{"postcode":"UB8 2AD","status":"Approved","decision_agency":"Borough","subdivision_of_building":"See Covering Letter","appeal_start_date":null,"cil_liability":false,"decision_conditions":["The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers:","MA6054-0-P001-Rev C","MA6054-0-P003 Rev D","MA6054-0-P004 Rev D","MA6054-0-P005-Rev C","MA6054-0-P007-Rev C","MA6054-0-P008-Rev C","MA6054-0-P009-Rev C","MA6054-0-P010-Rev C","MA6054-0-P012","and shall thereafter be retained/maintained for as long as the development remains in existence.","REASON","To ensure the development complies with the provisions Hillingdon Local Plan Parts 1 (November 2012) and 2 (January 2020) and the London Plan (2021).","The development hereby permitted shall not be occupied until the following has been completed in accordance with the specified supporting plans and/or documents:","Preliminary Ecological Appraisal dated April 2025 by eco consult ltd","Tree Health & Condition Assessment reference PDG_MH_CBP_HCA_001 dated 6th August 2025","Thereafter the development shall be retained/maintained in accordance with these details for as long as the development remains in existence","REASON","To ensure that the development complies with the objectives of Policies DMHB 11, DMHB 14, DMEI 7of the Hillingdon Local Plan Part 2 (2020).","Within three months of the date of this permission a Biodiversity Gain Plan for the site, demonstrating compliance with the 10% biodiversity net gain requirement in accordance with the Environment Act 2021, has been submitted to and approved in writing by the Local Planning Authority. The Biodiversity Gain Plan should include:","i. Baseline Biodiversity Assessment: Using the latest Defra Biodiversity Metric, a report of the site's pre-development biodiversity value; and","ii.On-Site Enhancement and 30-year Habitat Management Plan (HMP) detailing measures to achieve BNG on-site, including species protection, habitat creation, and ongoing management strategies to maintain gains for a minimum of 30 years. The HMP should, as a minimum, include:","a) Description and evaluation of the features to be managed.","b) Aims, objectives and targets for management.","c) Description of the management operations necessary to achieving aims and objectives.","d) Prescriptions for management actions.","e) Prepar","Within three months of the date of this permission, a scheme to deal with contamination must be submitted to and approved by the Local Planning Authority (LPA). All works which form part of any required remediation scheme shall be completed before any further part of the development is occupied or brought into use unless the Local Planning Authority dispenses with any such requirement specifically and in writing. The scheme shall include the following measures unless the LPA dispenses with any such requirement specifically and in writing:","(a) A site investigation, including where relevant soil, soil gas, surface water, and groundwater sampling, together with the results of analysis and risk assessment shall be carried out by a suitably qualified and accredited consultant/contractor. The report should also clearly identify all risks, limitations, and recommendations for remedial measures to make the site suitable for the proposed use; and","(b) A written method statement providing detai","Trees, hedges and shrubs shown to be retained on the approved plan shall not be damaged, uprooted, felled, lopped or topped without the prior written consent of the Local Planning Authority. If any retained tree, hedge or shrub is removed or severely damaged during construction, or is found to be seriously diseased or dying another tree, hedge or shrub shall be planted at the same place or, if planting in the same place would leave the new tree, hedge or shrub susceptible to disease, then the planting should be in a position to be first agreed in writing with the Local Planning Authority and shall be of a size and species to be agreed in writing by the Local Planning Authority and shall be planted in the first planting season following the completion of the development or the occupation of the buildings, whichever is the earlier. Where damage is less severe, a schedule of remedial works necessary to ameliorate the effect of damage by tree surgery, feeding or groundwork shall be agreed","This permission does not authorise the display of advertisements or signs, separate consent for which may be required under the Town and Country Planning (Control of Advertisements) Regulations 1992. [To display an advertisement without the necessary consent is an offence that can lead to prosecution].","The Equality Act 2010 aims to safeguard individuals accessing goods, facilities, and services from discrimination based on a 'protected characteristic', including disability. In accordance with the Act, service providers must enhance access to and within their premises, especially when reasonable adjustments are feasible and straightforward to implement. The Act mandates that service providers proactively identify and eliminate barriers hindering disabled people."],"actual_commencement_date":null,"pp_id":"14379809","decision_target_date":"27/02/2026","valid_date":"13/11/2025","lpa_app_no":"79465/APP/2025/2857","locality":null,"appeal_decision_date":null,"parking_details":{"no_existing_car":189,"net_car":-17,"no_proposed_car":172},"decision_process":"Delegated","street_name":"HIGH STREET","last_synced":"2026-06-02T09:49:52.202Z","site_number":null,"centroid_easting":505068.0,"polygon":null,"ward":"UXBRIDGE 2022","centroid_northing":182852.0,"application_type":"All Other","uprn":null,"lapsed_date":"27/02/2029","actual_completion_date":null,"decision":"Approved","site_name":"Monster Energy Europe Ltd, 7 Cowley Business Park","borough":"Hillingdon","last_date_consultation_comments":"11/12/2025","application_type_full":"Full planning permission","url_planning_app":"http://planning.hillingdon.gov.uk/OcellaWeb/planningDetails?reference=79465/APP/2025/2857","decision_date":"27/02/2026","bo_system":"CSV Data Import","development_type":null,"appeal_status":null,"date_building_work_completed_under_previous_permission":null,"description":"Provision of outdoor amenity space and associated signage with external works and landscaping to facilitate the development (part retrospective application).","appeal_decision":null,"date_building_work_started_under_previous_permission":null,"epc_number":null,"last_updated":"2026-05-27T22:00:13.030Z","centroid":{"lon":-0.486574,"lat":51.534806},"lpa_name":"Hillingdon","secondary_street_name":"COWLEY","application_details":{"existing_uprns":null,"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"Entire Development","intended_completion_date":"06/2025","intended_commencement_date":"06/2025"}],"total_gia_gained":0,"site_area":0.8842000000000001,"total_gia_existing":5500,"total_gia_lost":0,"existing_proposed_floorspace_details":[{"gia_existing":5500,"use_class":"EG1","gia_gained":0,"gia_lost":0}],"projected_cost_of_works":"Up to £2m","scheme_phasing":true,"rain_water_harvesting":false,"grey_water_reuse":false,"building_details":[{"no_storeys":1,"max_height":2.59,"building_ref":"Shipping Containers"},{"no_storeys":1,"max_height":2,"building_ref":"Bin Store"}],"green_suds":false,"surface_water_discharge_percentage_reduction":0,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":0,"total_gia_existing":5500,"total_gia_lost":0},"garden_land_lost":false,"internal_resi_water_usage":0,"infrastructure_details":{"total_annual_pm_emissions":0,"green_roof_area":0,"no_resi_units_to_have_full_fibre":0,"no_new_water_connections_required":0,"no_homes_passive_cooling":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"waste_provision":true,"percentage_demolition_construction_material_recycling":0,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"ghg_reduction_over_building_regulations":false},"ownership_status":"Private","lead_developer_company_name":"Morgan Lovell"},"wgs84_polygon":null,"id":"Hillingdon-79465_APP_2025_2857","reference_no_of_permission_being_relied_on":null,"title_number":null,"last_updated_by":"CSV Data Import"}