{"postcode":"HA4 0HG","status":"Approved","decision_agency":"Borough","subdivision_of_building":"Rear of existing GF shops, separate self-contained residential accommodation above not part of this application ","appeal_start_date":null,"cil_liability":false,"decision_conditions":["The development hereby permitted shall be begun before the expiration of three years from the date of this permission.","REASON","To comply with Section 91 of the Town and Country Planning Act 1990","The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers:","25/14LD/02","and shall thereafter be retained/maintained for as long as the development remains in existence.","REASON","To ensure the development complies with the provisions of the Hillingdon Local Plan Part 1 (2012), Part 2 (2020) and the London Plan (2021).","The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building and shall thereafter be retained as such.","REASON","To safeguard the visual amenities of the area and to ensure that the proposed development does not have an adverse effect upon the appearance of the existing building in accordance with Policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020)","The ground floor commercial units hereby approved shall be used only for purposes falling within Use Class E(c)(i), E(c)(ii), E(c)(iii), E(e), or E(g)(i) of the Schedule to the Town and Country Planning (Use Classes) Order 1987 (as amended), and for no other purpose within Class E of that Order, or any provision equivalent to that Class in any statutory instrument revoking and re-enacting that Order with or without modification.","Reason:","To safeguard the vitality and viability of the town centre, to protect the amenities of neighbouring occupiers, and to ensure the use remains appropriate to the character and function of the area, in accordance with Policies DMTC 1 and DME 3 of the Hillingdon Local Plan Part 2 (2020), London Plan (2021), and NPPF (2024).","The premises shall not be open for customers/clients/persons outside the following hours: -","[0800 to 1800], Mondays - Fridays","[0800 to 1500] Saturdays","REASON","To safeguard the residential amenity of the occupiers of adjoining and nearby properties in accordance with policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020).","Notwithstanding the provisions of the Town and Country Planning (General Permitted Development)(England)Order 2015 (or any order revoking and re-enacting that Order with or without modification), no additional windows, doors or other openings shall be constructed in the walls or roof slopes of the development hereby approved.","REASON","To prevent overlooking to adjoining properties in accordance with policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020).","Prior to development commencing, the applicant shall submit a demolition and construction management plan to the Local Planning Authority for its approval.  The plan shall detail:","(i)  The phasing of development works","(ii) The hours during which development works will occur (please refer to informative I15 for maximum permitted working hours).","(iii) A programme to demonstrate that the most valuable or potentially contaminating materials and fittings can be removed safely and intact for later re-use or processing.","(iv)Measures to prevent mud and dirt tracking onto footways and adjoining roads (including wheel washing facilities).","(v) Traffic management and access arrangements (vehicular and pedestrian) and parking provisions for contractors during the development process (including measures to reduce the numbers of construction vehicles accessing the site during peak hours).","(vi) Measures to reduce the impact of the development on local air quality and dust through minimising emissions","Nuisance from demolition and construction works is subject to control under The Control of Pollution Act 1974, the Clean Air Acts and other related legislation. In particular, you should ensure that the following are complied with:-","A. Demolition and construction works which are audible at the site boundary shall only be carried out between the hours of 08.00 and 18.00 hours Monday to Friday and between the hours of 08.00 hours and 13.00 hours on Saturday. No works shall be carried out on Sundays, Bank or Public Holidays.","B. All noise generated during such works shall be controlled in compliance with British Standard Code of Practice BS 5228:2009.","C. Dust emissions shall be controlled in compliance with