{"decision_target_date":"03/06/2026","url_planning_app":"http://planning.hillingdon.gov.uk/OcellaWeb/planningDetails?reference=76034/APP/2026/710","centroid":{"lat":51.502864,"lon":-0.43644},"decision_date":"01/06/2026","last_synced":"2026-08-31T02:23:20.569Z","wgs84_polygon":{"coordinates":[[[-0.436515,51.502909],[-0.436521,51.502824],[-0.436339,51.502819],[-0.436335,51.502904],[-0.436515,51.502909]]],"type":"Polygon"},"epc_number":null,"last_date_consultation_comments":"09/05/2026","decision_process":"Delegated","site_number":96,"last_updated":"2026-08-30T22:00:11.770Z","decision":"Approved","actual_commencement_date":null,"appeal_decision_date":null,"status":"Approved","bo_system":"CSV Data Import","cil_liability":true,"development_type":null,"parking_details":{"no_existing_car":1,"no_proposed_car":1,"net_car":0},"application_details":{"affordable_housing_fast_track":false,"building_details":[{"no_storeys":2,"max_height":8.5,"building_ref":"All"}],"residential_details":{"total_no_existing_residential_units_social_rent":0,"total_no_proposed_residential_units_social_rent":0,"total_no_proposed_residential_units_market_for_sale":0,"total_no_proposed_residential_units_market_for_rent":1,"total_no_existing_residential_units_shared_equity":0,"total_no_existing_residential_units_intermediate":0,"total_no_existing_residential_units_london_shared_ownership":0,"total_no_proposed_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_existing_residential_units_london_affordable_rent":0,"total_no_existing_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_existing_residential_units_affordable_rent":0,"total_no_existing_residential_units_market_for_rent":0,"total_no_existing_residential_units_london_living_rent":0,"total_no_proposed_residential_units_london_affordable_rent":0,"total_no_proposed_residential_affordable_units":0,"habitable_rooms_density":null,"total_gia_gained":70,"total_no_proposed_residential_units_self_build_and_custom_build":0,"total_no_existing_residential_units_discount_market_rent":0,"total_no_existing_residential_units":0,"total_no_existing_residential_affordable_units":0,"dwelling_density":0,"total_no_proposed_residential_units_intermediate":0,"total_no_proposed_residential_units_shared_equity":0,"total_no_existing_residential_units_discount_market_sale":0,"affordable_percentage":0.0,"total_no_proposed_residential_units_starter_homes":0,"total_no_existing_residential_units_self_build_and_custom_build":0,"total_no_existing_residential_units_starter_homes":0,"total_no_proposed_residential_units_affordable_rent":0,"total_no_proposed_residential_units_discount_market_rent":0,"total_no_proposed_residential_units":1,"total_no_proposed_residential_units_discount_market_sale":0,"total_no_existing_residential_units_market_for_sale":0,"residential_units":[{"provider":"Private","no_habitable_rooms":4,"change_type":"Gain","unit_type":"House or Bungalow","no_bedrooms":2,"tenure":"Market for rent","gia":70}],"total_no_proposed_bedrooms":2,"total_no_proposed_residential_units_london_living_rent":0,"total_no_proposed_residential_units_london_shared_ownership":0,"total_gia_lost":0},"phasing_details":[{"phase_detail":"All","intended_completion_date":"12/2026","intended_commencement_date":"06/2026"}],"green_suds":false,"scheme_phasing":true,"site_area":0.011,"total_gia_lost":0,"surface_water_discharge_percentage_reduction":0,"projected_cost_of_works":"Up to £2m","ownership_status":"Private","garden_land_lost":false,"infrastructure_details":{"no_homes_passive_cooling":0,"total_annual_pm_emissions":0,"percentage_demolition_construction_material_recycling":0,"waste_provision":true,"no_resi_units_to_have_full_fibre":1,"no_passive_other_ev_charging_points":1,"urban_greening_factor_score":0,"no_new_water_connections_required":1,"total_annual_nox_emissions":0,"green_roof_area":0,"no_active_other_ev_charging_points":0,"no_non_resi_units_to_have_full_fibre":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":1,"ghg_reduction_over_building_regulations":false,"no_homes_to_have_electrical_heating":0},"total_gia_existing":33,"total_gia_gained":70,"existing_proposed_floorspace_details":[{"gia_existing":33,"gia_gained":70,"use_class":"SpecifiedOther","gia_lost":0}],"grey_water_reuse":false,"non_residential_details":{"total_gia_gained":70,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_lost":0,"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_gia_existing":33},"internal_resi_water_usage":110,"rain_water_harvesting":false,"occupation_status":"Vacant"},"pp_id":"14792040","last_updated_by":"CSV Data Import","reference_no_of_permission_being_relied_on":null,"appeal_start_date":null,"lapsed_date":"01/06/2029","postcode":"UB3 