{"postcode":"HA4 8NL","status":"Approved","decision_agency":"Borough","subdivision_of_building":null,"appeal_start_date":null,"cil_liability":true,"decision_conditions":["The development hereby permitted shall be begun before the expiration of three years from the date of this permission.","REASON","To comply with Section 91 of the Town and Country Planning Act 1990.","The development hereby permitted shall not be carried out except in complete accordance with the details contained in the planning application hereby approved and plan numbers:","KA2413 - 200","KA2413 - 203 Rev A","KA2413 - 204 Rev A","KA2413 - 205 Rev A","unless the Local Planning Authority otherwise first agrees in writing.","REASON","To ensure the development complies with the provisions of the Hillingdon Local Plan Part 1 (2012) and Part 2 (2020), and the London Plan (2021).","The materials to be used for the external surfaces, including walls, roofs, doors and windows shall strictly be of the same colour, type and texture as those used in the existing building, unless the Local Planning Authority otherwise first agrees in writing.","REASON","To safeguard the visual amenities of the area and to ensure that the proposed development does not have an adverse effect upon the appearance of the existing building or Conservation Area, in accordance with Policies DMHB 4 and DMHB 11 of the Hillingdon Local Plan Part 2 (2020).","Prior to the construction, above slab level, of the dwelling hereby approved, the front dormer to no. 23 shall be sited and installed, in accordance with the approved plans.","REASON","To safeguard the visual amenities of the area and to ensure that the proposed development does not have an adverse effect upon the appearance of the existing building or Conservation Area, or amenities of the occupiers of this dwelling, in accordance with Policies DMHB 4 and DMHB 11 of the Hillingdon Local Plan Part 2 (2020).","No development (including demolition) shall take place until a Construction Management Plan (CMP) has been submitted to and approved in writing by the Local Planning Authority. The CMP shall include details of:","- Construction vehicle routing and access arrangements","- Contractor parking and loading/unloading areas","- Measures to prevent mud, dust and debris on the public highway","- Hours of construction and delivery","- Contact details for the site manager","The approved plan shall be implemented and maintained for the duration of the works.","REASON","To safeguard the amenity of the surrounding area, minimise environmental impacts during construction, and ensure compliance with best practice guidance, in accordance with Policy DMT 1 and Policy EM8 of the Hillingdon Local Plan Part 2 (2020) and Policy D14 of the London Plan (2021).","The scheme for parking and manoeuvring of vehicles shown on the submitted plans shall be laid out for both no. 23 and the dwelling hereby permitted prior to the first occupation of the new dwelling, and those areas shall not thereafter be used for any other purpose.","REASON","To enable vehicles to draw off, park and turn clear of the highway to minimise danger, obstruction and inconvenience to users of the adjoining highway.","No development above slab level shall take place until a landscape scheme has been submitted to and approved in writing by the Local Planning Authority. The scheme shall include: -","1.    Details of Soft Landscaping:","1.a  Planting plans (at not less than a scale of 1:100),","1.b  Written specification of planting and cultivation works to be undertaken,","1.c  Schedule of plants giving species, plant sizes, and proposed numbers/densities where appropriate","2. Details of Hard Landscaping:","2.a Refuse Storage","2.b Means of enclosure/boundary treatments","2.c Hard Surfacing Materials","2.d External Lighting","2.e Other structures (such as play equipment and furniture)","3. Living Walls and Roofs:","3.a Details of the inclusion of living walls and roofs, where applicable.","4. Details of Landscape Maintenance","4.a Landscape Maintenance Schedule for a minimum period of 5 years.","4.b Proposals for the replacement of any tree, shrub, or area of surfing/seeding within the landscaping scheme which dies or in the","Prior to the first occupation of the dwelling hereby permitted, one active Electric Vehicle Charging Point, and associated infrastructure, shall be installed within its respective parking area, and thereafter retained for the lifetime of the development.","REASON","To support sustainable travel and reduce carbon emissions, in accordance with Policy T6.1 of the London Plan (2021).","The approved dwelling shall not be occupied until the cycle storage facilities have been provided in accordance with the approved plans. Thereafter, these facilities shall be permanently retained on site and be kept available for the use of the occupants.","REASON","To ensure the provision and retention of facilities for cyclists to the development and hence the