{"postcode":"UB4 0RH","status":"Approved","decision_agency":"Borough","subdivision_of_building":null,"appeal_start_date":null,"cil_liability":false,"decision_conditions":["The development hereby permitted shall be begun before the expiration of three years from the date of this permission.","REASON","To comply with Section 91 of the Town and Country Planning Act 1990.","The temporary structures hereby approved, comprising the installation of temporary hoarding and a temporary substation to support the enabling works, shall be removed and the affected land reinstated as soon as reasonably practicable following completion of the enabling works, unless otherwise incorporated into development carried out pursuant to planning permission ref. 78343/APP/2025/719, dated 20.05.2026, for the redevelopment of the site.","In the event that development pursuant to planning permission ref. 78343/APP/2025/719 has not commenced within 12 months of the completion of the enabling works, a scheme and timetable for the removal of the temporary structures and reinstatement of the land shall be submitted to and approved in writing by the Local Planning Authority, and the development shall thereafter be carried out in accordance with the approved details.","REASON","The development, by reason of its temporary design, is not considered suitable for permanent retention in complia","The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers:","Location Plan:","LONUX-NWA-PL-ZZ-DR-A-SK075 Site Plan - Phase Existing","Utilities Plans:","LON6-CDL-EW-XX-DR-C-90301 Rev. P02 Existing Utilities Removal and Diversion Plan","LON6-CDL-EW-XX-DR-C-90203 Rev. P02 Existing Utilities Disconnection Plan","Enabling Plans:","LONUX-ARUP-PL-ZZ-DR-S-10806 Rev. P02 Enabling Works Plan","LONUX-CDL-EW-XX-SD-E-60001 Rev. P03 Enabling Works Schematic","Substation, Switch Room and Transformer Plans:","LONUX-ARUP-PL-ZZ-DR-S-10805 Rev. P01 Substation and LV Switchroom Foundations","TR18 SSE Transformer Elevations","REASON","To ensure the development complies with the provisions of the Hillingdon Local Plan Part 1 (2012), Part 2 (2020) and the London Plan (2021).","The development hereby permitted shall not be carried out except in complete accordance with the specified supporting documents:","Cover Letter (Dated 3rd October 2025);","Management and Logistics Plan (Dated September 2025);","42047_T_UG Utility Survey;","Written scheme of investigation for an archaeological watching brief on ground remediation Issue 3 (Dated 2nd April 2026);","25/4060GIR-F01 Ground Investigation Report - Factual Issue 02 (Dated 11th September 2025);","LONUX-ARUP-PL-XX-RP-Z-00008 P03 Ground contamination risk assessment and remediation strategy (Dated 23rd March 2026);","12157 TN.06: Arboricultural Note (Dated August 2025);","Ecological Appraisal (Dated February 2026);","12157 TCP 01 (Overview), (1/4), (2/4), (3/4) and (4/4) Tree Constraints Plan; and","12157 TS 01 BS 5837:2012 Tree Schedule.","REASON","To ensure the development complies with the provisions of the Hillingdon Local Plan Part 1 (2012), Part 2 (2020) and the London Plan (2021).","The development shall be carried out in accordance with the approved report references \"25/4060GIR-F01 Ground Investigation Report - Factual Issue 02 (Dated 11th September 2025)\" and \"LONUX-ARUP-PL-XX-RP-Z-00008 P03 Ground contamination risk assessment and remediation strategy (Dated 23rd March 2026)\". All remediation and mitigation measures shall be implemented in full.","a) Unexpected contamination: If contamination not previously identified is encountered during development or remedial works, works shall cease in the affected area and an addendum to the remediation strategy shall be submitted to and approved in writing by the Local Planning Authority prior to implementation.","b) Capping layer / cover system: Any temporary capping layer or cover system installed as part of the enabling works shall be implemented in accordance with the approved remediation strategy and shall provide a suitable barrier to any underlying contamination for the duration of the enabling works. Details shal","The groundworks hereby permitted shall be undertaken and completed in accordance with the approved document reference \"Written scheme of investigation for an archaeological watching brief on ground remediation Issue 3 (Dated 2nd April 2026)\", unless agreed otherwise in writing by the Local Planning Authority.","REASON","To secure the provision of archaeological investigation and the subsequent recording of the remains