{"postcode":"HA4 8HD","status":"Approved","decision_agency":"Borough","subdivision_of_building":null,"appeal_start_date":null,"cil_liability":true,"decision_conditions":["The development hereby permitted shall be begun before the expiration of three years from the date of this permission.","REASON","To comply with Section 91 of the Town and Country Planning Act 1990.","The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans:","KA2508 - 01","KA2508 - 06","KA2508 - 07","KA2508 - 08","REASON","To ensure the development complies with the provisions of the Hillingdon Local Plan Part 1 (2012) and Part 2 (2020), and the London Plan (2021).","Prior to development commencing, a Construction Management Plan (CMP) shall be submitted to and approved in writing by the Local Planning Authority. The plan shall detail:","(i) The phasing of development works","(ii) The hours during which development works will occur (please refer to informative I15 for maximum permitted working hours)","(iii) Measures to prevent mud and dirt tracking onto footways and adjoining roads (including wheel washing facilities where necessary)","(iv) Traffic management and access arrangements (vehicular and pedestrian) and parking provisions for contractors during the development process (including measures to reduce the numbers of construction vehicles accessing the site during peak hours)","(v) Measures to reduce the impact of the development on local air quality and dust through minimising emissions throughout the demolition and construction process","(vi) The storage of demolition/construction materials on site.","The approved details shall be implemented and maint","The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building and shall thereafter be retained as such.","REASON","To safeguard the visual amenities of the area and to ensure that the proposed development does not have an adverse effect upon the appearance of the existing building in accordance with Policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020)","Trees, hedges and shrubs shown to be retained on the approved plan(s) shall be protected during construction in accordance with the tree protection measures shown on drawing no. KA2508 - 09. Protective fencing shall be erected prior to commencement of development and retained for the duration of works.","REASON","To safeguard trees and ensure that the proposed development will preserve and enhance the visual amenities of the locality in compliance with policies DMHB 11 and DMHB 14 of the Hillingdon Local Plan Part 2 (2020) and Policies G5, G6 and G7 of the London Plan (2021).","Notwithstanding the details already submitted, no development above damp proof course shall take place until a hard and soft landscape scheme, including details of boundary treatments to ensure appropriate levels of privacy and visual screening to neighbouring properties,","has been submitted to and approved in writing by the Local Planning Authority. The scheme shall include the following : -","1.    Details of Soft Landscaping","1.a  Planting plans (at not less than a scale of 1:100)","1.b  Schedule of plants giving species, plant sizes, and proposed numbers/densities where appropriate","2. Details of Hard Landscaping","2.a Means of enclosure/boundary treatments","2.b Hard surfacing materials","2.c External lighting (where applicable)","3. Details of Landscape Maintenance","3.a Landscape Maintenance Schedule for a minimum period of 5 years.","3.b Proposals for the replacement of any tree, shrub, or area of turfing/seeding within the landscaping scheme which dies or in the opinion of the Local Planning","All hard and soft landscaping shall be carried out in accordance with the approved landscaping scheme and shall be completed within the first planting and seeding seasons following the completion of the development or the occupation of the buildings, whichever is the earlier period. All planting, seeding, turfing and landscape operations shall be carried out in accordance with current British Standards and best practice, including BS 8545:2014 Trees: from nursery to independence in the landscape (or any successor document) and BS 3936 series (2017-2021) - Nursery stock (trees, shrubs, perennials). Thereafter, the areas of hard and soft landscaping shall be