{"uprn":null,"ward":"PINKWELL 2022","epc_number":null,"description":"Installation of two new transformer bays within the existing North Hyde Substation (National Grid 66kV compound).","centroid_easting":510371.0,"decision_date":"31/07/2026","street_name":"NORTH HYDE GARDENS","locality":null,"status":"Approved","date_building_work_started_under_previous_permission":null,"application_type_full":"Full planning permission","lpa_name":"Hillingdon","decision_target_date":"11/08/2026","lpa_app_no":"80130/APP/2026/1476","title_number":null,"decision":"Approved","last_updated":"2026-10-29T23:00:11.669Z","appeal_start_date":null,"actual_commencement_date":null,"bo_system":"CSV Data Import","secondary_street_name":"HAYES","decision_agency":"Borough","last_date_consultation_comments":"21/07/2026","appeal_decision_date":null,"actual_completion_date":null,"centroid_northing":179004.0,"wgs84_polygon":null,"date_building_work_completed_under_previous_permission":null,"lapsed_date":"31/07/2029","decision_conditions":["The development hereby permitted shall be begun before the expiration of three years from the date of this permission.","REASON","To comply with Section 91 of the Town and Country Planning Act 1990.","The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers :","- Site Location Plan","- LONDPSS2-JSM-SS-01-DR-E-00003 P01","- LONDPSS2-JSM-SS-01-DR-E-00011 P01","- LONDPSS2-JSM-SS-01-DR-E-00012 P01","and shall thereafter be retained/maintained for as long as the development remains in existence.","REASON","To ensure the development complies with the provisions Hillingdon Local Plan Parts 1 (November 2012) and 2 (January 2020) and the London Plan (2021).","The decision to GRANT planning permission has been taken having regard to all relevant planning legislation, regulations, guidance, circulars and Council policies, including The Human Rights Act (1998) (HRA 1998) which makes it unlawful for the Council to act incompatibly with Convention rights, specifically Article 6 (right to a fair hearing); Article 8 (right to respect for private and family life); Article 1 of the First Protocol (protection of property) and Article 14 (prohibition of discrimination).","On this decision notice policies from the Councils Local Plan: Part 1 - Strategic Policies appear first, then relevant Local Plan Part 2 (2020), then London Plan Policies (2021). Hillingdon's Full Council adopted the Hillingdon Local Plan: Part 1 - Strategic Policies on 8 November 2012 and the Hillingdon Local Plan Part 2 on 16 January 2020.","Nuisance from demolition and construction works is subject to control under The Control of Pollution Act 1974, the Clean Air Acts and other related legislation. In particular, you should ensure that the following are complied with:-","A. Demolition and construction works which are audible at the site boundary shall only be carried out between the hours of 08.00 and 18.00 hours Monday to Friday and between the hours of 08.00 hours and 13.00 hours on Saturday. No works shall be carried out on Sundays, Bank or Public Holidays.","B. All noise generated during such works shall be controlled in compliance with British Standard Code of Practice BS 5228:2009.","C. Dust emissions shall be controlled in compliance with the Mayor of London's Best Practice Guidance' The Control of dust and emissions from construction and demolition.","D. No bonfires that create dark smoke or nuisance to local residents.","You are advised to consult the Council's Environmental Protection Unit (www.hillingdon.g","Please review our attached plans, which detail the Cadent gas asset/s in the area. If your application affects one of our high pressure pipelines, it is a statutory requirement that you input the details into the HSE's Planning Advice Web App. For further details visit www.hse.gov.uk/landuseplanning/planning-advice-web-app.htm","Cadent may have a Deed of Easement on the pipeline, which provides us with a right of access for a number of functions and prevents change to existing ground levels and storage of materials. It also prevents the erection of permanent/temporary buildings, or structures. If necessary Cadent will take action to legally enforce the terms of the easement.","This letter does not constitute any formal agreement or consent for any proposed development work either generally or related to Cadent's easements or other rights, or any planning or building regulations applications.","Cadent Gas Ltd or their agents, servants or contractors do not accept any liability for any loss","Construction Techniques - It is recommended that the ground penetrating structure/s / extension / outbuilding / porch / building / electrical supply cables and panels is/are designed and constructed to prevent/minimise the possible entry of any migrating landfill gas/ground gas. Please contact your building surveyor and/or architect if you require advice concerning suitable construction techniques.","The Council's records show that the development site is within 250 metres of a landfill buffer and or may have ground conditions which suggest possible ground gas risks.","There is a possibility there may be some contaminating substances in the ground at the site. Our contaminated land record shows the site to be on a former potentially contaminated land use identified as electricity substation and MOD Land/Riffle Range. We would advise persons working on site to take basic precautions in relation to any contamination they may find.","You are advised this development is on a former potentially contaminated land use identified as electricity substation and MOD Land/Riffle Range. Therefore, the above advice is provided on the grounds of Health and Safety of the workers on site and to ensure the appropriate restoration of the site is done should there be any contamination identified during the development where there is a need, for groundwork once such works are complete to minimise risk to the occupants of the site."],"id":"Hillingdon-80130_APP_2026_1476","application_type":"All Other","pp_id":"14936454","parking_details":null,"url_planning_app":"http://planning.hillingdon.gov.uk/OcellaWeb/planningDetails?reference=80130/APP/2026/1476","appeal_status":null,"valid_date":"16/06/2026","site_number":null,"application_details":{"non_residential_details":{"total_gia_gained":0,"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_gia_lost":0,"total_gia_existing":6734,"total_non_resi_gross_internal_floor_area_to_be_lost":0},"garden_land_lost":false,"ownership_status":"Private","infrastructure_details":{"total_annual_pm_emissions":0,"no_homes_to_have_electrical_heating":0,"no_homes_passive_cooling":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"ghg_reduction_over_building_regulations":false,"mobile_network_operators_consultation":false,"no_new_gas_connections_required":0,"percentage_demolition_construction_material_recycling":0,"waste_provision":false,"no_new_water_connections_required":0,"fire_suppression_system_proposed":false,"green_roof_area":0,"no_resi_units_to_have_full_fibre":0},"total_gia_lost":0,"scheme_phasing":true,"existing_proposed_floorspace_details":[{"gia_existing":6734,"use_class":"SG","gia_gained":0,"gia_lost":0}],"grey_water_reuse":false,"total_gia_existing":6734,"total_gia_gained":0,"phasing_details":[{"phase_detail":"Entire Develpment","intended_commencement_date":"06/2026","intended_completion_date":"10/2027"}],"affordable_housing_fast_track":false,"site_area":0.6734,"projected_cost_of_works":"Between £2m and £100m","rain_water_harvesting":false,"internal_resi_water_usage":0,"surface_water_discharge_percentage_reduction":0,"green_suds":false},"site_name":"National Grid 66kV Compound","decision_process":"Delegated","postcode":"UB3 4QQ","last_updated_by":"CSV Data Import","centroid":{"lat":51.499209,"lon":-0.411352},"polygon":null,"appeal_decision":null,"borough":"Hillingdon","last_synced":"2026-10-30T02:51:16.559Z","cil_liability":false,"subdivision_of_building":"The proposed works comprise installation of 2 no. new 66kV bays within the existing North Hyde Substation.\n\n","development_type":null,"reference_no_of_permission_being_relied_on":null}