{"actual_commencement_date":null,"date_building_work_completed_under_previous_permission":null,"lpa_name":"Hillingdon","subdivision_of_building":null,"appeal_decision":null,"lapsed_date":"17/07/2029","appeal_decision_date":null,"last_updated_by":"CSV Data Import","reference_no_of_permission_being_relied_on":"73368/APP/2018/3041","epc_number":null,"last_updated":"2026-10-15T22:00:10.570Z","url_planning_app":"http://planning.hillingdon.gov.uk/OcellaWeb/planningDetails?reference=73368/APP/2026/347","street_name":"HAYES","parking_details":{"no_proposed_car":4,"no_existing_car":3,"net_car":1},"ward":"BELMORE 2022","bo_system":"CSV Data Import","site_name":"25 YEADING LANE","site_number":25,"application_details":{"total_gia_existing":115,"ownership_status":"Private","phasing_details":[{"phase_detail":"1","intended_commencement_date":"04/2026","intended_completion_date":"01/2027"}],"garden_land_lost":false,"rain_water_harvesting":false,"affordable_housing_fast_track":false,"non_residential_details":{"total_gia_existing":115,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_lost":115,"total_gia_gained":331.28,"total_non_resi_gross_internal_floor_area_to_be_gained":0},"grey_water_reuse":false,"existing_uprns":null,"superseding_details":[{"lpa_app_no":"73368/APP/2018/3041","partial_supersedence":false}],"total_gia_gained":331.28,"existing_proposed_floorspace_details":[{"gia_existing":115,"use_class":"C3","gia_gained":331.28,"gia_lost":115}],"green_suds":false,"scheme_phasing":true,"infrastructure_details":{"no_homes_passive_cooling":4,"no_active_slow_ev_charging_points":0,"no_homes_to_have_electrical_heating":4,"total_annual_pm_emissions":0.24,"no_new_water_connections_required":5,"waste_provision":true,"no_passive_slow_ev_charging_points":0,"no_non_resi_units_to_have_full_fibre":0,"no_resi_units_to_have_full_fibre":4,"percentage_demolition_construction_material_recycling":75,"green_roof_area":0,"urban_greening_factor_score":0.35000000000000003,"mobile_network_operators_consultation":false,"no_new_gas_connections_required":5,"ghg_reduction_over_building_regulations":false,"fire_suppression_system_proposed":false,"total_annual_nox_emissions":9.6},"building_details":[{"no_storeys":2,"max_height":8.55,"building_ref":"1"}],"projected_cost_of_works":"Up to £2m","internal_resi_water_usage":110,"residential_details":{"total_no_proposed_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_existing_residential_units_market_for_sale":0,"total_no_proposed_residential_units_london_living_rent":0,"total_no_proposed_bedrooms":6,"total_no_existing_residential_units_london_shared_ownership":0,"total_no_proposed_residential_units_shared_equity":0,"total_no_existing_residential_affordable_units":0,"total_no_proposed_residential_units_london_affordable_rent":0,"affordable_percentage":50.0,"dwelling_density":0,"total_no_existing_residential_units_intermediate":0,"total_no_proposed_residential_units_intermediate":0,"total_no_proposed_residential_units_discount_market_rent":0,"total_no_existing_residential_units_london_living_rent":0,"habitable_rooms_density":null,"total_no_existing_residential_units":0,"total_no_existing_residential_units_affordable_rent":0,"total_no_proposed_residential_units_discount_market_sale":0,"total_no_existing_residential_units_social_rent":0,"total_no_proposed_residential_units_self_build_and_custom_build":4,"total_no_existing_residential_units_starter_homes":0,"total_no_existing_residential_units_market_for_rent":0,"total_no_existing_residential_units_shared_equity":0,"total_no_proposed_residential_units_social_rent":0,"total_no_proposed_residential_affordable_units":4,"total_no_existing_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_proposed_residential_units_market_for_sale":0,"total_no_proposed_residential_units_market_for_rent":0,"total_gia_gained":601,"total_no_existing_residential_units_london_affordable_rent":0,"total_no_existing_residential_units_self_build_and_custom_build":0,"total_no_proposed_residential_units_london_shared_ownership":0,"total_no_existing_residential_units_discount_market_sale":0,"total_no_proposed_residential_units":8,"total_no_existing_residential_units_discount_market_rent":0,"total_no_proposed_residential_units_starter_homes":0,"total_gia_lost":0,"total_no_proposed_residential_units_affordable_rent":0,"residential_units":[{"change_type":"Gain","unit_type":"Communal Space","gia":90},{"change_type":"Gain","unit_type":"Communal Space","gia":90},{"change_type":"Gain","unit_type":"Communal Space","gia":90},{"change_type":"Gain","unit_type":"Communal Space","gia":90},{"provider":"Private","no_habitable_rooms":2,"change_type":"Gain","no_bedrooms":1,"unit_type":"Flat Apartment Maisonette","gia":49.37,"tenure":"Self-Build and Custom Build"},{"provider":"Private","no_habitable_rooms":4,"change_type":"Gain","no_bedrooms":3,"unit_type":"Flat Apartment Maisonette","gia":75,"tenure":"Self-Build and Custom Build"},{"provider":"Private","no_habitable_rooms":2,"change_type":"Gain","no_bedrooms":1,"unit_type":"Flat Apartment