availability of sustainable forms of transport to the site in accordance with Policy DMT 5 of the Hillingdon Local Plan Part 2 (2020) and Policy T5 of the London Plan (2021).","The approved dwelling shall achieve a water efficiency standard of no more than 110 litres per person per day maximum water consumption (to include a fixed factor of water for outdoor use of 5 litres per person per day) in accordance with the optional requirement defined within Approved Document G of the Building Regulations. The measures to achieve this standard shall be implemented prior to first occupation and maintained for the lifetime of the development.","REASON","To ensure the use of water resources in a sustainable manner, in accordance with Policy SI 5 of the London Plan (2021).","The approved dwelling shall achieve an energy efficiency of at least 10% below the relevant Building Regulations, as detailed within the statutory Building Regulation - Conservation of fuel and power: Approved Document L.","REASON","To ensure the appropriate integration of energy efficiency measures, in accordance with Policy SI 2 of the London Plan (2021).","No development (including demolition) shall take place until a scheme for the provision of sustainable water management has been submitted to and approved in writing by the Local Planning Authority. The scheme shall clearly demonstrate that sustainable drainage systems (SUDS) have been incorporated into the designs of the development in accordance with the hierarchy set out within Policy SI 13 of the London Plan and will:","1. provide information about the design storm period and intensity, the method employed to delay and control the surface water discharged from the site and the measures taken to prevent pollution of the receiving groundwater and/or surface waters;","2. include a timetable for its implementation; and","3. provide a management and maintenance plan for the lifetime of the development which shall include the arrangements for adoption by any public authority or statutory undertaker and any other arrangements to secure the operation of the scheme throughout its lifetime.","Prior to any works on site above damp proof course level, details of step free access via all points of entry and exit shall be submitted to, and approved in writing, by the Local Planning Authority. The measures implemented as approved shall be retained thereafter.","REASON","To ensure housing of an inclusive design is achieved and maintained in accordance with Policies D5 and D7 of the London Plan (2021).","The dwelling hereby approved shall not be occupied until certification of compliance with the technical specifications for an M4(2) dwelling, as set out in Approved Document M to the Building Regulations (2010) 2015, has been submitted to, and approved in writing, by the Local Planning Authority. All such provisions must remain in place for the lifetime of the building.","REASON","To allow the Building Control body to require the development to comply with the optional Building Regulations standards, and to ensure the appropriate quantity and standard of accessible and adaptable housing is constructed and maintained in accordance with Policy D7 of the London Plan.","No development shall take place on any part of the site until a Biodiversity Gain Plan for the site, demonstrating compliance with the 10% biodiversity net gain requirement in accordance with the Environment Act 2021, has been submitted to and approved in writing by the Local Planning Authority. The Biodiversity Gain Plan should include:","i. Baseline Biodiversity Assessment: Using the latest Defra Biodiversity Metric, a report of the site's pre-development biodiversity value; and","ii. On-Site Enhancement and 30-year Habitat Management Plan (HMP) detailing measures to achieve BNG on-site, including species protection, habitat creation, and ongoing management strategies to maintain gains for a minimum of 30 years. The HMP should, as a minimum, include:","a) Description and evaluation of the features to be managed.","b) Aims, objectives and targets for management.","c) Description of the management operations necessary to achieving aims and objectives.","d) Prescriptions for management actions.","Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) (or any Order revoking and re-enacting that Order), no development falling within Classes A, C, D, E or F of Part 1 of Schedule 2 shall be carried out to the new dwelling without the prior, express planning permission of the Local Planning Authority.","REASON","In order that the Local Planning Authority can properly consider the effect of any future proposals on the character and visual amenities of the locality and amenity of adjacent properties.","The decision to GRANT planning permission has been taken having regard to all relevant planning legislation, regulations, guidance, circulars and Council policies, including The Human Rights Act (1998) (HRA 1998) which makes it unlawful for the