the Mayor of London's Best Practice Guidance' The Control of dust and emissions from construction and demolition.","D. No bonfires that create dark smoke or nuisance to local residents.","You are advised to consult the Council's Environmental Protection Unit (www.hillingdon.gov.uk/nois","Your attention is drawn to the fact that the planning permission does not override property rights and any ancient rights of light that may exist. This permission does not empower you to enter onto land not in your ownership without the specific consent of the owner. If you require further information or advice, you should consult a solicitor.","The decision to GRANT planning permission has been taken having regard to all relevant planning legislation, regulations, guidance, circulars and Council policies, including The Human Rights Act (1998) (HRA 1998) which makes it unlawful for the Council to act incompatibly with Convention rights, specifically Article 6 (right to a fair hearing); Article 8 (right to respect for private and family life); Article 1 of the First Protocol (protection of property) and Article 14 (prohibition of discrimination).","On this decision notice policies from the Councils Local Plan: Part 1 - Strategic Policies appear first, then relevant Local Plan Part 2 (2020), then London Plan Policies (2021). Hillingdon's Full Council adopted the Hillingdon Local Plan: Part 1 - Strategic Policies on 8 November 2012 and the Hillingdon Local Plan Part 2 on 16 January 2020."],"actual_commencement_date":null,"pp_id":"14507329","decision_target_date":"16/02/2026","valid_date":"21/11/2025","lpa_app_no":"79807/APP/2025/2959","locality":null,"appeal_decision_date":null,"parking_details":{"no_existing_car":2,"net_car":0,"no_proposed_car":2},"decision_process":"Delegated","street_name":"RUISLIP","last_synced":"2026-06-02T09:52:22.290Z","site_number":null,"centroid_easting":511229.0,"polygon":null,"ward":"SOUTH RUISLIP 2022","centroid_northing":185527.0,"application_type":"All Other","uprn":null,"lapsed_date":"16/02/2029","actual_completion_date":null,"decision":"Approved","site_name":"12-14 LONG DRIVE","borough":"Hillingdon","last_date_consultation_comments":"15/01/2026","application_type_full":"Full planning permission","url_planning_app":"http://planning.hillingdon.gov.uk/OcellaWeb/planningDetails?reference=79807/APP/2025/2959","decision_date":"16/02/2026","bo_system":"CSV Data Import","development_type":null,"appeal_status":null,"date_building_work_completed_under_previous_permission":null,"description":"Erection of a single storey rear extension to create an Office Space","appeal_decision":null,"date_building_work_started_under_previous_permission":null,"epc_number":null,"last_updated":"2026-05-18T10:01:51.651Z","centroid":{"lon":-0.396939,"lat":51.557669},"lpa_name":"Hillingdon","secondary_street_name":null,"application_details":{"existing_uprns":null,"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"No phasing","intended_completion_date":"05/2026","intended_commencement_date":"03/2026"}],"total_gia_gained":62.8,"site_area":0.027100000000000003,"total_gia_existing":51.3,"total_gia_lost":0,"existing_proposed_floorspace_details":[{"gia_existing":51.3,"use_class":"EC2","gia_gained":62.8,"gia_lost":0}],"projected_cost_of_works":"Up to £2m","scheme_phasing":true,"rain_water_harvesting":false,"grey_water_reuse":false,"green_suds":false,"surface_water_discharge_percentage_reduction":0,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":62.8,"total_gia_existing":51.3,"total_gia_lost":0},"garden_land_lost":false,"internal_resi_water_usage":0,"infrastructure_details":{"total_annual_pm_emissions":0,"green_roof_area":0,"no_resi_units_to_have_full_fibre":0,"no_new_water_connections_required":0,"no_homes_passive_cooling":0,"no_non_resi_units_to_have_full_fibre":1,"total_annual_nox_emissions":0,"waste_provision":false,"percentage_demolition_construction_material_recycling":0,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"ghg_reduction_over_building_regulations":false,"waste_details":[{"external_dry_recycling":true,"external_food_waste":true,"unit_reference":"14","external_residual_waste":true,"reason_for_no_provision":"Existing provision","internal_residual_waste":true,"internal_food_waste":true,"internal_dry_recycling":true}]},"ownership_status":"Private"},"wgs84_polygon":null,"id":"Hillingdon-79807_APP_2025_2959","reference_no_of_permission_being_relied_on":null,"title_number":null,"last_updated_by":"CSV Data Import"}