Maisonette","gia":52.99,"tenure":"Self-Build and Custom Build"},{"provider":"Private","no_habitable_rooms":2,"change_type":"Gain","no_bedrooms":1,"unit_type":"Flat Apartment Maisonette","gia":63.64,"tenure":"Self-Build and Custom Build"}]},"total_gia_lost":115,"surface_water_discharge_percentage_reduction":30,"site_area":0.09430000000000001,"occupation_status":"Occupied"},"uprn":null,"locality":null,"date_building_work_started_under_previous_permission":null,"postcode":"UB4 0EL","valid_date":"26/02/2026","cil_liability":true,"actual_completion_date":null,"centroid":{"lat":51.519391,"lon":-0.406268},"centroid_easting":510675.0,"application_type_full":"Full planning permission","pp_id":"14684071","lpa_app_no":"73368/APP/2026/347","polygon":{"geometries":[{"coordinates":[[[510647.377,181267.759],[510645.3,181261.55],[510645.35,181260.45],[510664.18,181252.9],[510666.8,181251.85],[510671.7,181249.9],[510675.159,181248.507],[510679.4,181246.8],[510683,181245.35],[510687.5,181243.5],[510701.65,181237.75],[510706.95,181252.3],[510698.45,181255.7],[510693.85,181257.5],[510687.95,181260],[510684.3,181261.45],[510683.7,181261.65],[510681.25,181262.7],[510653.937,181273.677],[510653.157,181273.99],[510650.859,181274.914],[510650.071,181275.238],[510649.669,181274.61],[510648.961,181272.493],[510647.377,181267.759]]],"type":"Polygon"}],"type":"GeometryCollection"},"id":"Hillingdon-73368_APP_2026_347","appeal_status":null,"appeal_start_date":null,"description":"Demolition of existing bungalow and the erection of 4no. self-contained flats with car parking, cycle storage, refuge storage and amenity space","development_type":null,"decision_conditions":["The development hereby permitted shall be begun before the expiration of three years from the date of this permission.","REASON","To comply with Section 91 of the Town and Country Planning Act 1990.","The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers:","A100 Rev A","A101 Rev A","A102 Rev A","A103 Rev A","A104 Rev A","A105 Rev A","A200 Rev A","25-846-SK01 Rev B","25-846-TR01 Rev B","25-846-TR02 Rev B","and shall thereafter be retained/maintained for as long as the development remains in existence.","REASON","To ensure the development complies with the provisions of the Hillingdon Local Plan Part 1 (2012), Part 2 (2020) and the London Plan (2021).","The development hereby permitted shall not be occupied until the following has been completed in accordance with the specified supporting plans and/or documents:","Fire Statement dated 18th December 2025","Preliminary Ecology Appraisal dated February 2026","Air Quality Assessment dated 14-01-2026","Thereafter the development shall be retained/maintained in accordance with these details for as long as the development remains in existence.","REASON","To ensure the development complies with the provisions of the Hillingdon Local Plan Part 1 (2012), Part 2 (2020) and the London Plan (2021).","Prior to commencement of the hereby approved development (excluding demolition and site clearance), a landscape scheme shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall include: -","1. Details of Hard Landscaping","1.a Means of enclosure/boundary treatments","1.b Car Parking Layouts (including the provision of one 7Kw active Electric Vehicle charging Points for each dwelling)","1.c Cycle storage (7no. total, secure and covered)","1.d Refuse storage","1.e External Lighting","1.f Other structures (such as play equipment and furniture)","2. Details of Landscape Maintenance","2.a Landscape Maintenance Schedule for a minimum period of 5 years.","2.b Proposals for the replacement of any tree, shrub, or area of surfing/seeding within the landscaping scheme which dies or in the opinion of the Local Planning Authority becomes seriously damaged or diseased.","3. Schedule for Implementation","Thereafter the development shall be carried out and maintained in full accor","Prior to development commencing, a demolition and construction management plan shall be submitted to and approved in writing by the Local Planning Authority. The plan shall detail:","(i) The phasing of development works","(ii) The hours during which development works will occur (please refer to informative I15 for maximum permitted working hours).","(iii) Routing of construction vehicles to and from the site (supported with swept path drawings)","(iv) Hours of HGV movements (to exclude local network peaks and school start/finish times)","(v) On-site loading/unloading arrangements","(vi) Banksman arrangements for all reversing and manoeuvring","(vii) Measures to prevent mud and dirt tracking onto footways and adjoining roads (including wheel washing facilities).","(viii) Temporary highway arrangements, including any hoardings, scaffolding or footway management","(ix) Traffic management and access arrangements (vehicular and pedestrian) and parking provisions for contractors during the development proces","Except for demolition, no development shall take place above slab level until a scheme for the provision of sustainable water