Council to act incompatibly with Convention rights, specifically Article 6 (right to a fair hearing); Article 8 (right to respect for private and family life); Article 1 of the First Protocol (protection of property) and Article 14 (prohibition of discrimination).","The decision to GRANT planning permission has been taken having regard to the policies and proposals in the Hillingdon Local Plan Part 1 (2012) and Part 2 (2020) set out below, including Supplementary Planning Guidance, and to all relevant material considerations, including The London Plan (2021) and NPPF (2024).","In dealing with the application the Council has implemented the requirement in the National Planning Policy Framework to work with the applicant in a positive and proactive way. We have made available detailed advice in the form of our statutory policies from Local Plan Part 1, Local Plan Part 2, Supplementary Planning Documents, Planning Briefs and other informal written guidance, as well as offering the opportunity to revise the scheme during the course of the application, in order to ensure that the applicant has been given every opportunity to submit an application which is likely to be considered favourably.","Nuisance from demolition and construction works is subject to control under The Control of Pollution Act 1974, the Clean Air Acts and other related legislation. In particular, you should ensure that the following are complied with:-","A. Demolition and construction works which are audible at the site boundary shall only be carried out between the hours of 08.00 and 18.00 hours Monday to Friday and between the hours of 08.00 hours and 13.00 hours on Saturday. No works shall be carried out on Sundays, Bank or Public Holidays.","B. All noise generated during such works shall be controlled in compliance with British Standard Code of Practice BS 5228:2009.","C. Dust emissions shall be controlled in compliance with the Mayor of London's Best Practice Guidance' The Control of dust and emissions from construction and demolition.","D. No bonfires that create dark smoke or nuisance to local residents.","You are advised to consult the Council's Environmental Protection Unit (www.hillingdon.gov.uk/nois","You are advised that if any part of the development hereby permitted encroaches by either its roof, walls, eaves, gutters, or foundations, then a new planning application may have to be submitted. The validity of this planning permission may be challengeable by third parties if the development results in any form of encroachment onto land outside the applicant's control for which the appropriate Notice under Article 13 of the Town and Country Planning (Development Management Procedure) (England) Order 2015 has not been served.","Your attention is drawn to the need to comply with the relevant provisions of the Building Regulations, the Building Acts and other related legislation. These cover such works as - the demolition of existing buildings, the erection of a new building or structure, the extension or alteration to a building, change of use of buildings, installation of services, underpinning works, and fire safety/means of escape works. Notice of intention to demolish existing buildings must be given to the Council's Building Control Service at least 6 weeks before work starts. A completed application form together with detailed plans must be submitted for approval before any building work is commenced. For further information and advice, contact - Residents Services, Building Control, 3N/01 Civic Centre, Uxbridge (Telephone 01895 558170).","The Party Wall Act 1996 requires a building owner to notify, and obtain formal agreement from, any adjoining owner, where the building owner proposes to: carry out work to an existing party wall; build on the boundary with a neighbouring property; in some circumstances, carry out groundworks within 6 metres of an adjoining building.","Notification and agreements under this Act are the responsibility of the building owner and are quite separate from Building Regulations, or Planning Controls. The Building Control Service will assume that an applicant has obtained any necessary agreements with the adjoining owner, and nothing said or implied by the Council should be taken as removing the necessity for the building owner to comply fully with the Party Wall Act. Further information and advice is to be found in \"the Party Walls etc. Act 1996 - explanatory booklet\" published by the ODPM, available free of charge from the Residents Services Reception Desk, Level 3, Civic Centre, Uxbridge, UB8"],"actual_commencement_date":null,"pp_id":"14428535","decision_target_date":"08/05/2026","valid_date":"16/12/2025","lpa_app_no":"79822/APP/2025/3106","locality":null,"appeal_decision_date":null,"parking_details":{"no_existing_cycle":0,"no_existing_car":1,"net_car":1,"no_proposed_cycle":4,"no_proposed_car":2,"net_cycle":4},"decision_process":"Delegated","street_name":"RUISLIP","last_synced":"2026-08-07T02:39:33.802Z","site_number":null,"centroid_easting":509849.0,"polygon":null,"ward":"RUISLIP 