{"decision":"Approved","last_date_consultation_comments":"10/03/2026","wgs84_polygon":{"coordinates":[[[-0.479372,51.604499],[-0.479349,51.604494],[-0.479204,51.604456],[-0.479204,51.604469],[-0.479206,51.604482],[-0.479211,51.604493],[-0.479227,51.604545],[-0.479197,51.604581],[-0.479195,51.604583],[-0.47927,51.604611],[-0.479325,51.604633],[-0.479359,51.604646],[-0.479503,51.604707],[-0.479593,51.604558],[-0.479508,51.604535],[-0.479372,51.604499]]],"type":"Polygon"},"date_building_work_started_under_previous_permission":"10/06/2025","ward":"HARE/D VILLAGES 2022","site_number":null,"polygon":{"geometries":[{"coordinates":[[[505406.35,190612.94],[505407.95,190612.34],[505418.08,190608.39],[505418.08,190609.79],[505417.88,190611.19],[505417.48,190612.49],[505416.28,190618.19],[505418.28,190622.29],[505418.38,190622.49],[505413.18,190625.49],[505409.28,190627.89],[505406.88,190629.29],[505396.78,190635.79],[505390.88,190619.09],[505396.85,190616.74],[505406.35,190612.94]]],"type":"Polygon"}],"type":"GeometryCollection"},"appeal_status":null,"application_type_full":"Full planning permission","borough":"Hillingdon","lpa_name":"Hillingdon","postcode":null,"appeal_start_date":null,"appeal_decision_date":null,"status":"Approved","valid_date":"11/02/2026","site_name":"ASHLEIGH","decision_date":"08/07/2026","pp_id":"14693483","actual_completion_date":null,"url_planning_app":"http://planning.hillingdon.gov.uk/OcellaWeb/planningDetails?reference=795/APP/2026/358","application_details":{"surface_water_discharge_percentage_reduction":0,"site_area":0.04,"existing_uprns":null,"projected_cost_of_works":"Up to £2m","scheme_phasing":true,"garden_land_lost":false,"infrastructure_details":{"fire_suppression_system_proposed":false,"green_roof_area":0,"waste_provision":true,"percentage_demolition_construction_material_recycling":0,"ghg_reduction_over_building_regulations":false,"no_homes_to_have_electrical_heating":0,"no_resi_units_to_have_full_fibre":0,"total_annual_pm_emissions":0,"total_annual_nox_emissions":0,"no_homes_passive_cooling":0,"no_new_water_connections_required":1,"no_new_gas_connections_required":1,"no_non_resi_units_to_have_full_fibre":0,"mobile_network_operators_consultation":false,"urban_greening_factor_score":0},"internal_resi_water_usage":140,"ownership_status":"Private","non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_lost":0,"total_gia_gained":0,"total_gia_existing":190},"existing_proposed_floorspace_details":[{"gia_existing":190,"use_class":"C3","gia_gained":0,"gia_lost":0}],"green_suds":false,"phasing_details":[{"phase_detail":"Entire development","intended_completion_date":"10/2026","intended_commencement_date":"04/2026"}],"total_gia_gained":0,"total_gia_existing":190,"affordable_housing_fast_track":false,"grey_water_reuse":false,"total_gia_lost":0,"residential_details":{"total_no_proposed_residential_affordable_units":0,"total_no_proposed_residential_units_starter_homes":0,"total_no_proposed_residential_units_market_for_sale":2,"total_no_proposed_residential_units":2,"affordable_percentage":0.0,"total_no_existing_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_proposed_residential_units_shared_equity":0,"total_no_existing_residential_units_london_living_rent":0,"total_no_proposed_residential_units_self_build_and_custom_build":0,"total_no_existing_residential_units_discount_market_sale":0,"total_no_proposed_residential_units_social_rent":0,"residential_units":[{"no_habitable_rooms":8,"change_type":"Loss","sheltered_accommodation":false,"no_bedrooms":5,"unit_type":"Semi Detached Home","provision_for_older_persons":false,"gia":190,"tenure":"Market for sale"},{"no_habitable_rooms":2,"provider":"Private","change_type":"Gain","no_bedrooms":2,"unit_type":"Flat Apartment Maisonette","gia":74,"tenure":"Market for sale"},{"no_habitable_rooms":1,"provider":"Private","change_type":"Gain","no_bedrooms":3,"unit_type":"Flat Apartment Maisonette","gia":116,"tenure":"Market for sale"}],"total_no_existing_residential_units_london_shared_ownership":0,"total_no_proposed_residential_units_market_for_rent":0,"total_no_existing_residential_units_london_affordable_rent":0,"total_no_existing_residential_units_market_for_sale":1,"total_no_existing_residential_units_intermediate":0,"total_no_proposed_bedrooms":5,"total_no_proposed_residential_units_london_affordable_rent":0,"total_no_proposed_residential_units_discount_market_rent":0,"total_no_proposed_residential_units_london_living_rent":0,"dwelling_density":0,"total_no_proposed_residential_units_discount_market_sale":0,"total_no_proposed_residential_units_intermediate":0,"total_no_proposed_residential_units_london_shared_ownership":0,"total_no_existing_residential_units_affordable_rent":0,"total_no_existing_residential_units_shared_equity":0,"total_no_existing_residential_units":1,"total_no_existing_residential_units_social_rent":0,"total_no_proposed_residential_units_discount_market_rent_charged_at_london_rents":0,"total_gia_gained":190,"total_no_proposed_residential_units_affordable_rent":0,"total_no_existing_residential_affordable_units":0,"total_gia_lost":190,"total_no_existing_residential_units_discount_market_rent":0,"habitable_rooms_density":null,"total_no_existing_residential_units_self_build_and_custom_build":0,"total_no_existing_residential_units_market_for_rent":0,"total_no_existing_residential_units_starter_homes":0},"rain_water_harvesting":false,"occupation_status":"Occupied"},"development_type":null,"centroid_easting":505404.0,"decision_target_date":"14/07/2026","decision_agency":"Borough","actual_commencement_date":null,"lpa_app_no":"795/APP/2026/358","decision_process":"Delegated","lapsed_date":"08/07/2029","uprn":null,"bo_system":"CSV