1QP","uprn":null,"application_type":"All Other","subdivision_of_building":null,"ward":"PINKWELL 2022","borough":"Hillingdon","id":"Hillingdon-76034_APP_2026_710","appeal_decision":null,"street_name":"HAYES","secondary_street_name":null,"lpa_name":"Hillingdon","date_building_work_completed_under_previous_permission":null,"title_number":null,"description":"Erection of 1no. 2 storey dwellinghouse with associated parking, bin store, and landscaping, following demolition of existing outbuilding","decision_conditions":["The development hereby permitted shall be begun before the expiration of three years from the date of this permission.","REASON","To comply with Section 91 of the Town and Country Planning Act 1990","The development hereby permitted shall not be carried out except in complete accordance with the details shown on submitted plans numbers:","0235-EX-00 Rev F","0235-PR-01 Rev F2","0235-PR-10 Rev F2","0235-PR-20 Rev F2","0235-PR-21 Rev F2","and shall thereafter be retained/maintained for as long as the development remains in existence.","REASON","To ensure the development complies with the provisions of the Hillingdon Local Plan Part 1 (2012), Part 2 (2020) and the London Plan (2021).","No development shall take place until details of all materials and external surfaces, have been submitted to and approved in writing by the Local Planning Authority. Thereafter the development shall be constructed in accordance with the approved details and be retained as such.","Details should include information relating to make, product/type, colour and photographs/images.","REASON","To ensure that the development presents a satisfactory appearance in accordance with Policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020).","No development shall take place until a landscape scheme has been submitted to and approved in writing by the Local Planning Authority. The scheme shall include: -","1.    Details of Soft Landscaping","1.a  Planting plans (at not less than a scale of 1:100),","1.b  Written specification of planting and cultivation works to be undertaken,","1.c  Schedule of plants giving species, plant sizes, and proposed numbers/densities where appropriate","2. Details of Hard Landscaping","2.a Refuse Storage","2.b Cycle Storage (2 spaces, secure and enclosed)","2.c Means of enclosure/boundary treatments","2.d Car Parking Layouts (1 Active EVCP)","2.e Hard Surfacing Materials","2.f External Lighting","2.g Other structures (such as play equipment and furniture)","3. Details of Landscape Maintenance","3.a Landscape Maintenance Schedule for a minimum period of 5 years.","3.b Proposals for the replacement of any tree, shrub, or area of surfing/seeding within the landscaping scheme which dies or in the opinion of the Local Planning","Prior to any works on site above damp proof course level, details of step free access via all points of entry and exit shall be submitted to, and approved in writing, by the Local Planning Authority. The measures implemented as approved shall be retained thereafter.","REASON","To ensure housing of an inclusive design is achieved and maintained in accordance with Policies D5 and D7 of the London Plan (2021).","Prior to commencement of the hereby approved development, (excluding demolition and site clearance) a scheme for the provision of sustainable water management shall be submitted to, and approved in writing by the Local Planning Authority. The scheme shall clearly demonstrate how the approved development will incorporate sustainable urban drainage (SuDs) in accordance with the hierarchy set out in Policy 5.13 of the London Plan and will:","i. provide information on all SuDs features including the method employed to delay and control the surface water discharged from the site and:","ii. provide a management and maintenance plan for the lifetime of the development of arrangements to secure the operation of the scheme throughout its lifetime. Including appropriate details of Inspection regimes, appropriate performance specification.","The scheme shall also demonstrate the use of methods to minimise the use of potable water through water collection, reuse and recycling and will:","iii. provide det","The side windows facing No. 2 Clevedon Gardens and 96 Bourne Avenue shall be glazed with permanently obscured glass to at least scale 4 on the Pilkington scale and be non-opening below a height of 1.8 metres taken from internal finished floor level for so long as the development remains in existence.","REASON","To prevent overlooking to adjoining properties in accordance with policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020).","Notwithstanding the provisions of the Town and Country Planning (General Permitted Development)(England) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no additional windows, doors or other openings shall be constructed in the walls or roof slopes of the development.","REASON","To prevent overlooking to adjoining properties in accordance with policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020).","Notwithstanding the provisions of the Town and Country Planning (General Permitted Development)(England) Order 2015 (or any order revoking and re-enacting that Order with or without modification); no garage(s), shed(s) or other outbuilding(s), nor extension or roof alteration to any dwellinghouse(s) shall be erected without the grant of further specific permission from the Local Planning Authority.","REASON","To protect the character and appearance of the area and amenity of residential occupiers in accordance with policies DMHB 11 and DMHD 2 of the Hillingdon Local Plan Part 2 (2020)","The new dwelling hereby approved shall accord with the requirements of Policy D7 of the London Plan and shall not be occupied until certification of compliance with the technical specifications for an M4(2) dwelling, as set out in Approved Document M to the Building Regulations (2010) 2015, has been submitted to, and approved in writing, by the Local Planning Authority. All such provisions must remain in place for the life of the building.","REASON","To not only allow the Building Control body to require the development to comply with the optional Building Regulations standards, but to also ensure the appropriate quantity and standard of accessible and adaptable housing is constructed and maintained in accordance with policy D7 of the London Plan.","The applicant is advised that the storage of materials associated with the construction of this development should be provided within the site on land which is not public highway, and the use of such areas must not interfere with the public highway.","It is an offence under section 137 of the Highways Act 1980 for any person, without lawful authority or excuse, in any way to wilfully obstruct the free passage along a highway or public right of way. If this development is likely to result in the public highway or public right of way network becoming routinely blocked (fully or partly) the applicant must contact the Highway Authority to obtain their permission and requirements before construction works commence.","It is an offence under section 148 of the Highways Act 1980 to deposit mud or other debris on the public highway, and section 149 of the same Act gives the Highway Authority powers to remove such material at the expense of the party responsible.  Therefore, best practical means shall be taken at all times to ensure that all vehicles leaving the site during construction of the development are in a condition such as not to emit dust or deposit mud, slurry or other debris on the highway.","Where works are required within the public highway to facilitate a new or amended vehicular access, the Highway Authority require the construction of such works to be undertaken to their satisfaction and specification, and by a contractor who is authorised to work in the public highway. If any of the works associated with the construction of the access affects or requires the removal and/or the relocation of any equipment, apparatus or structures (e.g. street name plates, bus stop signs or shelters, statutory authority equipment etc.) the applicant will be required to bear the cost of such removal or alteration. Before works commence the applicant will need to apply to the Highway Authority to obtain their permission, requirements and for the work to be carried out on the applicant's behalf.","The applicant is advised that the Highway Authority has powers under section 163 of the Highways Act 1980, to take appropriate steps where deemed necessary (serving notice to the occupier of premises adjoining a highway) to prevent water from the roof or other part of the premises falling upon persons using the highway, or to prevent so far as is reasonably practicable, surface water from the premises flowing on to, or over the footway of the highway.","The decision to GRANT planning permission has been taken having regard to all relevant planning legislation, regulations, guidance, circulars and Council policies, including The Human Rights Act (1998) (HRA 1998) which makes it unlawful for the Council to act incompatibly with Convention rights, specifically Article 6 (right to a fair hearing); Article 8 (right to respect for private and family life); Article 1 of the First Protocol (protection of property) and Article 14 (prohibition of discrimination).","The decision to GRANT planning permission has been taken having regard to the policies and proposals in the Hillingdon Local Plan Part 1 (2012) and Part 2 (2020) set out below, including Supplementary Planning Guidance, and to all relevant material considerations, including The London Plan and national guidance.","Under the terms of the Planning Act 2008 (as amended) and Community Infrastructure Levy Regulations 2010 (as amended), this development is liable to pay the London Borough of Hillingdon Community Infrastructure Levy (CIL) and the Mayor of London's Community Infrastructure Levy (CIL). This will be calculated in accordance with the London Borough of Hillingdon CIL Charging Schedule 2014 and the Mayor of London's CIL Charging Schedule 2012. Before commencement of works the development parties must notify the London Borough of Hillingdon of the commencement date for the construction works (by submitting a Commencement Notice) and assume liability to pay CIL (by submitting an Assumption of Liability Notice) to the Council at planning@hillingdon.gov.uk. The Council will then issue a Demand Notice setting out the date and the amount of CIL that is payable. Failure to submit a valid Assumption of Liability Notice and Commencement Notice prior to commencement of the development may result in su","You are advised that if any part of the development hereby permitted encroaches by either its roof, walls, eaves, gutters, or foundations, then a new planning application may have to be submitted. The validity of this planning permission may be challengeable by third parties if the development results in any form of encroachment onto land outside the applicant's control for which the appropriate Notice under Article 13 of the Town and Country Planning (Development Management Procedure) (England) Order 2015 has not been served.","Nuisance from demolition and construction works is subject to control under The Control of Pollution Act 1974, the Clean Air Acts and other related legislation. In particular, you should ensure that the following are complied with:-","A. Demolition and construction works which are audible at the site boundary shall only be carried out between the hours of 08.00 and 18.00 hours Monday to Friday and between the hours of 08.00 hours and 13.00 hours on Saturday. No works shall be carried out on Sundays, Bank or Public Holidays.","B. All noise generated during such works shall be controlled in compliance with British Standard Code of Practice BS 5228:2009.","C. Dust emissions shall be controlled in compliance with the Mayor of London's Best Practice Guidance' The Control of dust and emissions from construction and demolition.","D. No bonfires that create dark smoke or nuisance to local residents.","You are advised to consult the Council's Environmental Protection Unit (www.hillingdon.gov.uk/nois","The Council will recover from the applicant the cost of highway and footway repairs, including damage to grass verges.","Care should be taken during the building works hereby approved to ensure no damage occurs to the verge or footpaths during construction. Vehicles delivering materials to this development shall not override or cause damage to the public footway. Any damage will require to be made good to the satisfaction of the Council and at the applicant's expense.","For further information and advice contact - Highways Maintenance Operations, Central Depot - Block K, Harlington Road Depot, 128 Harlington Road, Hillingdon, Middlesex, UB3 3EU (Tel: 01895 277524).","For Private Roads: Care should be taken during the building works hereby approved to ensure no damage occurs to the verge of footpaths on private roads during construction. Vehicles delivering materials to this development shall not override or cause damage to a private road and where possible alternative routes should be ta"],"application_type_full":"Full planning permission","actual_completion_date":null,"locality":null,"centroid_easting":508621.0,"lpa_app_no":"76034/APP/2026/710","valid_date":"31/03/2026","polygon":{"geometries":[{"coordinates":[[[508615.7,179377.9],[508615.47719557176,179368.4029612463],[508628.067,179368.05],[508628.2,179377.6],[508615.7,179377.9]]],"type":"Polygon"}],"type":"GeometryCollection"},"decision_agency":"Borough","centroid_northing":179373.0,"site_name":"LAND REAR OF 96 BOURNE AVENUE","appeal_status":null,"date_building_work_started_under_previous_permission":null}