permanently retained.","Any tree, shrub or area of turfing or seeding shown on the approved landscaping scheme which within a period of 5 years from the completion of development dies, is removed or in the opinion of the Local Planning Authority becomes seriously damaged or diseased shall be replaced in the same place or, if planting","Prior to the first occupation of the development hereby approved, a Parking Allocation Plan shall be submitted to and approved in writing by the Local Planning Authority. The plan shall clearly identify the allocation of the approved on-site parking spaces to individual residential units. The parking spaces shall thereafter be laid out prior to first occupation, allocated and retained in accordance with the approved details and shall not be used for any other purpose.","REASON","To ensure the satisfactory and efficient use of the approved parking provision, to prevent parking congestion and to safeguard highway safety, in accordance with Policy DMT 6 of the Hillingdon Local Plan Part 2 (2020) and Policy T6.1 of the London Plan (2021).","Prior to the first occupation of the development hereby approved, the proposed car parking spaces shall be provided with active electric vehicle charging points in accordance with the approved details. The electric vehicle charging facilities shall be retained and maintained for the lifetime of the development.","REASON","To promote sustainable transport and reduce emissions, in accordance with Policy T6.1 of the London Plan (2021) and Policy DMT 6 of the Hillingdon Local Plan Part 2 (2020).","Prior to the first occupation of the development hereby approved, secure and accessible cycle parking shall be provided in accordance with the approved plans and thereafter retained as such for the lifetime of the development.","REASON","To encourage sustainable travel in accordance with Policy T5 of the London Plan (2021).","Prior to the first occupation of the development hereby approved, the refuse and recycling storage facilities shown on the approved plans shall be provided and thereafter retained as such for the lifetime of the development.","REASON","To ensure adequate waste management provision in accordance with Policy DMHB 11 of the Hillingdon Local Plan Part 2 (2021).","All side-facing ground and first floor windows, as shown on the 'Side Elevation - South East' and 'Side Elevation - North West' on drawing no. KA2508 - 07, shall be fitted with permanently obscured glazing to a minimum of Pilkington Level 4 or equivalent prior to the first occupation of the development and shall thereafter be retained as such for the lifetime of the development. The windows shall be non-opening below 1.7 metres above finished floor level. For the avoidance of doubt, this includes the rooflights within the side roof slopes serving Flats 3 and 4.","REASON","To prevent overlooking and safeguard the privacy and amenity of existing and future occupiers, in accordance with Policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020) and Policy D6 of the London Plan (2021).","On this decision notice policies from the Councils Local Plan: Part 1 - Strategic Policies appear first, then relevant Local Plan Part 2 (2020), then London Plan Policies (2021). Hillingdon's Full Council adopted the Hillingdon Local Plan: Part 1 - Strategic Policies on 8 November 2012 and the Hillingdon Local Plan Part 2 on 16 January 2020.","In dealing with the application the Council has implemented the requirement in the National Planning Policy Framework to work with the applicant in a positive and proactive way. We have made available detailed advice in the form of our statutory policies from Local Plan Part 1, Local Plan Part 2, Supplementary Planning Documents, Planning Briefs and other informal written guidance in order to ensure that the applicant has been given every opportunity to submit an application which is likely to be considered favourably.","The decision to GRANT planning permission has been taken having regard to all relevant planning legislation, regulations, guidance, circulars and Council policies, including The Human Rights Act (1998) (HRA 1998) which makes it unlawful for the Council to act incompatibly with Convention rights, specifically Article 6 (right to a fair hearing); Article 8 (right to respect for private and family life); Article 1 of the First Protocol (protection of property) and Article 14 (prohibition of discrimination).","Under the terms of the Planning Act 2008 (as amended) and Community Infrastructure Levy Regulations 2010 (as amended), this development is liable to pay the London Borough of Hillingdon Community Infrastructure Levy (CIL) and the Mayor of London's Community Infrastructure Levy (CIL). This will be calculated in accordance with the London Borough of Hillingdon CIL Charging Schedule 2014 and the Mayor of London's CIL Charging Schedule 2012. Before commencement of works the development parties must notify the London Borough of Hillingdon of the commencement date for the construction works (by submitting a Commencement Notice) and assume liability to pay CIL (by submitting an Assumption of Liability Notice) to the Council at planning@hillingdon.gov.uk. The Council will then issue a Demand Notice setting out the date and the amount of CIL that is payable. Failure to submit a valid Assumption of Liability Notice and Commencement Notice prior to commencement of the development may result in su","Nuisance from demolition and construction works is subject to control under The Control of Pollution Act 1974, the Clean Air Acts and other related legislation. In particular, you should ensure that the following are complied with:-","A. Demolition and construction works which are audible at the site boundary shall only be carried out between the hours of 08.00 and 18.00 hours Monday to Friday and between the hours of 08.00 hours and 13.00 hours on Saturday. No works shall be carried out on Sundays, Bank or Public Holidays.","B. All noise generated during such works shall be controlled in compliance with British Standard Code of Practice BS 5228:2009.","C. Dust emissions shall be controlled in compliance with the Mayor of London's Best Practice Guidance' The Control of dust and emissions from construction and demolition.","D. No bonfires that create dark smoke or nuisance to local residents.","You are advised to consult the Council's Environmental Protection Unit (www.hillingdon.gov.uk/nois"],"actual_commencement_date":null,"pp_id":"14584433","decision_target_date":"24/04/2026","valid_date":"16/01/2026","lpa_app_no":"79873/APP/2026/104","locality":null,"appeal_decision_date":null,"parking_details":{"net_car":-2,"no_proposed_cycle":4,"no_existing_cycle":0,"no_existing_car":4,"no_proposed_car":2,"net_cycle":4},"decision_process":"Delegated","street_name":"RUISLIP","last_synced":"2026-07-26T01:49:24.561Z","site_number":null,"centroid_easting":509422.0,"polygon":null,"ward":"RUISLIP 2022","centroid_northing":187642.0,"application_type":"All Other","uprn":null,"lapsed_date":"22/04/2029","actual_completion_date":null,"decision":"Approved","site_name":"2 & 4 MANOR WAY","borough":"Hillingdon","last_date_consultation_comments":"17/02/2026","application_type_full":"Full planning permission","url_planning_app":"http://planning.hillingdon.gov.uk/OcellaWeb/planningDetails?reference=79873/APP/2026/104","decision_date":"22/04/2026","bo_system":"CSV Data Import","development_type":null,"appeal_status":null,"date_building_work_completed_under_previous_permission":null,"description":"Erection of two storey rear extension, the conversion from 2 x dwellinghouse into 4 x 1-bed flats, 1 x roof light on each side elevation, all following the demolition of rear extensions and detached garages","appeal_decision":null,"date_building_work_started_under_previous_permission":null,"epc_number":"9340-2260-5420-2024-4531","last_updated":"2026-07-21T22:00:14.755Z","centroid":{"lon":-0.422336,"lat":51.577032},"lpa_name":"Hillingdon","secondary_street_name":null,"application_details":{"projected_cost_of_works":"Up to £2m","residential_details":{"total_no_existing_residential_units_shared_equity":0,"total_no_proposed_residential_units":4,"total_no_existing_residential_units_market_for_sale":0,"total_no_existing_residential_units_affordable_rent":0,"total_no_existing_residential_units_london_living_rent":0,"habitable_rooms_density":null,"total_no_existing_residential_units_london_shared_ownership":0,"total_no_proposed_residential_affordable_units":0,"total_no_existing_residential_units_london_affordable_rent":0,"total_no_existing_residential_units_discount_market_rent_charged_at_london_rents":0,"affordable_percentage":0.0,"total_no_existing_residential_units_discount_market_sale":0,"total_no_proposed_residential_units_affordable_rent":0,"total_no_existing_residential_units_discount_market_rent":0,"total_no_existing_residential_units_self_build_and_custom_build":0,"total_no_proposed_residential_units_shared_equity":0,"total_gia_gained":254,"dwelling_density":0,"total_no_existing_residential_units_intermediate":0,"total_no_proposed_residential_units_intermediate":0,"total_no_existing_residential_affordable_units":0,"total_no_proposed_residential_units_self_build_and_custom_build":0,"total_no_proposed_residential_units_starter_homes":0,"total_no_proposed_residential_units_discount_market_sale":0,"total_no_proposed_residential_units_discount_market_rent":0,"total_no_existing_residential_units_starter_homes":0,"total_no_proposed_residential_units_london_affordable_rent":0,"total_gia_lost":153.6,"total_no_proposed_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_proposed_residential_units_market_for_rent":4,"total_no_proposed_residential_units_market_for_sale":0,"total_no_existing_residential_units":2,"residential_units":[{"no_habitable_rooms":5,"change_type":"Loss","garden_land":true,"sheltered_accommodation":false,"no_bedrooms":3,"unit_type":"Semi Detached Home","provision_for_older_persons":false,"tenure":"Market for rent","gia":77.4},{"no_habitable_rooms":5,"change_type":"Loss","garden_land":true,"sheltered_accommodation":false,"no_bedrooms":3,"unit_type":"Semi Detached Home","provision_for_older_persons":false,"tenure":"Market for rent","gia":76.2},{"no_habitable_rooms":2,"provider":"Private rented sector","change_type":"Gain","garden_land":true,"no_bedrooms":1,"unit_type":"Flat Apartment Maisonette","tenure":"Market for rent","gia":59},{"no_habitable_rooms":2,"provider":"Private rented sector","change_type":"Gain","garden_land":true,"no_bedrooms":1,"unit_type":"Flat Apartment Maisonette","tenure":"Market for rent","gia":59},{"no_habitable_rooms":2,"provider":"Private rented sector","change_type":"Gain","garden_land":true,"no_bedrooms":1,"unit_type":"Semi Detached Home","tenure":"Market for rent","gia":68},{"no_habitable_rooms":2,"provider":"Private rented sector","change_type":"Gain","garden_land":true,"no_bedrooms":1,"unit_type":"Semi Detached Home","tenure":"Market for rent","gia":68}],"total_no_existing_residential_units_market_for_rent":2,"total_no_proposed_residential_units_london_living_rent":0,"total_no_proposed_residential_units_social_rent":0,"total_no_proposed_bedrooms":4,"total_no_existing_residential_units_social_rent":0,"total_no_proposed_residential_units_london_shared_ownership":0},"green_suds":false,"internal_resi_water_usage":105,"scheme_phasing":true,"total_gia_existing":153.6,"existing_proposed_floorspace_details":[{"gia_existing":153.6,"use_class":"C3","gia_gained":117.6,"gia_lost":42.1}],"grey_water_reuse":false,"surface_water_discharge_percentage_reduction":30,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_gia_existing":153.6,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_lost":42.1,"total_gia_gained":117.6},"total_gia_lost":42.1,"garden_land_lost":true,"infrastructure_details":{"mobile_network_operators_consultation":false,"no_active_slow_ev_charging_points":2,"waste_provision":true,"fire_suppression_system_proposed":false,"ghg_reduction_over_building_regulations":false,"no_new_gas_connections_required":0,"total_annual_nox_emissions":0,"no_new_water_connections_required":0,"no_passive_slow_ev_charging_points":0,"green_roof_area":0,"no_homes_to_have_electrical_heating":0,"no_resi_units_to_have_full_fibre":4,"no_homes_passive_cooling":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_pm_emissions":0,"percentage_demolition_construction_material_recycling":0},"existing_uprns":null,"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"Entire Development","intended_completion_date":"06/2027","intended_commencement_date":"06/2026"}],"total_gia_gained":117.6,"ownership_status":"Private","rain_water_harvesting":true,"site_area":0.10250000000000001},"wgs84_polygon":null,"id":"Hillingdon-79873_APP_2026_104","reference_no_of_permission_being_relied_on":null,"title_number":null,"last_updated_by":"CSV Data Import"}