Data Import","cil_liability":true,"street_name":"THE GREEN","locality":null,"application_type":"All Other","epc_number":"0000-0000-0000-0000-0000","decision_conditions":["The development hereby permitted shall be begun before the expiration of three years from the date of this permission.","REASON","To comply with Section 91 of the Town and Country Planning Act 1990.","The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans:","003 (Existing Block and Location Plans)","004B (Proposed Block and Location Plans)","002B (Proposed Plans, Elevations and Accommodation Schedule)","Arboricultural Impact Assessment by Davies Arboriculture Ltd, Ref. 26049-DA-AIA-01, dated 13 May 2026","REASON","To ensure the development complies with the provisions of the Hillingdon Local Plan Part 1 (2012) and Part 2 (2020), and the London Plan (2021).","Prior to commencement of development, a Construction Management Plan (CMP) shall be submitted to and approved in writing by the Local Planning Authority. The plan shall detail:","(i) The phasing of development works","(ii) The hours during which development works will occur (please refer to informative I15 for maximum permitted working hours)","(iii) Measures to prevent mud and dirt tracking onto footways and adjoining roads (including wheel washing facilities where necessary)","(iv) Traffic management and access arrangements (vehicular and pedestrian) and parking provisions for contractors during the development process (including measures to reduce the numbers of construction vehicles accessing the site during peak hours)","(v) Measures to reduce the impact of the development on local air quality and dust through minimising emissions throughout the demolition and construction process","(vi) The storage of demolition/construction materials on site.","The approved details shall be implemented and","All external materials, finishes and architectural detailing used in the development, including new doors, door surrounds, door head details, external pipework, vents and any making good to the existing elevations, shall match the existing building in colour, texture, profile and appearance, unless otherwise agreed in writing by the Local Planning Authority.","REASON","To preserve the character and appearance of the locally listed building and Harefield Village Conservation Area, in accordance with Policies DMHB 1, DMHB 3, DMHB 4, DMHB 5, DMHB 11 and DMHD 1 of the Hillingdon Local Plan Part 2 (2020), Policy D4 of the London Plan (2021) and the National Planning Policy Framework (2024).","Prior to commencement of development, the tree protection measures shown within the approved Arboricultural Impact Assessment by Davies Arboriculture Ltd, Ref. 26049-DA-AIA-01, dated 13 May 2026 shall be installed. The approved tree protection measures shall be retained for the duration of the works and the development shall thereafter be carried out in accordance with the approved arboricultural details.","No excavation, storage of materials, parking of vehicles, ground level changes or construction activity shall take place within any Root Protection Area other than in accordance with the approved Arboricultural Impact Assessment.","REASON","To safeguard protected trees, including the mature Yew tree, and to preserve the verdant character of the site and Harefield Village Conservation Area, in accordance with Policies DMHB 11 and DMHB 14 of the Hillingdon Local Plan Part 2 (2020) and Policies G5 and G7 of the London Plan (2021).","Prior to the first occupation of the development as two separate residential units, details of all new boundary treatments, including their position, height, materials and finish, shall be submitted to and approved in writing by the Local Planning Authority. The approved boundary treatments shall be installed in accordance with the approved details prior to first occupation of the development as two separate residential units and shall thereafter be retained.","REASON","To safeguard the character and appearance of the locally listed building, the Harefield Village Conservation Area, the visual amenity of the site, and the residential amenity of future occupiers, in accordance with Policies DMHB 1, DMHB 4, DMHB 11 and DMHB 18 of the Hillingdon Local Plan Part 2 (2020) and Policies D3 and D4 of the London Plan (2021).","Prior to first occupation of the units as separate dwellings, the three on-site parking spaces shown on the approved Proposed Block Plan (Drawing No. 004B) shall be laid out, made available for use and thereafter retained for the lifetime of the development.","REASON","To ensure adequate on-site parking provision and to prevent additional parking pressure on the local highway network, in accordance with Policies DMT 1, DMT 2 and DMT 6 of the Hillingdon Local Plan Part 2 (2020) and Policy T6 of the London Plan (2021).","Prior to the first occupation of the development hereby approved, active electric vehicle charging provision shall be installed for each of the approved parking spaces and thereafter retained and maintained for the lifetime of the development. For the avoidance of doubt, three active electric vehicle charging spaces shall be