prior to development, in accordance with Policy DMHB 7 of the Hillingdon Local Plan: Part 2 (2020), Policy HC1 of the London Plan (2021) and Chapter 16 of the National Planning Policy Framework (2024)","a) The development hereby approved shall be carried out in accordance with the IAQM \"Guidance on the assessment of dust from demolition and construction (January 2024) (Version 2.2) and the Greater London Authority's \"Control of Dust and Emissions during Construction and Demolition\" Supplementary Planning Guidance (July 2014) (or any successor document), including the implementation of appropriate dust suppression, mitigation, monitoring and management measures commensurate with the level of dust risk associated with the development.","b) All Non-Road Mobile Machinery (NRMM) of net power of 37kW and up to and including 560kW used during the course of the demolition, site preparation and construction phases shall comply with the emission standards set out in chapter 7 of the GLA's supplementary planning guidance \"Control of Dust and Emissions During Construction and Demolition\" dated July 2014 (SPG), or subsequent guidance. Unless it complies with the standards set out in the SPG, no NRM","Trees, hedges and shrubs shown to be retained on the approved plans and documents shall not be damaged, uprooted, felled, lopped or topped without the prior written consent of the Local Planning Authority.","If any retained tree, hedge or shrub is removed or severely damaged during construction, or is found to be seriously diseased or dying, another tree, hedge or shrub shall be planted at the same place or, if planting in the same place would leave the new tree, hedge or shrub susceptible to disease, then the planting should be in a position to be first agreed in writing with the Local Planning Authority and shall be of a size and species to be agreed in writing by the Local Planning Authority and shall be planted in the first planting season following the completion of the development, unless superseded by development carried out pursuant to planning permission ref. 78343/APP/2025/719, dated 20.05.2026, for the redevelopment of the site.","Where damage is less severe, a schedule of r","The decision to GRANT planning permission has been taken having regard to all relevant planning legislation, regulations, guidance, circulars and Council policies, including The Human Rights Act (1998) (HRA 1998) which makes it unlawful for the Council to act incompatibly with Convention rights, specifically Article 6 (right to a fair hearing); Article 8 (right to respect for private and family life); Article 1 of the First Protocol (protection of property) and Article 14 (prohibition of discrimination).","The decision to GRANT planning permission has been taken having regard to the policies and proposals in the Hillingdon Local Plan Part 1 (2012) and Part 2 (2020) set out below, including Supplementary Planning Guidance, and to all relevant material considerations, including The London Plan (2021) and national guidance.","In dealing with the application the Council has implemented the requirement in the National Planning Policy Framework to work with the applicant in a positive and proactive way. We have made available detailed advice in the form of our statutory policies from Local Plan Part 1, Local Plan Part 2, Supplementary Planning Documents, Planning Briefs and other informal written guidance, as well as offering a full pre-application advice service, in order to ensure that the applicant has been given every opportunity to submit an application which is likely to be considered favourably.","For the purposes of Condition 2, \"temporary structures\" is defined as the installation of temporary hoarding and a temporary substation to support delivery of the enabling works.","For the avoidance of doubt, \"reinstatement of the affected land\" in this context refers only to the removal of the temporary structures and the making good of land directly affected by their installation, and does not require the reversal or removal of enabling works otherwise carried out in accordance with this permission.","The requirement to remove the temporary structures and reinstate the affected land shall not apply to any works or structures that are retained or incorporated into development carried out pursuant to planning permission ref. 78343/APP/2025/719, dated 20.05.2026, for the redevelopment of the site.","The applicant is advised that the submitted ground contamination reports identify the presence of