{"decision_target_date":"29/05/2026","url_planning_app":"http://planning.hillingdon.gov.uk/OcellaWeb/planningDetails?reference=79914/APP/2026/345","centroid":{"lat":51.527314,"lon":-0.425699},"decision_date":"27/05/2026","last_synced":"2026-08-26T03:24:13.620Z","wgs84_polygon":{"coordinates":[[[-0.425706,51.527235],[-0.425615,51.527223],[-0.425535,51.527213],[-0.425465,51.527204],[-0.425545,51.527282],[-0.425573,51.527314],[-0.425629,51.527377],[-0.425714,51.527481],[-0.425718,51.527479],[-0.425725,51.527476],[-0.425731,51.527472],[-0.425737,51.527469],[-0.425743,51.527465],[-0.425753,51.527457],[-0.425755,51.527455],[-0.425766,51.527444],[-0.425775,51.527431],[-0.425777,51.527429],[-0.425783,51.527419],[-0.42579,51.527404],[-0.425853,51.527279],[-0.42578,51.527269],[-0.425785,51.527245],[-0.425726,51.527237],[-0.425706,51.527235]]],"type":"Polygon"},"epc_number":null,"last_date_consultation_comments":"20/05/2026","decision_process":"Delegated","site_number":70,"last_updated":"2026-08-25T22:00:14.286Z","decision":"Approved","actual_commencement_date":null,"appeal_decision_date":null,"status":"Approved","bo_system":"CSV Data Import","cil_liability":true,"development_type":null,"parking_details":null,"application_details":{"affordable_housing_fast_track":false,"residential_details":{"total_no_existing_residential_units_social_rent":0,"total_no_proposed_residential_units_social_rent":0,"total_no_proposed_residential_units_market_for_sale":1,"total_no_proposed_residential_units_market_for_rent":0,"total_no_existing_residential_units_shared_equity":0,"total_no_existing_residential_units_intermediate":0,"total_no_existing_residential_units_london_shared_ownership":0,"total_no_proposed_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_existing_residential_units_london_affordable_rent":0,"total_no_existing_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_existing_residential_units_affordable_rent":0,"total_no_existing_residential_units_market_for_rent":0,"total_no_existing_residential_units_london_living_rent":0,"total_no_proposed_residential_units_london_affordable_rent":0,"total_no_proposed_residential_affordable_units":0,"habitable_rooms_density":null,"total_gia_gained":70,"total_no_proposed_residential_units_self_build_and_custom_build":0,"total_no_existing_residential_units_discount_market_rent":0,"total_no_existing_residential_units":0,"total_no_existing_residential_affordable_units":0,"dwelling_density":0,"total_no_proposed_residential_units_intermediate":0,"total_no_proposed_residential_units_shared_equity":0,"total_no_existing_residential_units_discount_market_sale":0,"affordable_percentage":0.0,"total_no_proposed_residential_units_starter_homes":0,"total_no_existing_residential_units_self_build_and_custom_build":0,"total_no_existing_residential_units_starter_homes":0,"total_no_proposed_residential_units_affordable_rent":0,"total_no_proposed_residential_units_discount_market_rent":0,"total_no_proposed_residential_units":1,"total_no_proposed_residential_units_discount_market_sale":0,"total_no_existing_residential_units_market_for_sale":0,"residential_units":[{"no_habitable_rooms":2,"provider":"Private","change_type":"Gain","no_bedrooms":2,"unit_type":"House or Bungalow","tenure":"Market for sale","gia":70}],"total_no_proposed_bedrooms":2,"total_no_proposed_residential_units_london_living_rent":0,"total_no_proposed_residential_units_london_shared_ownership":0,"total_gia_lost":0},"phasing_details":[{"phase_detail":"demolition of garage","intended_commencement_date":"04/2026","intended_completion_date":"04/2026"},{"phase_detail":"excavation of foundations","intended_commencement_date":"04/2026","intended_completion_date":"04/2026"}],"green_suds":false,"scheme_phasing":true,"site_area":0.035,"total_gia_lost":0,"surface_water_discharge_percentage_reduction":10,"projected_cost_of_works":"Up to £2m","ownership_status":"Private","garden_land_lost":false,"infrastructure_details":{"no_homes_passive_cooling":0,"total_annual_pm_emissions":0,"percentage_demolition_construction_material_recycling":10,"waste_provision":true,"no_resi_units_to_have_full_fibre":1,"urban_greening_factor_score":0,"no_new_water_connections_required":1,"total_annual_nox_emissions":0,"green_roof_area":0,"fire_suppression_system_proposed":false,"no_non_resi_units_to_have_full_fibre":0,"mobile_network_operators_consultation":false,"no_new_gas_connections_required":1,"ghg_reduction_over_building_regulations":false,"no_homes_to_have_electrical_heating":0},"total_gia_existing":120,"total_gia_gained":0,"existing_proposed_floorspace_details":[{"gia_existing":120,"use_class":"C3","gia_gained":0,"gia_lost":0}],"grey_water_reuse":false,"non_residential_details":{"total_gia_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_lost":0,"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_gia_existing":120},"internal_resi_water_usage":110,"rain_water_harvesting":false,"occupation_status":"Occupied"},"pp_id":"14693388","last_updated_by":"CSV Data Import","reference_no_of_permission_being_relied_on":null,"appeal_start_date":null,"lapsed_date":"27/05/2029","postcode":"UB4 8AB","uprn":null,"application_type":"All Other","subdivision_of_building":"garage land adjacent to site","ward":"CHARVILLE 2022","borough":"Hillingdon","id":"Hillingdon-79914_APP_2026_345","appeal_decision":null,"street_name":"HAYES","secondary_street_name":null,"lpa_name":"Hillingdon","date_building_work_completed_under_previous_permission":null,"title_number":null,"description":"Erection of a dwellinghouse with associated parking and bin storage, following demolition of garage.","decision_conditions":["The development hereby permitted shall be begun before the expiration of three years from the date of this permission.","REASON","To