provided.","REASON","To promote sustainable transport and reduce emissions, in accordance with Policy T6.1 of the London Plan (2021) and Policy DMT 6 of the Hillingdon Local Plan Part 2 (2020).","Prior to the first occupation of the development hereby approved, details of secure and covered cycle parking shall be submitted to and approved in writing by the Local Planning Authority. The submitted details shall include provision for a minimum of one cycle parking space for Flat 1 and two cycle parking spaces for Flat 2. The approved cycle parking shall be installed prior to occupation and thereafter retained for the lifetime of the development.","REASON","To ensure appropriate cycle parking provision and promote sustainable modes of transport, in accordance with Policies T5 and T6 of the London Plan (2021) and Policies DMT 1 and DMT 2 of the Hillingdon Local Plan Part 2 (2020).","Prior to the first occupation of the development hereby approved, the refuse and recycling storage facilities shown on the approved plans shall be provided and thereafter retained as such for the lifetime of the development.","REASON","To ensure adequate waste management provision in accordance with Policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020).","On this decision notice policies from the Councils Local Plan: Part 1 - Strategic Policies appear first, then relevant Local Plan Part 2 (2020), then London Plan Policies (2021). Hillingdon's Full Council adopted the Hillingdon Local Plan: Part 1 - Strategic Policies on 8 November 2012 and the Hillingdon Local Plan Part 2 on 16 January 2020.","In dealing with the application the Council has implemented the requirement in the National Planning Policy Framework to work with the applicant in a positive and proactive way. We have made available detailed advice in the form of our statutory policies from Local Plan Part 1, Local Plan Part 2, Supplementary Planning Documents, Planning Briefs and other informal written guidance in order to ensure that the applicant has been given every opportunity to submit an application which is likely to be considered favourably.","The decision to GRANT planning permission has been taken having regard to all relevant planning legislation, regulations, guidance, circulars and Council policies, including The Human Rights Act (1998) (HRA 1998) which makes it unlawful for the Council to act incompatibly with Convention rights, specifically Article 6 (right to a fair hearing); Article 8 (right to respect for private and family life); Article 1 of the First Protocol (protection of property) and Article 14 (prohibition of discrimination).","Under the terms of the Planning Act 2008 (as amended) and Community Infrastructure Levy Regulations 2010 (as amended), this development is liable to pay the London Borough of Hillingdon Community Infrastructure Levy (CIL) and the Mayor of London's Community Infrastructure Levy (CIL). This will be calculated in accordance with the London Borough of Hillingdon CIL Charging Schedule 2014 and the Mayor of London's CIL Charging Schedule 2012. Before commencement of works the development parties must notify the London Borough of Hillingdon of the commencement date for the construction works (by submitting a Commencement Notice) and assume liability to pay CIL (by submitting an Assumption of Liability Notice) to the Council at planning@hillingdon.gov.uk. The Council will then issue a Demand Notice setting out the date and the amount of CIL that is payable. Failure to submit a valid Assumption of Liability Notice and Commencement Notice prior to commencement of the development may result in su","Nuisance from demolition and construction works is subject to control under The Control of Pollution Act 1974, the Clean Air Acts and other related legislation. In particular, you should ensure that the following are complied with:-","A. Demolition and construction works which are audible at the site boundary shall only be carried out between the hours of 08.00 and 18.00 hours Monday to Friday and between the hours of 08.00 hours and 13.00 hours on Saturday. No works shall be carried out on Sundays, Bank or Public Holidays.","B. All noise generated during such works shall be controlled in compliance with British Standard Code of Practice BS 5228:2009.","C. Dust emissions shall be controlled in compliance with the Mayor of London's Best Practice Guidance' The Control of dust and emissions from construction and demolition.","D. No bonfires that create dark smoke or nuisance to local residents.","You are advised to consult the Council's Environmental Protection Unit (www.hillingdon.gov.uk/nois"],"reference_no_of_permission_being_relied_on":null,"secondary_street_name":"HAREFIELD","centroid_northing":190621.0,"last_updated":"2026-10-06T22:00:12.171Z","centroid":{"lon":-0.479403,"lat":51.604572},"subdivision_of_building":null,"last_synced":"2026-10-07T03:13:10.383Z","last_updated_by":"CSV Data Import","title_number":null,"appeal_decision":null,"date_building_work_completed_under_previous_permission":null,"id":"Hillingdon-795_APP_2026_358","parking_details":{"no_proposed_car":3,"no_existing_car":3,"net_car":0},"description":"Proposed subdivision of existing dwelling house into two separate private units. Proposals to comprise of a ground floor two-bedroom unit with disabled access and a three-bedroom unit to first and second floors. Both with associated private amenity space and parking."}