{"actual_commencement_date":null,"date_building_work_completed_under_previous_permission":null,"lpa_name":"Hillingdon","subdivision_of_building":null,"appeal_decision":null,"lapsed_date":"24/04/2029","appeal_decision_date":null,"last_updated_by":"CSV Data Import","reference_no_of_permission_being_relied_on":null,"epc_number":"9218-5034-6215-5891-9940","last_updated":"2026-07-23T22:00:14.916Z","url_planning_app":"http://planning.hillingdon.gov.uk/OcellaWeb/planningDetails?reference=79936/APP/2026/470","street_name":"RUISLIP","parking_details":null,"ward":"SOUTH RUISLIP 2022","bo_system":"CSV Data Import","site_name":"92 WINGFIELD WAY","site_number":null,"application_details":{"no_additional_bedrooms":0,"existing_uprns":null,"intended_commencement_date":"03/2026","intended_completion_date":"06/2026","total_gia_gained":25.8,"no_additional_bathrooms":0},"uprn":null,"locality":null,"date_building_work_started_under_previous_permission":null,"postcode":"HA4 6RQ","valid_date":"24/02/2026","cil_liability":false,"actual_completion_date":null,"centroid":{"lat":51.550807,"lon":-0.403454},"centroid_easting":510794.0,"application_type_full":"Householder planning permission","pp_id":"14729787","lpa_app_no":"79936/APP/2026/470","polygon":null,"id":"Hillingdon-79936_APP_2026_470","appeal_status":null,"appeal_start_date":null,"description":"Erection of a single-storey rear extension, and front porch.","development_type":null,"decision_conditions":["The development hereby permitted shall be begun before the expiration of three years from the date of this permission.","REASON","To comply with Section 91 of the Town and Country Planning Act 1990.","The development hereby permitted shall not be carried out except in complete accordance with the details shown on Drawing Ref:","PL01 Location Plan & Site Plan","PL02 Existing Ground Floor Plan & Roof Plan","PL03 Existing Elevations & Section","PL04 Proposed Ground Floor Plan & Roof Plan","PL05 Proposed Elevations","REASON","To ensure the development complies with the provisions of the Hillingdon Local Plan: Part One - Strategic Policies (November 2012) and the Hillingdon Local Plan: Part Two - Development Management Policies (January 2020), and the London Plan (March 2021).","The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building and shall thereafter be retained as such.","REASON","To safeguard the visual amenities of the area and to ensure that the proposed development does not have an adverse effect upon the appearance of the existing building in accordance with Policy DMHB 11 of the Hillingdon Local Plan: Part Two - Development Management Policies (January 2020).","Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (as amended) (or any order revoking and re-enacting that Order with or without modification), no additional windows, doors or other openings shall be constructed in the walls of the development hereby approved facing 90 and 94 Wingfield Way.","REASON","To prevent overlooking to adjoining properties in accordance with Policy DMHB 11 of the Hillingdon Local Plan: Part Two - Development Management Policies (January 2020).","Access to the flat roof over the extension hereby approved shall be for maintenance or emergency purposes only and the flat roofs shall not be used as a roof garden, terrace, balcony, patio or similar amenity area.","REASON","To prevent overlooking to adjoining properties in accordance with policy policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020).","Nuisance from demolition and construction works is subject to control under The Control of Pollution Act 1974, the Clean Air Acts and other related legislation. In particular, you should ensure that the following are complied with:-","A. Demolition and construction works which are audible at the site boundary shall only be carried out between the hours of 08.00 and 18.00 hours Monday to Friday and between the hours of 08.00 hours and 13.00 hours on Saturday. No works shall be carried out on Sundays, Bank or Public Holidays.","B. All noise generated during such works shall be controlled in compliance with British Standard Code of Practice BS 5228:2009.","C. Dust emissions shall be controlled in compliance with the Mayor of London's Best Practice Guidance' The Control of dust and emissions from construction and demolition.","D. No bonfires that create dark smoke or nuisance to local residents.","You are advised to consult the Council's Environmental Protection Unit (www.hillingdon.gov.uk/nois","The Council will recover from the applicant the cost of highway and footway repairs, including damage to grass verges.","Care should be taken during the building works hereby approved to ensure no damage occurs to the verge or footpaths during construction. Vehicles delivering materials to this development shall not override or cause damage to the public footway. Any damage will require to be made good to the satisfaction of the Council and at the applicant's expense.","For further information and advice contact - Highways Maintenance Operations, Central Depot - Block K, Harlington Road Depot, 128 Harlington Road, Hillingdon, Middlesex, UB3 3EU (Tel: 01895 277524).","For Private Roads: Care should be taken during the building works hereby approved to ensure no damage occurs to the verge of footpaths on private roads during construction. Vehicles delivering materials to this development shall not override or cause damage to a private road and where possible alternative routes should be ta","The road in front of the application site is located within a Flood Map for Surface Water, as identified in the Surface Water Management Plan (SWMP) for Hillingdon. All developments in this area must contribute to managing the risk of flooding from surface water by reducing surface water runoff from the site. Therefore the applicant should minimise the water from the site entering the sewers. No drainage to support the extensions should be connected to any existing surface water sewer, other than as an overflow. Water run off from any roof or hard paving associated with e development should be directed to a soakaway, or tank or made permeable. This includes any work to front gardens not part of the planning application, which must be permeable or be collected and directed to a permeable area, otherwise it would need an additional permission. A water butt should be incorporated.","You are advised that if any part of the development hereby permitted encroaches by either its roof, walls, eaves, gutters, or foundations, then a new planning application may have to be submitted. The validity of this planning permission may be challengeable by third parties if the development results in any form of encroachment onto land outside the applicant's control for which the appropriate Notice under Article 13 of the Town and Country Planning (Development Management Procedure) (England) Order 2015 has not been served."],"last_synced":"2026-07-24T02:38:37.066Z","secondary_street_name":null,"title_number":null,"last_date_consultation_comments":"26/03/2026","decision_process":"Delegated","centroid_northing":184754.0,"borough":"Hillingdon","decision":"Approved","application_type":"Householder","wgs84_polygon":null,"decision_agency":"Borough","decision_target_date":"27/04/2026","status":"Approved","decision_date":"24/04/2026"}