comply with Section 91 of the Town and Country Planning Act 1990.","The development hereby permitted shall not be carried out except in complete accordance with the details shown on submitted plans numbers:","Site Location Plan","01 - Existing Site/Roof Plan","02 - Proposed Site/Roof Plan","03 - Proposed Floor Plans","04 - Proposed Elevations","and shall thereafter be retained/maintained for as long as the development remains in existence.","REASON","To ensure the development complies with the provisions of the Hillingdon Local Plan Part 1 (2012), Part 2 (2020) and the London Plan (2021).","No development above ground level shall take place until a scheme for the provision of sustainable water management and water efficiency shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall:","i. Provide information about the design storm period and intensity, the method employed to delay and control the surface water discharged from the site and the measures taken to prevent pollution of the receiving groundwater and/or surface waters;","ii. Include a timetable for its implementation; and","iii. Provide a management and maintenance plan for the lifetime of the development","The scheme shall also demonstrate the use of methods to minimise the use of potable water through water collection, reuse and recycling and will:","iv. Provide details of water collection facilities to capture excess rainwater;","v.  Provide details of how rain and grey water will be recycled and reused in the development;","vi. Provide details of how the dwelling will achieve a wat","Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (as amended) (or any order revoking and re-enacting that Order with or without modification), no additional windows, doors or other openings shall be constructed in the first floor walls or roof slopes of the proposed dwelling or existing dwelling.","REASON","To prevent overlooking to adjoining properties in accordance with Policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020).","Prior to the construction of the hereby approved dwelling details of step free access via all points of entry and exit for each of the dwellings shall be submitted to, and approved in writing, by the Local Planning Authority. Such provision shall remain in place for the life of the building.","REASON","To ensure housing of an inclusive design is achieved and maintained in accordance with Policies D5 and D7 of the London Plan (2021).","The dwelling hereby approved shall accord with the requirements of Policy D7 of the London Plan, and shall not be occupied until certification of compliance with the technical specifications for an M4(2) dwelling, as set out in Approved Document M to the Building Regulations (2010) 2015, has been submitted to, and approved in writing, by the Local Planning Authority. All such provisions must remain in place for the life of the building.","REASON","To not only allow the Building Control body to require the development to comply with the optional Building Regulations standards, but to also ensure the appropriate quantity and standard of accessible and adaptable housing is constructed and maintained in accordance with Policy D7 of the London Plan (2021).","No development above ground level shall take place until details of all materials and external surfaces (associated with the proposed development) have been submitted to and approved in writing by the Local Planning Authority. Thereafter the development shall be constructed in accordance with the approved details and be retained as such.","Details should include information relating to make, product/type, colour and photographs/images.","REASON","To ensure that the development presents a satisfactory appearance in accordance with Policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020).","No development above ground level shall take place until a landscape scheme has been submitted to and approved in writing by the Local Planning Authority. The scheme shall include:","1. Details of Soft Landscaping","1.a Planting plans (at not less than a scale of 1:100)","1.b Written specification of planting and cultivation works to be undertaken","1.c Schedule of plants giving species, plant sizes, and proposed numbers/densities where appropriate","2. Details of Hard Landscaping","2.a Refuse Storage (for both dwellings, secure and enclosed)","2.b Cycle Storage (2 cycle storage spaces shall be provided for the existing and proposed dwelling and the storage facilities shall be secure and enclosed)","2.c Means of enclosure/boundary treatments","2.d Hard Surfacing Materials","2.e External Lighting (Including positions)","2.f Other structures","3. Schedule for Implementation","Thereafter the development shall be carried out and maintained in full accordance with the approved details.","REASON","To ensure that the","Prior to development commencing, a demolition and construction management plan shall be submitted to and approved in writing by the Local Planning Authority. The plan shall detail:","(i) The phasing of development works","(ii) The hours during which development works will occur (please refer to informative I15 for maximum permitted working hours).","(iii)Measures to prevent mud and dirt tracking onto footways and adjoining roads (including wheel washing facilities).","(iv) Traffic management and access arrangements (vehicular and pedestrian) and parking provisions for contractors during the development process (including measures to reduce the numbers of construction vehicles accessing the site during peak hours).","(vi Measures to reduce the impact of the development on local air quality and dust through minimising emissions throughout the demolition and construction process.","(vi) The storage of