management has been submitted to and approved in writing by the Local Planning Authority. The scheme shall clearly demonstrate that sustainable drainage systems (SUDS) have been incorporated into the designs of the development in accordance with the drainage hierarchy set out in accordance with the London Plan and will:","i. provide information about the design storm period and intensity, the method employed to delay and control the surface water discharged from the site and the measures taken to prevent pollution of the receiving groundwater and/or surface waters;","ii. include a timetable for its implementation; and","iii. provide a management and maintenance plan for the lifetime of the development which shall include the arrangements for adoption by any public authority or statutory undertaker and any other arrangements to secure the operation of the scheme t","Prior to any works on site above damp proof course level, details of step free access via all points of entry and exit shall be submitted to, and approved in writing, by the Local Planning Authority. Such provision shall remain in place for the life of the building.","REASON","To ensure housing of an inclusive design is achieved and maintained in accordance with Policies D5 and D7 of the London Plan (2021).","The dwellings hereby approved shall accord with the requirements of Policy D7 of the London Plan and shall not be occupied until certification of compliance with the technical specifications for an M4(2) dwelling, as set out in Approved Document M to the Building Regulations (2010) 2015, has been submitted to, and approved in writing, by the Local Planning Authority. All such provisions must remain in place for the life of the building.","REASON","To not only allow the Building Control body to require the development to comply with the optional Building Regulations standards, but to also ensure the appropriate quantity and standard of accessible and adaptable housing is constructed and maintained in accordance with Policy D7 of the London Plan.","The windows in the side elevations of the development hereby permitted shall be glazed with permanently obscured glass to at least scale 4 on the Pilkington scale and be non-opening below a height of 1.8 metres taken from internal finished floor level for so long as the development remains in existence.","REASON","To prevent overlooking to adjoining properties in accordance with Policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020).","Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (as amended) (or any order revoking and re-enacting that Order with or without modification), no additional windows, doors or other openings shall be constructed in the walls or roof slopes of the development hereby approved.","REASON","To prevent overlooking to adjoining properties in accordance with Policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020).","Trees, hedges and shrubs shown to be retained on the approved plan shall not be damaged, uprooted, felled, lopped or topped without the prior written consent of the Local Planning Authority. If any retained tree, hedge or shrub is removed or severely damaged during construction, or is found to be seriously diseased or dying another tree, hedge or shrub shall be planted at the same place or, if planting in the same place would leave the new tree, hedge or shrub susceptible to disease, then the planting should be in a position to be first agreed in writing with the Local Planning Authority and shall be of a size and species to be agreed in writing by the Local Planning Authority and shall be planted in the first planting season following the completion of the development or the occupation of the buildings, whichever is the earlier. Where damage is less severe, a schedule of remedial works necessary to ameliorate the effect of damage by tree surgery, feeding or groundwork shall be agreed","The development hereby approved includes the carrying out of alterations to a vehicular access.  Prior to undertaking work on the adopted highway you will require a Section 184 licence from the Highway Authority. The works shall be to the specification and constructed to the satisfaction of the Highway Authority. Fees are payable for the approval of the highway details, and inspection of the works. Further information and an application form are available on the London Borough of Hillingdon website https://www.hillingdon.gov.uk/dropped-kerb-form","The applicant is advised that the implementation of the approved vehicle crossover will require the removal of a residents' parking bay. This will necessitate an amendment to the Traffic Management Order (TMO), which must be arranged and funded by the applicant.","You are advised that if any part of the development hereby permitted encroaches by either its roof, walls, eaves, gutters, or foundations, then a new planning application may have to be submitted. The validity of this planning permission may be challengeable by third parties if the development results in any form of