per- and polyfluoroalkyl substances (PFAS) in groundwater and potential risks associated with deeper groundworks.","Any subsequent application for the discharge of relevant conditions secured under planning permission reference 78343/APP/2025/719 for main construction works, including piling, basements or other deep foundations, is likely to require the submission of a detailed foundation works risk assessment and updated groundwater monitoring data. This should demonstrate that the proposed works would not create preferential pathways for contamination into underlying aquifers, in accordance with current Environment Agency guidance.","The applicant is therefore strongly encouraged to engage with the Local Planning Authority and the Environment Agency at an early stage in relation to these requirements.","Environmental permit - Flood risk activities - advice to applicant","The Environmental Permitting (England and Wales) Regulations 2016 require a permit or exemption to be obtained for any of the following activities:","- erecting any temporary or permanent structure in, over or under a main river, such as a culvert, outfall, weir, dam, pipe crossing, erosion protection, scaffolding or bridge","- altering, repairing or maintaining any temporary or permanent structure in, over or under a main river, where the work could affect the flow of water in the river or affect any drainage work","- building or altering any permanent or temporary structure designed to contain or divert flood waters from a main river","- dredging, raising or removing any material from a main river, including when you are intending to improve flow in the river or use the materials removed","- diverting or impounding the flow of water or changing the level of water in a main river","- quarrying or excavation within 16 metre"],"actual_commencement_date":null,"pp_id":"14382175","decision_target_date":"05/06/2026","valid_date":"19/11/2025","lpa_app_no":"78343/APP/2025/2925","locality":null,"appeal_decision_date":null,"parking_details":null,"decision_process":"Committee","street_name":"UXBRIDGE ROAD","last_synced":"2026-09-05T01:48:11.821Z","site_number":null,"centroid_easting":511522.0,"polygon":null,"ward":"WOOD END 2022","centroid_northing":180520.0,"application_type":"All Other","uprn":null,"lapsed_date":"05/06/2029","actual_completion_date":null,"decision":"Approved","site_name":"Hayes Bridge Retail Park","borough":"Hillingdon","last_date_consultation_comments":"28/12/2025","application_type_full":"Full planning permission","url_planning_app":"http://planning.hillingdon.gov.uk/OcellaWeb/planningDetails?reference=78343/APP/2025/2925","decision_date":"05/06/2026","bo_system":"CSV Data Import","development_type":null,"appeal_status":null,"date_building_work_completed_under_previous_permission":null,"description":"Proposed enabling works (site clearance and ground preparation).","appeal_decision":null,"date_building_work_started_under_previous_permission":null,"epc_number":null,"last_updated":"2026-09-02T22:00:13.069Z","centroid":{"lon":-0.394299,"lat":51.512609},"lpa_name":"Hillingdon","secondary_street_name":"HAYES","application_details":{"existing_uprns":null,"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"Entire Develpment","intended_completion_date":"11/2026","intended_commencement_date":"11/2025"}],"total_gia_gained":0,"site_area":2.3,"total_gia_existing":9321,"total_gia_lost":9321,"existing_proposed_floorspace_details":[{"gia_existing":9321,"gia_gained":0,"use_class":"EA","gia_lost":9321}],"projected_cost_of_works":"Between £2m and £100m","scheme_phasing":true,"rain_water_harvesting":false,"grey_water_reuse":false,"green_suds":false,"surface_water_discharge_percentage_reduction":0,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":0,"total_gia_existing":9321,"total_gia_lost":9321},"garden_land_lost":false,"internal_resi_water_usage":0,"infrastructure_details":{"total_annual_pm_emissions":0,"green_roof_area":0,"no_resi_units_to_have_full_fibre":0,"no_new_water_connections_required":0,"no_homes_passive_cooling":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"waste_provision":true,"percentage_demolition_construction_material_recycling":95,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"ghg_reduction_over_building_regulations":false},"ownership_status":"Private","lead_developer_company_name":"Colt Data Centre Services"},"wgs84_polygon":null,"id":"Hillingdon-78343_APP_2025_2925","reference_no_of_permission_being_relied_on":null,"title_number":null,"last_updated_by":"CSV Data Import"}