demolition/construction materials on site.","(vii) Measures to reduce the impact of construction on t","Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (or any order revoking and re-enacting that Order with or without modification); no garage(s), shed(s) or other outbuilding(s), nor extension or roof alteration to the dwellinghouse hereby approved shall be erected without the grant of further specific permission from the Local Planning Authority.","REASON","To protect the character and appearance of the area and amenity of residential occupiers in accordance with Policies DMHB 11 and DMHD 2 of the Hillingdon Local Plan Part 2 (2020).","(i) The development hereby permitted (excluding demolition, site clearance and initial ground investigation works) shall not commence until a scheme to deal with unacceptable contamination, (including asbestos materials detected within the soil), has been submitted to and approved by the Local Planning Authority (LPA). All works which form part of any required remediation scheme shall be completed before any part of the development is occupied or brought into use unless the Local Planning Authority dispenses with any such requirement specifically and in writing. The scheme shall include the following measures unless the LPA dispenses with any such requirement specifically and in writing:","a) A desk-top study carried out by a competent person to characterise the site and provide information on the history of the site/surrounding area and to identify and evaluate all potential sources of contamination and impacts on land and water and all other identified receptors relevant to the site:","The decision to GRANT planning permission has been taken having regard to all relevant planning legislation, regulations, guidance, circulars and Council policies, including The Human Rights Act (1998) (HRA 1998) which makes it unlawful for the Council to act incompatibly with Convention rights, specifically Article 6 (right to a fair hearing); Article 8 (right to respect for private and family life); Article 1 of the First Protocol (protection of property) and Article 14 (prohibition of discrimination).","The decision to GRANT planning permission has been taken having regard to the policies and proposals in the Hillingdon Local Plan Part 1 (2012) and Part 2 (2020) set out below, including Supplementary Planning Guidance, and to all relevant material considerations, including The London Plan (2021) and national guidance.","Under the terms of the Planning Act 2008 (as amended) and Community Infrastructure Levy Regulations 2010 (as amended), this development is liable to pay the London Borough of Hillingdon Community Infrastructure Levy (CIL) and the Mayor of London's Community Infrastructure Levy (CIL). This will be calculated in accordance with the London Borough of Hillingdon CIL Charging Schedule 2014 and the Mayor of London's CIL Charging Schedule 2012. Before commencement of works the development parties must notify the London Borough of Hillingdon of the commencement date for the construction works (by submitting a Commencement Notice) and assume liability to pay CIL (by submitting an Assumption of Liability Notice) to the Council at planning@hillingdon.gov.uk. The Council will then issue a Demand Notice setting out the date and the amount of CIL that is payable. Failure to submit a valid Assumption of Liability Notice and Commencement Notice prior to commencement of the development may result in su","Nuisance from demolition and construction works is subject to control under The Control of Pollution Act 1974, the Clean Air Acts and other related legislation. In particular, you should ensure that the following are complied with:-","A. Demolition and construction works which are audible at the site boundary shall only be carried out between the hours of 08.00 and 18.00 hours Monday to Friday and between the hours of 08.00 hours and 13.00 hours on Saturday. No works shall be carried out on Sundays, Bank or Public Holidays.","B. All noise generated during such works shall be controlled in compliance with British Standard Code of Practice BS 5228:2009.","C. Dust emissions shall be controlled in compliance with the Mayor of London's Best Practice Guidance' The Control of dust and emissions from construction and demolition.","D. No bonfires that create dark smoke or nuisance to local residents.","You are advised to consult the Council's Environmental Protection Unit (www.hillingdon.gov.uk/nois","Wildlife and Countryside Act 1981:  Note that it is an offence under this act to disturb roosting bats, nesting birds or any other protected species.  Therefore, if applicable, it is advisable to consult your tree surgeon / consultant to agree an acceptable time for carrying out the approved works."],"application_type_full":"Full planning permission","actual_completion_date":null,"locality":null,"centroid_easting":509308.0,"lpa_app_no":"79914/APP/2026/345","valid_date":"30/03/2026","polygon":{"geometries":[{"coordinates":[[[509307.7,182099.15],[509314.011,182098.001],[509319.615,182096.98],[509324.45,182096.1],[509318.7,182104.65],[509316.7,182108.1],[509312.7,182115.1],[509306.55,182126.5],[509306.25,182126.25],[509305.8,182125.9],[509305.35,182125.5],[509304.95,182125.1],[509304.55,182124.65],[509303.85,182123.75],[509303.75,182123.6],[509303,182122.35],[509302.4,182120.9],[509302.3,182120.65],[509301.9,182119.55],[509301.45,182117.85],[509297.4,182103.8],[509302.45,182102.8],[509302.15,182100.15],[509306.3,182099.4],[509307.7,182099.15]]],"type":"Polygon"}],"type":"GeometryCollection"},"decision_agency":"Borough","centroid_northing":182108.0,"site_name":"70 PARK LANE","appeal_status":null,"date_building_work_started_under_previous_permission":null}