2022","centroid_northing":187319.0,"application_type":"All Other","uprn":null,"lapsed_date":"08/05/2029","actual_completion_date":null,"decision":"Approved","site_name":"23 GREEN WALK","borough":"Hillingdon","last_date_consultation_comments":"11/01/2026","application_type_full":"Full planning permission","url_planning_app":"http://planning.hillingdon.gov.uk/OcellaWeb/planningDetails?reference=79822/APP/2025/3106","decision_date":"08/05/2026","bo_system":"CSV Data Import","development_type":null,"appeal_status":null,"date_building_work_completed_under_previous_permission":null,"description":"Erection of new dwellinghouse to side of existing dwellinghouse, erection of front dormer to existing dwellinghouse.","appeal_decision":null,"date_building_work_started_under_previous_permission":null,"epc_number":"0565-2857-7237-9721-4455","last_updated":"2026-08-06T22:00:12.367Z","centroid":{"lon":-0.416278,"lat":51.574046},"lpa_name":"Hillingdon","secondary_street_name":null,"application_details":{"existing_uprns":null,"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"Alterations to existing dwelling","intended_commencement_date":"06/2026","intended_completion_date":"08/2026"},{"phase_detail":"Erection of new dwelling","intended_commencement_date":"06/2026","intended_completion_date":"06/2027"}],"total_gia_gained":81.5,"site_area":0.0038100000000000005,"total_gia_existing":67.9,"total_gia_lost":0,"existing_proposed_floorspace_details":[{"gia_existing":67.9,"use_class":"C3","gia_gained":81.5,"gia_lost":0}],"projected_cost_of_works":"Up to £2m","scheme_phasing":true,"rain_water_harvesting":true,"grey_water_reuse":false,"building_details":[{"no_storeys":2,"max_height":8.25,"building_ref":"New dwelling"}],"green_suds":false,"surface_water_discharge_percentage_reduction":30,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":81.5,"total_gia_existing":67.9,"total_gia_lost":0},"garden_land_lost":true,"residential_details":{"total_no_proposed_residential_units_shared_equity":0,"total_no_proposed_bedrooms":2,"total_no_proposed_residential_units":1,"total_no_proposed_residential_units_london_living_rent":0,"total_no_proposed_residential_affordable_units":0,"total_no_proposed_residential_units_affordable_rent":0,"total_no_existing_residential_units":0,"total_no_proposed_residential_units_discount_market_sale":0,"total_no_proposed_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_existing_residential_units_london_living_rent":0,"total_no_existing_residential_units_shared_equity":0,"total_no_existing_residential_units_market_for_sale":0,"total_no_existing_residential_units_intermediate":0,"total_no_proposed_residential_units_market_for_rent":1,"total_no_existing_residential_units_social_rent":0,"total_no_proposed_residential_units_self_build_and_custom_build":0,"total_no_existing_residential_units_discount_market_rent":0,"total_no_proposed_residential_units_market_for_sale":0,"total_no_existing_residential_affordable_units":0,"total_no_existing_residential_units_affordable_rent":0,"habitable_rooms_density":null,"total_no_existing_residential_units_london_shared_ownership":0,"total_gia_gained":81.5,"total_no_proposed_residential_units_social_rent":0,"total_no_existing_residential_units_london_affordable_rent":0,"dwelling_density":0,"total_no_existing_residential_units_discount_market_sale":0,"total_no_proposed_residential_units_starter_homes":0,"total_no_proposed_residential_units_london_affordable_rent":0,"total_gia_lost":0,"total_no_existing_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_existing_residential_units_starter_homes":0,"total_no_proposed_residential_units_discount_market_rent":0,"total_no_proposed_residential_units_intermediate":0,"affordable_percentage":0.0,"total_no_proposed_residential_units_london_shared_ownership":0,"residential_units":[{"no_habitable_rooms":4,"provider":"Other Affordable Housing Provider","change_type":"Gain","garden_land":true,"unit_type":"Terraced Home","no_bedrooms":2,"tenure":"Market for rent","gia":81.5}],"total_no_existing_residential_units_market_for_rent":0,"total_no_existing_residential_units_self_build_and_custom_build":0},"internal_resi_water_usage":105,"infrastructure_details":{"total_annual_pm_emissions":0,"no_active_slow_ev_charging_points":1,"green_roof_area":0,"no_resi_units_to_have_full_fibre":1,"no_new_water_connections_required":1,"no_homes_passive_cooling":0,"no_passive_slow_ev_charging_points":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"waste_provision":true,"percentage_demolition_construction_material_recycling":0,"no_homes_to_have_electrical_heating":1,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":1,"ghg_reduction_over_building_regulations":true},"ownership_status":"Private"},"wgs84_polygon":null,"id":"Hillingdon-79822_APP_2025_3106","reference_no_of_permission_being_relied_on":null,"title_number":null,"last_updated_by":"CSV Data Import"}