact - Highways Maintenance Operations, Central Depot - Block K, Harlington Road Depot, 128 Harlington Road, Hillingdon, Middlesex, UB3 3EU (Tel: 01895 277524).","For Private Roads: Care should be taken during the building works hereby approved to ensure no damage occurs to the verge of footpaths on private roads during construction. Vehicles delivering materials to this development shall not override or cause damage to a private road and where possible alternative routes should be ta","The decision to GRANT planning permission has been taken having regard to all relevant planning legislation, regulations, guidance, circulars and Council policies, including The Human Rights Act (1998) (HRA 1998) which makes it unlawful for the Council to act incompatibly with Convention rights, specifically Article 6 (right to a fair hearing); Article 8 (right to respect for private and family life); Article 1 of the First Protocol (protection of property) and Article 14 (prohibition of discrimination).","The decision to GRANT planning permission has been taken having regard to the policies and proposals in the Hillingdon Local Plan Part 1 (2012) and Part 2 (2020) set out below, including Supplementary Planning Guidance, and to all relevant material considerations, including The London Plan (2021) and national guidance.","Under the terms of the Planning Act 2008 (as amended) and Community Infrastructure Levy Regulations 2010 (as amended), this development is liable to pay the London Borough of Hillingdon Community Infrastructure Levy (CIL) and the Mayor of London's Community Infrastructure Levy (CIL). This will be calculated in accordance with the London Borough of Hillingdon CIL Charging Schedule 2014 and the Mayor of London's CIL Charging Schedule 2012. Before commencement of works the development parties must notify the London Borough of Hillingdon of the commencement date for the construction works (by submitting a Commencement Notice) and assume liability to pay CIL (by submitting an Assumption of Liability Notice) to the Council at planning@hillingdon.gov.uk. The Council will then issue a Demand Notice setting out the date and the amount of CIL that is payable. Failure to submit a valid Assumption of Liability Notice and Commencement Notice prior to commencement of the development may result in su"],"reference_no_of_permission_being_relied_on":null,"actual_commencement_date":null,"borough":"Hillingdon","centroid_northing":184537.0,"site_number":115,"title_number":null,"development_type":null}