encroachment onto land outside the applicant's control for which the appropriate Notice under Article 13 of the Town and Country Planning (Development Management Procedure) (England) Order 2015 has not been served.","Nuisance from demolition and construction works is subject to control under The Control of Pollution Act 1974, the Clean Air Acts and other related legislation. In particular, you should ensure that the following are complied with:-","A. Demolition and construction works which are audible at the site boundary shall only be carried out between the hours of 08.00 and 18.00 hours Monday to Friday and between the hours of 08.00 hours and 13.00 hours on Saturday. No works shall be carried out on Sundays, Bank or Public Holidays.","B. All noise generated during such works shall be controlled in compliance with British Standard Code of Practice BS 5228:2009.","C. Dust emissions shall be controlled in compliance with the Mayor of London's Best Practice Guidance' The Control of dust and emissions from construction and demolition.","D. No bonfires that create dark smoke or nuisance to local residents.","You are advised to consult the Council's Environmental Protection Unit (www.hillingdon.gov.uk/nois","The Council will recover from the applicant the cost of highway and footway repairs, including damage to grass verges.","Care should be taken during the building works hereby approved to ensure no damage occurs to the verge or footpaths during construction. Vehicles delivering materials to this development shall not override or cause damage to the public footway. Any damage will require to be made good to the satisfaction of the Council and at the applicant's expense.","For further information and advice contact - Highways Maintenance Operations, Central Depot - Block K, Harlington Road Depot, 128 Harlington Road, Hillingdon, Middlesex, UB3 3EU (Tel: 01895 277524).","For Private Roads: Care should be taken during the building works hereby approved to ensure no damage occurs to the verge of footpaths on private roads during construction. Vehicles delivering materials to this development shall not override or cause damage to a private road and where possible alternative routes should be ta","The decision to GRANT planning permission has been taken having regard to all relevant planning legislation, regulations, guidance, circulars and Council policies, including The Human Rights Act (1998) (HRA 1998) which makes it unlawful for the Council to act incompatibly with Convention rights, specifically Article 6 (right to a fair hearing); Article 8 (right to respect for private and family life); Article 1 of the First Protocol (protection of property) and Article 14 (prohibition of discrimination).","The decision to GRANT planning permission has been taken having regard to the policies and proposals in the Hillingdon Local Plan Part 1 (2012) and Part 2 (2020) set out below, including Supplementary Planning Guidance, and to all relevant material considerations, including The London Plan (2021) and national guidance.","Under the terms of the Planning Act 2008 (as amended) and Community Infrastructure Levy Regulations 2010 (as amended), this development is liable to pay the London Borough of Hillingdon Community Infrastructure Levy (CIL) and the Mayor of London's Community Infrastructure Levy (CIL). This will be calculated in accordance with the London Borough of Hillingdon CIL Charging Schedule 2014 and the Mayor of London's CIL Charging Schedule 2012. Before commencement of works the development parties must notify the London Borough of Hillingdon of the commencement date for the construction works (by submitting a Commencement Notice) and assume liability to pay CIL (by submitting an Assumption of Liability Notice) to the Council at planning@hillingdon.gov.uk. The Council will then issue a Demand Notice setting out the date and the amount of CIL that is payable. Failure to submit a valid Assumption of Liability Notice and Commencement Notice prior to commencement of the development may result in su"],"last_synced":"2026-10-21T16:25:04.894Z","secondary_street_name":null,"title_number":null,"last_date_consultation_comments":"24/03/2026","decision_process":"Delegated","centroid_northing":181256.0,"borough":"Hillingdon","decision":"Approved","application_type":"All Other","wgs84_polygon":{"coordinates":[[[-0.406663,51.519502],[-0.406695,51.519446],[-0.406694,51.519436],[-0.406425,51.519365],[-0.406388,51.519355],[-0.406318,51.519337],[-0.406269,51.519323],[-0.406208,51.519307],[-0.406157,51.519293],[-0.406092,51.519276],[-0.40589,51.519221],[-0.405809,51.519351],[-0.405931,51.519383],[-0.405996,51.5194],[-0.406081,51.519424],[-0.406133,51.519438],[-0.406141,51.51944],[-0.406176,51.51945],[-0.406566,51.519554],[-0.406578,51.519557],[-0.40661,51.519565],[-0.406622,51.519568],[-0.406628,51.519563],[-0.406638,51.519544],[-0.406663,51.519502]]],"type":"Polygon"},"decision_agency":"Borough","decision_target_date":"24/07/2026","status":"Approved","decision_date":"17/07/2026"}